Information

  • Document number

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PROJECT START UP

  • AISH manual on site

  • Pre-Task and Form book on site

  • Pre-start checklist completed

  • Required posters posted

  • Emergency action plan posted

  • Emergency Numbers posted

  • Occupational medical facility posted

  • Occupational medical maps posted

  • First aid kits

  • Eye wash stations

  • PPE available

  • Fire extinguisher

PLANNING

  • Construction schedule complete and posted

  • Short interval schedule complete and posted or communicated

  • Phased hazard analysis completed

  • Job safe analysis conducted

  • Pre-task plans filled out

  • Pre-task plans filled out prior to work starting

  • Pre-task plans covers all scopes of work being performed

  • Weekly progress meetings being conducted and or attended

  • Go No Go meeting conducted or attended

  • Internal kick off meeting conducted prior to work starting

  • Job started on time

  • Site map developed with lay down yard established

  • Plan to remove debris from site developed

  • Material handling planned and executed

  • Material stored off ground

  • Daily white board meeting (sub contractor)

  • Daily supervisor meeting (foreman)

  • Storm water plan developed

  • Fall protection plan developed

TRAINING

KEY SUPERVISOR

  • 10 hour OSHA trained

  • First aid CPR

  • Pick director

  • Confined spaces

  • Fall protection

  • Pressure testing and flushing

  • Excavation competent person

  • Rigging and signal

  • Respiratory protection

CRAFT AND CREW

  • Aerial lift

  • Forklift

  • Fall protection

  • Excavation competent person

  • Respiratory protection

  • Rigging and Signal

  • Ladder use

  • Pressure testing and flushing

  • Pipe installation

  • Trained on specific tool

INSPECTIONS

  • Daily inspection of job site conducted

  • Weekly documented with crew member

  • Quarterly assessment by project manager

  • Daily equipment inspection

  • Initial equipment inspection completed and documented

  • Monthly equipment inspection completed and documented

  • Quarterly assured grounding completed

  • Fall protection equipment inspected and documented

  • Rigging equipment inspected

  • Daily excavation inspected and documented

  • Correct tool for the job

CULTURE

  • Project management or superintendent lead stretch and flex

  • Near misses recorded and investigated

  • First aid cases reported and investigated

  • Supervisory attending leadership meeting

  • Project management discussing safety with crew

  • Project management discussing safety at weekly meeting

  • Foremen conducting Pre-Task plans

  • Foreman conducting weekly safety meeting

  • Employee concerns documented and corrected

  • Apollo representative conducting audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.