Alliance GC Internal CQR:

  • Site conducted

  • Conducted on

  • Prepared by

Brief Health & Safety Review

  • Are Bucket Areas Set Up To Alliance Standards

  • Have Excavations Been Fenced Of With The Correct Fencing (No Bunting To Be Used On Any AGC Site)

  • Do We Have Walkways/Ped Holding Points To AGC Work Areas

  • Has Permit To Break Ground Been Completed And Area Cat Scanned

  • Are we breaking ground

  • Are All Plant Operatives Using The Seat Belts Correctly

  • Have The Keys Been Removed From Plant If Not In Use.

  • Who is the plant operative.

  • Are Mixing Bays Set Up To Alliance Standards

Untitled Page

Untitled Page

Untitled Page

Foundation Inspection:

  • Has the Foundation Been Founded To The Correct Depths

  • Does the foundation have steel and do we have the correct concrete cover

  • Has the foundation been inspected By NHBC or LABC, has any RI'S been given

  • Is the foundation concrete within tolerance of 10mm

Brickwork To FFL:

  • Has the block work been jointed both trench and concrete

  • Is the facing brick level and plum, with correct number of courses laid

  • Is the spacing between the Air Vents Correct & Flush to the brickwork

  • Are the Brick Ties laid 900mm Horizontal & 450mm Vertical

  • Have Fire Cavity Socks been installed on paired plots

  • Is the cavity 225mm down from lowest damp ie under floor beams.

  • Has the cavity been cleaned

Oversite:

  • Has the internal drainage been laid to correct falls & S Bends bedded on concrete.

  • Has black jack been applied to the cut edge of beams. (cavity

  • Has the membrane been cut into the corners correctly

  • Does the oversite have a good quality finish

External Drainage & Services:

  • Has the drainage been laid to the correct level and bedded on gravel

  • Has SVP/WC been connected to the main channel on the inspection chambers

  • Are the inspection chambers to the correct depths

  • Have all Inspection chambers in driveways been moved to the center.

  • Have all Inspection Chamber Covers been secured

  • Has all down spout/Rain water caps been left at 3 below

  • Have services been laid to the correct depth, spacing & water insulated and mechanical cap fitted to BOTH ends.

External Works:

  • Do we have the correct falls to drives

  • Has the paving been laid to correct levels

  • Have manhole been cut down to finished level

  • Have the gravel margins been completed

  • Has the topsoil been laid to the correct level & not bridging the DPC & Air Vents

  • Have retaining walls been constructed to the drawing issued by the client

  • Is tanking, DDPM & Under build required to plots.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.