Information
-
Document number
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROJECT START UP
-
AISH manual on site
-
Pre-Task and Form book on site
-
Pre-start checklist completed
-
Required posters posted
-
Emergency action plan posted
-
Emergency Numbers posted
-
Occupational medical facility posted
-
Occupational medical maps posted
-
First aid kits
-
Eye wash stations
-
PPE available
-
Fire extinguisher
PLANNING
-
Construction schedule complete and posted
-
Short interval schedule complete and posted or communicated
-
Phased hazard analysis completed
-
Job safe analysis conducted
-
Pre-task plans filled out
-
Pre-task plans filled out prior to work starting
-
Pre-task plans covers all scopes of work being performed
-
Weekly progress meetings being conducted and or attended
-
Go No Go meeting conducted or attended
-
Internal kick off meeting conducted prior to work starting
-
Job started on time
-
Site map developed with lay down yard established
-
Plan to remove debris from site developed
-
Material handling planned and executed
-
Material stored off ground
-
Daily white board meeting (sub contractor)
-
Daily supervisor meeting (foreman)
-
Storm water plan developed
-
Fall protection plan developed
TRAINING
KEY SUPERVISOR
-
10 hour OSHA trained
-
First aid CPR
-
Pick director
-
Confined spaces
-
Fall protection
-
Pressure testing and flushing
-
Excavation competent person
-
Rigging and signal
-
Respiratory protection
CRAFT AND CREW
-
Aerial lift
-
Forklift
-
Fall protection
-
Excavation competent person
-
Respiratory protection
-
Rigging and Signal
-
Ladder use
-
Pressure testing and flushing
-
Pipe installation
-
Trained on specific tool
INSPECTIONS
-
Daily inspection of job site conducted
-
Weekly documented with crew member
-
Quarterly assessment by project manager
-
Daily equipment inspection
-
Initial equipment inspection completed and documented
-
Monthly equipment inspection completed and documented
-
Quarterly assured grounding completed
-
Fall protection equipment inspected and documented
-
Rigging equipment inspected
-
Daily excavation inspected and documented
-
Correct tool for the job
CULTURE
-
Project management or superintendent lead stretch and flex
-
Near misses recorded and investigated
-
First aid cases reported and investigated
-
Supervisory attending leadership meeting
-
Project management discussing safety with crew
-
Project management discussing safety at weekly meeting
-
Foremen conducting Pre-Task plans
-
Foreman conducting weekly safety meeting
-
Employee concerns documented and corrected
-
Apollo representative conducting audit