Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Section 1 - General Information

  • Inspector Name(s):

  • Reason for inspection

  • Permit #:

  • SIU Permit Signatory:

  • Present at Inspection?

  • Emergency Contact Phone:

  • Date Facility went into operation?

  • Persons present during current inspection

  • Last inspected by:

  • Date of discharge to POTW:

  • Date of last application/BMR

  • Is this a new CIU (i.e. less than 6 months)?

  • Date of 90 day, if new CIU.

  • Plant Layout/Schematic on file at POTW?

  • Request Plant Layout / Schematic from Permittee.

  • When was the file received?

  • Schematic depicts each of the following items:

  • Location and fate of process discharges (sewer laterals, holding tanks, outfalls, leach fields)

  • All internal and external drains (floor drains, plumbing drains, overflow pipes)

  • Permit monitoring locations

  • All tanks and vessels (day tanks, liquid storage, dry chemicals, fuels, waste holding)

  • Secondary containment tanks, walls and other systems

  • Comments:

Section 2 - Product or Service Information

  • Brief description of manufacturing or service activity at this facility:

  • SIC Codes:

  • NAIC Codes:

  • Industrial Category:

  • Applicable Standards:

  • How has production rate been affected since the last inspection?

  • By what percent?

  • By what percent?

  • List products manufactured, indicating the appropriate production units. (Skip if not applicable):

  • Product
  • Product

  • Units

  • List type and amount of raw materials utilized, indicating the appropriate units:

  • Raw Material
  • Material

  • Units

  • Are there any by-products?

  • Please describe:

  • Comments:

Section 3 - Production Information

  • Total hours per day of operation

  • Employees / Schedule:

  • Shift
  • Number of full-time employees:

  • Number of part-time employees:

  • Hours of operation

  • Days of operation:

  • Is production seasonal?

  • Indicate periods of maximum and minimum production.

  • Do scheduled shutdowns occur?

  • List time period(s):

  • Total days of production for the latest calendar year:

  • Are expansion plans scheduled within the next three (3) years?

  • Which changes are anticipated?

  • Relocating within, or outside existing district?

  • Comments:

Section 4 - Water Use Information

  • Water supply information:

  • Enter SLCDPU Billing Account Number:

  • What is the source?

  • What is the flow in GPD?

  • What is the flow in GPD?

  • Specify:

  • What is the flow in GPD?

  • List average daily total plant water use (Gallons):

  • Does usage vary widely during the production day?

  • List maximum periods:

  • List sources and volumes of industrial wastewater discharged to the City sewer collection system:

  • Is a boiler in use at the facility?

  • What is the blowdown frequency and quantity?

  • Are corrosion or biological inhibiting chemicals added to facility water systems which are discharged to the sewer?

  • Are raw water treatment processes employed?

  • List process(es):

  • Is any residue/regenerant disposed to sewer (e.g., reverse osmosis reject)?

  • List type and quantity:

  • Are any of the process discharges regulated by Federal Categorical Standards?

  • List processes and standards:

Section 4 (a) - Waste Streams

  • Are waste streams separated at the facility?

  • Is a piping diagram available on site?

Section 5 - Pretreatment

  • Pretreatment System(s) in use?

  • Indicate system(s) used:

  • Dissolved Air floatation (DAF)

  • Chlorination

  • Flow Equalization

  • Grease, Oil, & Sand Interceptor

  • Ion Exchange

  • Flocculation / Precipitation

  • Air Stripping

  • Chemical Precipitation

  • Filtration

  • Grease/Oil Separation

  • Grit Removal

  • Reverse Osmosis

  • Centrifuge

  • Cyanide Destruction

  • Neutralization, pH Control

  • Screening

  • Solvent Separation

  • Sedimentation

  • Evaporation

  • Cyclone

  • Ozonation

  • Comments:

  • Describe the process flow. (Be specific):

  • Does the City have a copy of the Process Flow Diagram (PFD)?

  • Draw, or have the Permitee draw a basic sketch of the process flow.

  • Does the pretreatment system provide "continuous" or "batch" treatment?

  • How many batches are treated per week?

  • Average quantity per batch:

  • Is there a full-time wastewater treatment operator(s)?

  • Provide name, title, and training received:

  • Are all wastewater treatment units in service?

  • Is there a wastewater treatment operations & maintenance manual?

  • Is there a spare parts inventory of critical parts?

  • Are there any bypasses?

  • Are air pollution control devices employed?

  • Describe location:

  • Is a waste stream generated?

  • Potential pollutants:

  • Discharge or disposal method:

Section 5 (a) - Pollutants

  • Could pollutants potentially be contained in the wastewater?

  • Check all potential pollutants:

  • Acids and Acidic Waste

  • Alkali and Caustic Wastes

  • Pickling Wastes

  • Photographic Wastes

  • Latex Wastes

  • Paints and Pigments

  • Glues

  • Inks and Printing Wastes

  • Dyes, Coloring Agents

  • Waxes

  • Soaps, Surfactants, Detergents

  • Oils

  • Fats and Grease

  • Aldehydes, Ketones

  • Ethers

  • Organic Acids

  • Pesticides, Herbicides, Rodenticide

  • Phenol Containing Wastes

  • Benzene and Benzene Derivatives

  • Organic Solvents, Thinners

  • Halogenated Organic Compounds

  • Hot Wastes

  • Radioactive Wastes

  • Other

  • Specify:

  • Which of the above-noted pollutants come into direct contact with water that is discharged to the POTW?

  • Comments:

Section 6 - Stored Chemical & Waste Production

  • Are liquid chemicals used/stored in quantities of 55 gallons or more and/or dry chemicals in quantities of 500 pounds or more?

  • List each chemical and amount stored/used:

  • Chemical
  • Chemical name:

  • Amount currently stored:

  • Quantity used:

  • Time frame for quantity used:

  • Does the City have a copy of the chemical inventory?

  • Obtain a copy of the chemical inventory.

  • Comments:

Section 6 (a) - Spill Control

  • Does facility have a written Spill/Slug Discharge Control Plan?

  • Is the Plan Adequate?

  • List Plan deficiencies:

  • Is a copy of the Plan on file at POTW?<br>

  • When was the Plan submitted?

  • Are notification procedures posted in the plant?

  • Describe any spill control methods or facilities:

  • Are employes trained in spill response procedures?

  • Are employees properly trained to handle hazardous waste and other chemicals?

  • Name and title of person responsible for chemicals:

  • Is heavy equipment serviced or cleaned on your property (forklifts, cranes, trucks, etc.)?

  • What provisions are made for disposal of oil, steam cleaning wastes or other wastes?

  • Comments:

Section 6 (b) - Offsite Disposal

  • Are any solid wastes, sludges or other residues generated which require offsite disposal?

  • Provide information for each waste type (Type, Amount Generated, Waste Hauler)

  • Waste type
  • Waste:

  • Amount generated per month GPM:

  • Waste hauler:

  • Disposal location:

  • Hazardous waste?

  • Are all applicable waste manifests available for review?

  • Comments:

Section 7 - Record Keeping

  • Does the Permit require any other reports, such as Zero Discharge Periodic Compliance Reports or TTO certification statements?

  • Have the reports been complete and on time?

  • Has the IU notified the POTW of any non-routine sampling conducted at the permitted monitoring point?

  • Is the current wastewater discharge control permit on file?

  • Are on-site records maintained and available for review for at least a minimum of three (3) years?

  • Are all reports signed by an authorized representative?

  • Are spill and/or upset/bypass reports being submitted?

  • Comments:

Section 8 - Enforcement

  • Is the IU presently under an informal/formal enforcement action by Salt Lake City?

  • Describe status:

  • Is the IU under a compliance schedule?

  • Are compliance schedule progress reports being submitted?

  • Comments:

Section 9 - Walk Through

  • If visible, are pipes labeled or color coded?

  • Are system alarms or shut off valves in place?

Section 9 (a) - Exterior Inspection

  • Perimeter of Building

  • Deficiencies observed:

  • Add media

  • Storm Drains

  • Deficiencies observed:

  • Add media

  • Outside Chemical Storage Areas - Containment

  • Deficiencies observed:

  • Add media

  • Outside Chemical Storage Areas - Covered

  • Deficiencies observed:

  • Add media

  • Grease removal devices

  • Deficiencies observed:

  • Add media

  • Describe each grease removal device:

  • Device
  • Type

  • Number of chambers:

  • Size:

  • Location:

  • Date of most recent cleaning

  • By whom?

  • Cleaning frequency schedule:

  • Comments:

Section 9 (b) - Interior Inspection

  • Chemicals/Raw Materials - Storage and Use

  • Deficiencies observed:

  • Add media

  • Chemicals/Raw Materials - Labeling

  • Deficiencies observed:

  • Add media

  • Waste Storage - Containment

  • Deficiencies observed:

  • Add media

  • Waste Disposal

  • Deficiencies observed:

  • Add media

  • Floor Drains - Location

  • Deficiencies observed:

  • Add media

  • Floor Drains - Protected from Pollutants

  • Deficiencies observed:

  • Add media

  • Mop Water - Proper Disposal

  • Deficiencies observed:

  • Add media

  • Spill Containment Equipment / Spill Kits

  • Deficiencies observed:

  • Add media

  • Maintenance shop, storage, garages, etc.

  • Deficiencies observed:

  • Add media

  • Pretreatment Equipment - Maintenance

  • Deficiencies observed:

  • Add media

  • Pretreatment Equipment - Operation

  • Deficiencies observed:

  • Add media

  • Pretreatment Equipment - Authorized

  • Deficiencies observed:

  • Add media

  • MSDS - Complete

  • Deficiencies observed:

  • Add media

  • MSDS - Available

  • Deficiencies observed:

  • Add media

  • Slug/Spill/Emergency Notification Procedures - Posted

  • Deficiencies observed:

  • Add media

  • Lab - Plumbing

  • Deficiencies observed:

  • Add media

  • Lab - Procedures

  • Deficiencies observed:

  • Add media

  • pH meters/ORP Meters - Provided

  • Deficiencies observed:

  • Add media

  • pH meters/ORP Meters - Properly Calibrated / Complete Records

  • Deficiencies observed:

  • Add media

  • pH meters/ORP Meters - Operation & Maintenance

  • Deficiencies observed:

  • Add media

  • Incompatible chemicals - Properly Separated

  • Deficiencies observed:

  • Add media

  • Chemical Containment - Adequate

  • Deficiencies observed:

  • Add media

  • Flammable Cabinet

  • Deficiencies observed:

  • Add media

  • Sampling Points

  • Add media

  • Deficiencies observed:

  • Comments:

Section 10 - Visit Summary

  • Narrative: Describe the pretreatment system at this facility:

  • If needed, draw a sketch of the pretreatment system:

  • Pretreatment system sketch #2:

  • Pretreatment system sketch #3:

  • Wastewater is free from potential of prohibited pollutant discharges listed in 40 CFR 403.5(b)

  • Wastewater is free from potential of pollutant discharges not previously noted.

  • Wastewater effluent is not being diluted as a substitute for adequate treatment.

  • There is no evidence of spill, upset or bypass.

  • Note any action items (facility or POTW) and summarize overall observations of the facility:

  • Information/handouts given to industry (titles: RCRA, Local Limits, etc):

  • Inspection result:

  • Summary of all deficiencies:

  • Follow-up date

  • Summary of actions to be taken:

  • Summary of actions to be taken:

  • Reclassification required?

  • Additional photo

  • Additional photo

  • Additional photo

  • Additional photo

  • Additional photo

Section 11 - Signature Block

  • Inspector Signature:

  • Permitee Signature (or authorized representative):

  • Copy of inspection report to be sent to IU?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.