Section 1 - General Information
-
Inspector Name(s):
- Andra Ahrens
- David Koltz
- Karl Hartman
- Lindsay France
- Elizabeth Hatton
- Jennifer Green
- Talena Walton
- Adam Butterfield
- Constance Modrow
-
Reason for inspection
- Pre-permit
- Scheduled
- Unscheduled
- Demand
- IU Problem
- POTW Emergency
- Compliance Follow-up
- Other
-
Permit #:
-
SIU Permit Signatory:
-
Present at Inspection?
-
Emergency Contact Phone:
-
Persons present during current inspection
-
Last inspected by:
- Andra Ahrens
- David Koltz
- Karl Hartman
- Lindsay France
- Elizabeth Hatton
- Jennifer Green
- Talena Walton
- Adam Butterfield
- Constance Modrow
-
Were any recommendations or deficiencies noted in previous inspection?
-
Recommendations/Deficiencies noted:
-
Corrective actions taken by IU:
-
Date of last inspection:
-
Date Facility went into operation?
-
Date of initial discharge to POTW:
-
Date of last application/BMR
-
Is this a new CIU (i.e. less than 6 months)?
-
Date of 90 day, if new CIU.
-
Plant Layout/Schematic on file at POTW?
-
Request Plant Layout / Schematic from Permittee.
-
When was the file received?
-
Schematic depicts each of the following items:
-
Location and fate of process discharges (sewer laterals, holding tanks, outfalls, leach fields)
-
All internal and external drains (floor drains, plumbing drains, overflow pipes)
-
Permit monitoring locations
-
All tanks and vessels (day tanks, liquid storage, dry chemicals, fuels, waste holding)
-
Secondary containment tanks, walls and other systems
-
Comments:
Section 2 - Product or Service Information
-
Brief description of manufacturing or service activity at this facility:
-
SIC Codes:
-
NAIC Codes:
-
Industrial Category:
-
CIU
-
SIU
-
IU
-
Applicable Standards:
-
Has production rate been affected since the last inspection?
-
How has production rate been affected?
-
Decrease in production.
-
By what percent?
-
Increase in production.
-
By what percent?
-
List products manufactured, indicating the appropriate production units. (Skip if not applicable):
Product
-
Product
-
Units
-
List type and amount of raw materials utilized, indicating the appropriate units:
Raw Material
-
Material
-
Units
-
Are there any by-products?
-
Please describe:
-
Comments:
Section 3 - Production Information
-
Total hours per day of operation
-
Employees / Schedule:
Shift
-
Number of full-time employees:
-
Number of part-time employees:
-
Hours of operation
-
Days of operation:
-
Monday - Friday
-
Monday - Saturday
-
Seven days per week
-
Other
-
Describe schedule.
-
Is production seasonal?
-
Indicate periods of maximum and minimum production.
-
Do scheduled shutdowns occur?
-
List time period(s):
-
Total days of production for the latest calendar year:
-
Are expansion plans scheduled within the next three (3) years?
-
Which changes are anticipated?
-
New products
-
Same products, additional capacity
-
New facility
-
Expansion of current facility
-
Relocation of facility
-
Relocating within SLC sewer district?
-
Proposed new facility address:
-
Comments:
Section 4 - Water Use Information
-
Water supply information:
-
Public Source
-
Enter SLCDPU Billing Account Number:
-
Surface Water
-
What is the source?
- Stream
- Creek
- River
- Canal
- Pond
-
What is the flow in GPD?
-
Well Water
-
What is the flow in GPD?
-
Other
-
Specify:
-
What is the flow in GPD?
-
List total average daily plant water use (Gallons):
-
Does usage vary widely during the production day?
-
List maximum periods:
-
Is a boiler in use at the facility?
-
What is the blowdown frequency and quantity?
-
Are corrosion or biological inhibiting chemicals added to facility water systems which are discharged to the sewer?
-
Are raw water treatment processes employed?
-
Water softener
-
Reverse Osmosis (RO)
-
Deionizing System (DI)
-
Other
-
Describe:
-
Is any residue/regenerant disposed to sewer (e.g., reverse osmosis reject)?
-
List type and quantity:
Section 5 - Wastewater Discharge Information
-
Is facility connected to the SLC sanitary sewer system?
-
Sewer Account and/or Service ID Number:
-
What type of system is utilized for wastewater discharge?
-
Does the facility have more than one sanitary sewer connection to the public sewer?
-
How many connections?
-
Is sanitary waste discharged separately to the POTW from process waste?
-
Does IU discharge industrial/process wastewater to the POTW?
-
List sources of industrial/process wastewater discharged to the POTW:
source
-
Source:
-
Volume currently discharged:
-
Batch or continuous?
- Batch
- Continuous
- Both
-
Treated prior to discharge?
-
Authorized in Permit?
-
Are any of the process discharges regulated by Federal Categorical Standards?
-
List processes and standards:
-
Does IU conduct process or equipment washes?
-
What days and times do washes normally occur?
-
Describe:
Section 5 (a) - Waste Streams
-
Are waste streams separated at the facility?
-
Is a piping diagram available on site?
Section 5 (b) - Pretreatment
-
Pretreatment System(s) in use?
-
Indicate system(s) used:
-
Dissolved Air floatation (DAF)
-
Chlorination
-
Flow Equalization
-
Grease, Oil, & Sand Interceptor
-
Ion Exchange
-
Flocculation / Precipitation
-
Air Stripping
-
Chemical Precipitation
-
Filtration
-
Grease/Oil Separation
-
Grit Removal
-
Reverse Osmosis
-
Centrifuge
-
Cyanide Destruction
-
Neutralization, pH Control
-
Screening
-
Solvent Separation
-
Sedimentation
-
Evaporation
-
Cyclone
-
Ozonation
-
Other
-
Describe:
-
Comments:
-
Describe the process flow. (Be specific):
-
Does the City have a copy of the Process Flow Diagram (PFD)?
-
Draw, or have the Permitee draw a basic sketch of the process flow.
-
Are air pollution control devices employed?
-
Describe location:
-
Is a wastewater stream generated?
-
Potential pollutants:
-
Discharge or disposal method:
Section 5 (c) - Pollutants
-
Is Permittee subject to any Best Management Practices (BMPs)?
-
Are BMP Requirements implemented appropriately?
-
Comments:
Section 6 - Stored Chemical & Waste Production
-
Are liquid chemicals used/stored in quantities of 55 gallons or more and/or dry chemicals in quantities of 500 pounds or more?
-
List each chemical and amount stored/used:
Chemical
-
Chemical name:
-
Amount currently stored:
-
Quantity used:
-
Time frame for quantity used:
-
Does the City have a copy of the chemical inventory?
-
Obtain a copy of the chemical inventory.
-
Comments:
Section 6 (a) - Spill Control
-
Does facility have a written Spill/Slug Discharge Control Plan?
-
Is the Plan Adequate?
-
List Plan deficiencies:
-
Is a copy of the Plan on file at POTW?<br>
-
When was the Plan submitted?
-
Are notification procedures posted in the plant?
-
Describe any spill control methods or facilities:
-
Are employees trained in spill response procedures?
-
Are employees properly trained to handle hazardous waste and other chemicals?
-
Name and title of person responsible for chemicals:
-
Is heavy equipment serviced or cleaned on your property (forklifts, cranes, trucks, etc.)?
-
What provisions are made for disposal of oil, steam cleaning wastes or other wastes?
-
Comments:
Section 6 (b) - Offsite Disposal
-
Are any solid wastes, sludges or other residues generated which require offsite disposal?
-
Provide information for each waste type (Type, Amount Generated, Waste Hauler)
Waste type
-
Waste:
-
Amount generated per month GPM:
-
Waste hauler:
-
Disposal location:
-
Hazardous waste?
-
Are all applicable waste manifests and/or shipping records available for review?
-
Comments:
Section 6 (c) - Management of Toxic Organics
-
Is the facility subject to 40 CFR 413 or 433?
-
Has a Toxic Organic Management Plan (TOMP) been submitted and reviewed by the POTW?
-
Is the TTO certification statement being submitted as required?
-
Is the TOMP being implemented and followed as described?
-
How is the TOMP being implemented?
-
Explain: Note deficiencies in TOMP implementation.
Section 7 - Self-Monitoring Sampling & Testing
Section 8 - Record Keeping
-
Does the Permit require any other reports, such as Zero Discharge Periodic Compliance Reports or TTO certification statements?
-
Have the reports been complete and on time?
-
Has the IU notified the POTW of all sampling (including any non-routine sampling) conducted at the permitted monitoring point?
-
Is the current wastewater discharge control permit on file?
-
Are on-site records maintained and available for review for at least a minimum of three (3) years?
-
Are all reports signed by an authorized representative?
-
Are spill and/or upset/bypass reports being submitted?
-
Comments:
Section 9 - Enforcement
-
Is the IU presently under an informal/formal enforcement action by Salt Lake City?
-
Describe status:
-
Is the IU under a compliance schedule?
-
Are compliance schedule progress reports being submitted?
-
Comments:
Section 10 - Walk Through
-
If visible, are pipes labeled or color coded?
-
Are system alarms or shut off valves in place?
Section 10 (a) - Interior Inspection
-
Chemicals/Raw Materials - Storage and Use
-
Deficiencies observed:
-
Add media
-
Describe chemical storage and containment:
-
Chemicals/Raw Materials - Labeling
-
Deficiencies observed:
-
Add media
-
Waste Storage - Containment
-
Deficiencies observed:
-
Add media
-
Describe waste storage and containment:
-
Waste Disposal
-
Deficiencies observed:
-
Add media
-
Floor Drains - Location
-
Deficiencies observed:
-
Add media
-
Describe floor drain location and pollution potential, where applicable:
-
Floor Drains - Protected from Pollutants
-
Deficiencies observed:
-
Add media
-
Mop Water - Proper Disposal
-
Deficiencies observed:
-
Add media
-
Spill Containment Equipment / Spill Kits
-
Deficiencies observed:
-
Add media
-
Describe spill containment equipment:
-
Maintenance shop, storage, garages, etc.
-
Deficiencies observed:
-
Add media
-
Pretreatment Equipment - Maintenance
-
Deficiencies observed:
-
Add media
-
Pretreatment Equipment - Operation
-
Deficiencies observed:
-
Add media
-
Pretreatment Equipment - Authorized
-
Deficiencies observed:
-
Add media
-
MSDS - Complete
-
Deficiencies observed:
-
Add media
-
MSDS - Available
-
Deficiencies observed:
-
Add media
-
Slug/Spill/Emergency Notification Procedures - Posted
-
Deficiencies observed:
-
Add media
-
Lab - Plumbing
-
Deficiencies observed:
-
Add media
-
How does Permittee dispose of lab waste?
-
Lab - Procedures
-
Deficiencies observed:
-
Add media
-
Incompatible chemicals - Properly Separated
-
Deficiencies observed:
-
Add media
-
Chemical Containment - Adequate
-
Deficiencies observed:
-
Add media
-
Flammable Cabinet
-
Deficiencies observed:
-
Add media
-
Additional Comments:
Section 10 (b) - Exterior Inspection
-
Perimeter of Building
-
Deficiencies observed:
-
Add media
-
Storm Drains
-
Deficiencies observed:
-
Add media
-
Location of all storm drains:
-
Outside Chemical Storage Areas - Containment
-
Deficiencies observed:
-
Add media
-
Outside Chemical Storage Areas - Covered
-
Deficiencies observed:
-
Add media
-
Grease removal devices
-
Deficiencies observed:
-
Add media
-
Comments:
Section 11 - Inspection Summary
-
Narrative: Describe the pretreatment system at this facility:
-
If needed, draw a sketch of the pretreatment system:
-
Pretreatment system sketch #2:
-
There is no evidence of chemical spill
-
Describe deficiency:
-
There is no evidence of unreported violations.
-
Describe deficiency:
-
Note any action items (facility or POTW) and summarize overall observations of the facility:
-
Information/handouts given to industry (titles: RCRA, Local Limits, etc):
-
Inspection result:
- No Deficiencies Observed
- Deficiencies Observed
- Non-Compliance
- Significant Non-Compliance
-
Summary of all deficiencies:
-
Follow-up date
-
Summary of actions to be taken:
-
Summary of actions to be taken:
-
Reclassification required?
-
Additional photo
-
Additional photo
-
Additional photo
-
Additional photo
-
Additional photo
Section 12 - Signature Block
-
Inspector Signature:
-
Permitee Signature (or authorized representative):
-
Copy of inspection report to be sent to IU?