Information
-
Contract :
- Contract 3057- Western Roads Upgrade--Capital Works Projects
- Contract 3057- Western Roads Upgrade-IRW -Initial Rehabilitation Works
- Contract 3057- Western Roads Upgrade-Maintenance
-
Contractor & Project Number :
-
Subcontractor(s)
-
Mile Stone and Job Details
-
Nominated Authority
-
Hold Point number (if known) :
-
Project Contact (Engineer)
-
Date and Time
-
Location
-
Prepared by
Observation
-
Weather
-
Temperature
-
Add media
-
Procedures / Plans / Tests Checked
-
Check list used :
-
Check List Used : Relavent VicRoads Standards and Specifications
-
Click + to add an Observation and photo
Observations
-
Add media
-
Drawings /Sketches if required :
-
Quality Matters
-
Add photos
-
Plant and equipment items
- Excavator
- Traffic control
- Tipper
- Backhoe
- Paver
- Roller Smooth Drum
- Water Truck
- Labour
- VMS
- Foreman
- Sweeper
- Profiler
- Skid Steer Loader
- Roller Pad Foot
- Grader
- Crane Truck
- Roller Multi Wheel
- Tally Handler
- Poontoon With EWP
- Elevated Work Platform
-
Other
-
Discussions with contractor
-
Click + to add other observations and photos
-
Please input other Observations
-
Add photos
-
Click + to add an incident / Non conformance / Non compliance / Potential Claims
Click + to add an incident / Non conformance / Non compliance / Potential Claims
-
Incidents (Safety, OH&S, Environmental, Community etc.)
-
Add media
-
Non-conformance
-
Add media
-
Non-compliance
-
Add media
-
Potential claims