Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel on Site

Site Set Up

  • Has site set up been completed correctly?

  • Include photo's of site set up.

Safety Planning Provisions

  • Do fitters have a copy of the plan of works?

  • Has the Plan of Work been read and understood?

  • Does the Plan of Work cover the works being undertaken?

  • Do all fitters hold a current CSCS cards?

  • If required, have the fitters signed in each day?

  • Who on site have the fitters reported to?

  • Has the asbestos register for the work areas been checked?

  • Is it confirmed that no asbestos is present in the work area?

  • Have the fitters been inducted to site including first aid, fire and emergency arrangements?

  • What alternative arrangement have been made in the event of an emergency?

  • Have any additional hazards been identified or additional control measures put in place?

  • Detail the hazards and control measures.

  • Add media

  • Has this been noted on the appropriate section of the Plan of Works?

  • Are copies of the risk assessments on site and available?

  • Are the risk assessments for the work suitable and sufficient?

  • Are copies of the method statement on site and available?

  • Are details of the nearest A&E department detailed in the Method Statement?

  • Is the canopy being erected as per the Method Statement?

  • Are the fitters aware of the accident reporting procedure (as per the Health and Safety Policy)?

  • Are Welfare Facilities available and sufficient?

  • What Welfare Facilities are in place?

  • Is safe access and egress available for the works?

  • Are the work vehicles parked in the agreed locations and cordoned off?

  • Has the the work area been segregated and adequate signage displayed?

  • Is there any working at height above 3m involved?

  • What is the estimated maximum working height and what access arrangements have been made?

  • Is there adequate planning provision in place for Working at Height?

  • Are the fitters competent to Working at Height?

  • Are the fitters using the correct access equipment?

  • Has the access equipment been inspected and tagged?

  • Are there adequate team numbers for the works being undertaken?

PPE / RPE

  • Are fitters wearing safety boots?

  • Do the fitters have High Viz Vests / Jackets available?

  • Do the fitters have hard hats available?

  • Do the fitters have cut-proof safety gloves available?

  • Do the fitters have Safety Glasses available?

  • Are the fitters wearing all other PPE required by the site and as per the Method Statement?

  • Is RPE required and being used?

  • Are spare filters available for each mask being used?

  • If using paper masks, are they suitable for the task?

Equipment

  • Is an Aliport ladder in use for the project?

  • Is the ladder tag in date?

  • Ladder No. and Due Date..

  • Photo of Tag

  • Is the ground suitable for the use of ladders?

  • If in use, is the overall condition of the ladder acceptable?

  • Do the fitters have adequate tools to undertake the works?

  • Are the tools in a good condition? (In particular check teeth of saw blades / blade of Stanley knife)

  • Photo of tools.

  • Are the fitters using, or have any hand tools that are not supplied or approved by Aliport?

  • Please list items.

  • Are all tools PAT tested and in date?

  • Are fitters using, or have any power tools that are not supplied or approved by Aliport?

  • Please list items.

  • Are there trailing leads on site? (trip hazards)

  • Are there damaged tools, cables or plugs in use?

Activities

  • Are the fitters undertaking all works in a safe manner?

  • Is the work being undertaken in accordance with the Method Statement and Plan of Work?

  • Are the fitters taking all reasonable practicable steps to ensure the health, safety and welfare at work of themselves and all persons likely to be affected by their actions?

  • Is all contractors equipment 110v?

  • Is access and egress satisfactory?

  • Are the fitters using gloves when using any hand tools?

  • Has any access equipment (MEWPS, towers, etc..) been inspected prior to use by a competent person and tagged after assembly (If applicable)?

  • Is any work taking place in a confined space or other enclosed space, such as roof / floor voids, lift shafts, ducts or any other high risk areas?

  • Is there a safe method of work in place?

  • What emergency rescue plans and arrangements are in place?

  • Are any hot works taking place?

  • Is there a defined work regime in place?

  • Provide details of the work regime.

  • Is noise satisfactorily controlled and monitored if required?

  • Is the work area clean and tidy?

  • Are the materials and equipment safely stored on site?

For sites requiring foundations

  • Do the excavations have safe and secure access in and around them during working hours?

  • Are procedures in place for security of any open excavations outside of working hours?

Other

Vehicle

  • Registration Number, Make and Model.

  • Are the wipers satisfactory and the wash functions fully operational?

  • Are all of the lights working?

  • Are the tyre treads adequate?

  • Is the general condition of the vehicle adequate?

Environmental

  • Is all electrical equipment turned off when not in use? (where applicable)

  • Are waste materials separated between the skips for recycling? (where applicable)

Sign Off

Auditor Sign Off

  • Signed

  • Date

Personnel Sign Off

  • Name

  • Person
  • Signed

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.