Information
-
Document No.
-
Job Name / Number
-
Conducted on
-
Prepared by
-
Location
Programs / Information
-
Safety Policy & Standard Operating Procedure Manual Onsite & Updated
-
Mandatory Postings Available (All-In One, OSHA 300, Emergency Contacts, Clinic Map, Permits)
-
All Material Safety Data Sheets Available On Site
-
Ca Hazardous Chemical / Ca Prop 65 Chemical Inventory Posted
-
Chemical Containers Properly Labeled & Stored
-
Hand Wash Stations & Port-A-Potties Serviced
-
New Hire Orientation & Mentor Policy Followed
-
Weekly Toolbox Safety Trainings Held
-
Topic Covered:
-
Daily Foreman Safety Huddles Held & Reviewed
Personal Protective Equipment
-
Hard Hats
-
Eye Protection
-
Hearing Protection
-
Appropriate Hand Protection
-
Respirators Or Dust Masks
-
High Visibility Garment (ANSI Class II Or III)
-
Foot Protection
Fall Protection (Zero Tolerance Item)
-
All Personnel Protected From Fall Height Greater Than 6'
-
Full Body Harness And Fall Restraint Attached (Aerial Work Platforms)
-
Perimeter Guard Railing In Use (Top Rail 42"-45" Mid Rail 1/2 Distance)
-
Floor Openings Barricaded or Covered, Marked & Secured
Housekeeping
-
No Excessive Debris Onsite
-
Lay-down Areas Organized, Piling & Stacking Secured
-
Nails Bent Or Removed
-
Adequate Supply Of Trash Receptacles
-
All Rebar And Similar Protrusions Capped Or Troughed
Fire Protection
-
Fire Extinguishers Certified Annually (Tag Current)
-
Fire Extinguishers Inspected Monthly And Tags Signed
-
Fire Extinguisher Nearby During Refueling, Welding, Cutting, Grinding
-
Fuel Dispensed From An Approved Self Closing Metal Container
Ladders (Zero Tolerance Item)
-
Ladders Inspected And In Good Condition
-
Employees Trained On Safe Ladder Use
-
Ladders In Use Are Properly Secured
-
Extension Ladders Extend 36" Above Landing
-
Employees Not Working From Top Cap or 1st Step Below
-
Ladders Not In Use Are Properly Stored
Electrical
-
Grounded / GFCI Protected
-
Cords, Plugs & Receptacles In Good Condition & Protected
Hand Tools
-
Whip Checks In Use On Pressurized Lines
-
Proper Tool In Use For Task, Proper PPE In Use
-
Defective Tools Tagged / Removed From Site
-
Safety Guards And Devices Installed (Zero Tolerance Item)
Equipment
-
Operator Trained, Authorized And Or Certified (Certification Proof Readily Available)
-
Pre-Inspection Check List Completed
-
Maintenance Inspection Current (Annual & 90 Day)
-
Required Manuals, Load Charts, With Equipment
-
Seatbelt In Use
-
Backup Alarm Functioning
-
Operating At Safe Speeds
-
Wheels Chocked On Mobile Equipment
Confined Space (Zero Tolerance Item)
-
Employees Trained (Supervisor, Attendant, Entrant)
-
Permit For Entry Completed & Posted
-
Continuous Air Monitoring Provided
-
Adequate Ventilation Provided (Blower/Fan)
-
Retrieval System In Place
Power Lines
-
Designated Spotter In Use
-
Adequate Safe Distance Maintained From Power Line (Min 10' Up To 50KV)
Scaffolds (Zero Tolerance Item)
-
Competent Person Designated And Identified
-
Scaffolding Tied Into Building (Ht>3xBase)
-
Planks Extend Over End Supports (Min 6" Max 18")
-
Platform Fully Planked At Least 20" Wide, No Gaps Greater Than 1", Secured
-
Scaffolding Set Plum w/ Foundation Bearing Plates
-
Top Rails (42"-45"), Mid Rails, Toe Boards
-
Adequate Access (Ladder), Inspected Daily & Tagged For Use
Trenching And Excavation (Zero Tolerance Item)
-
Competent Person Designated And Identified
-
Annual Permit Posted And Local Cal OSHA Office Notified (Over 5' In Depth)
-
Documented Daily Trench/Excavation Inspection Performed
-
Proper Protective System In Place (Over 5' In Depth)
-
Safe Access / Egress Provided (Ladders With In 25' Or Ramp <30 Deg.)
First Aid
-
Trained Personnel Available
-
Kits/Supplies Available & Maintained
Site/Public Protection
-
Fencing In Use & And In Good Condition
-
Lighting In Use
-
Barricades In Use
-
Hazard Warning Signs In Use
Subcontractors
-
Compliance With Company Safety Policies
-
Confined Space
-
Scaffolding
-
Trenching / Excavation
-
Weekly Toolbox Safety Training Held
-
All PPE Requirements Being Met
Heat Illness Prevention (Zero Tolerance Item)
-
Employees / Supervision Trained
-
New Employees Not Acclimated To Heat Under Additional Supervision
-
Cool Clean Drinking Water Supplied
-
Disposable Cups Provided w/ Trash Receptacle Nearby
-
Shade & Comfortable Seating Provided For Preventative Recovery Breaks
-
High Heat Provisions In Place (95 Deg. & Above)
-
Corrective Actions Taken / Summary
-
Project Supervision
-
Safety Specialist