Project: Amalfi A1/A2, Tustin, CA
-
System: BUR/PVC Substrate, BUR/PVC Membrane Install, BUR/PVC Final
-
Log Number
-
Conducted on:
-
Weather
-
Time On-Site
-
Time Off-Site
-
Hours On-Site
-
Reported By
- Dan Griffith - ATI
- Tiffani S. Patlan - ATI
- Jason Hartless - ATI
- Max Faraji - ATI
- Jedidiah Brandman - ATI
- Thuan Pham - ATI
-
Reported to: Sid Thulin - The Irvine Company
-
Present at site
-
Location:
Checklist
BUR/PVC Substrate
-
1. Substrate is clean and ready for roof installation.
-
2. Plywood sheathing review (review for voids, separation, gaps, splintering, etc.).
-
3. Confirm sheathing fasteners flush with substrate.
-
4. Crickets installed.
-
5. Top of parapet framing slopes inward.
-
6. Penetrations are flashed in.
-
7. Penetrations are 8" minimum above finished roof surface.
-
8. Verify slope to drains.
-
9. Vent penetrations 18" distance, center to center, from vents, valleys and crickets.
-
10. Abandoned penetrations at substrate repaired prior to roof installation.
-
11. 2% slope minimum marked by contractor and verified.
BUR/PVC Membrane Install
-
1. Substrate is clean and ready for installation.
-
2. Review roof membrane installation.
-
3. Hot asphalt temperature per manufacturer's requirements.
-
4. Tapered edge strips and cant strips installed where required.
-
5. Base sheet fastening pattern verified.
-
6. Felt plies are set in the hot asphalt.
-
7. Surfacing ply installed at base flashings.
-
8. Base flashing plies installed.
-
9. Penetration flashings primed, set in mastic and stripped in.
-
10. Walk pads are installed.
-
11. Roof drain accessories installed including grate rings. Roof drain lead flashings primed and set in mastic, stripped in.
-
12. Roof membrane laps reviewed.
-
13. Roof membrane shingled.
-
14. PVC target sheets installed at roof drain and sealant applied.
-
15. PVC coverboard installed and fastening pattern reviewed.
-
16. PVC membrane probed and marked. PVC membrane welds repaired where noted. PVC membrane test cuts at welds performed and patched.
-
17. PVC test welds verified and samples available for review.
-
18. Hot rubber, plywood joints stripped in prior to waterproofing installation.
-
19. Hot rubberized asphalt temperature verified.
-
20. Hot rubber, neoprene flashing installed in hot rubber.
-
21. Hot rubber, reinforcing fabric set in hot rubber.
-
22. Hot rubber, protection layer set in hot rubber.
-
23. Hot rubber, 48 hour water test performed, pass/fail.
BUR/PVC Final
-
1. Gravel surfacing installed in flood coat.
-
2. Condensing units installed on top of platforms.
-
3. Roof clean of any construction debris.
-
4. Roof drain strainers are clean.
-
5. BUR/fishmouths repaired. Mastic and granules installed where required.
-
6. Walk pads are installed.
-
*** The items contained within this box correlate to the checklist published on the Irvine Company Quality Control portal and are listed here for our convenience of data entry within that system only. In no way is this list to be construed as an all-inclusive list of work performed by Architectural Testing, Inc. Note slight modifications were made to list for Roof Verification Letter only to be project specific.
Work In Progress
-
Work in Progress?
Observations
-
Substrate is clean and ready for roof installation.
-
Plywood sheathing review (review for voids, separation, gaps, splintering, etc.). Gaps between plywood sheathing are between 1/8" and 1/4". All issues are resolved prior to the completion of inspection.
-
Confirm sheathing fasteners flush with substrate.
-
Crickets installed in proper locations.
-
Top of parapet framing slopes inward.
-
Vertical penetrations are 8" minimum above finished roof surface.
-
Verify slope to drains.
-
Vent penetrations 18" distance, center to center, from vents, valleys and crickets.
-
2% slope minimum marked by contractor and verified.
-
Abandoned penetrations at substrate repaired prior to roof installation.
-
Review roof membrane installation.
-
Roof drain accessories installed including grate rings.
-
Built-Up flashing membrane and cap sheet flashing is installed over roofing cement and 8 inches up the vertical wall and fastened at the top. The flashing sheets lap a minimum of 4 inches onto the horizontal deck over the respective horizontal sheet.
-
Ensure all pipe penetrations have proper metal flashings, with mastic and granules around the perimeter of the penetration, and/or collars.
-
Ensure reglets and J-molds are installed in their proper places. Ensure reglet covers all fasteners on the vertical roofing.
-
Built-up target sheets installed at roof drain and roofing cement applied. Sheet metal sheet is installed into the depressed drain area.
-
Base sheet is installed and fastening pattern reviewed. Joints are not within 12 inches of each other.
-
There are no dry laps or fishmouths in the seams.
-
Pipe penetrations have hose clamp and sealant installed, tooled smooth.
-
Condensing units installed on top of platforms.
-
Roof clean of any construction debris.
-
Roof drain strainers are clean.
-
Walk pads are installed.
-
Built-Up deficiencies have been repaired (i.e., cuts, tears, fish-mouths, bubbles, exposed fasteners, and ponding areas).
-
Backer rods and sealant have been installed and applied where necessary.
-
Roof drain clamps are set in a bed of sealant.
-
2-piece reglet with wind clips is installed. Corners are to be a continuous reglet piece.
-
Metal coping is installed at parapet walls and fastened at 16" O.C.
-
Metal coping corner pieces are to be one piece, mechanically fastened and fully soldered watertight extending 12" each way.
-
Coping butts up against each other with a 4" splice plate centered at the joint.
-
Metal coping end pieces are to be one piece, mechanically fastened and fully soldered watertight with rounded bottom corners.
-
Filler board is installed between the concrete surface and step down at roof transition.
-
Others
Additional Notes
-
Items marked as N/A on the check list above do not apply at the time of the inspection or are not applicable to the system being installed for this project.
-
For BUR/PVC Substrate:
-
Initial inspection?
-
Follow-up required?
-
For BUR/PVC Membrane Install:
-
Initial inspection?
-
Follow-up required?
-
For BUR/PVC Final:
-
Initial inspection?
-
Follow-up required?