PROJECT START UP

START UP ITEMS

  • Pre-start checklist completed

  • Pre-Task and Form book on site

  • Required posters posted

  • AISH manual on site

  • Emergency action plan posted

  • Occupational medical maps posted

  • Emergency Numbers posted

  • Occupational medical facility posted

  • First aid kits

  • PPE available

  • Eye wash stations

  • Fire extinguisher

PLANNING

Planning Tools

  • Plan to remove debris from site developed

  • Job started on time

  • Job safe analysis conducted

  • Short interval schedule complete and posted or communicated

  • Construction schedule complete and posted

  • Pre-task plans filled out prior to work starting

  • Fall protection plan developed

  • Daily white board meeting (sub contractor)

  • Material stored off ground

  • Material handling planned and executed

  • Site map developed with lay down yard established

  • Pre-task plans covers all scopes of work being performed

  • Pre-task plans filled out

  • Phased hazard analysis completed

  • Weekly progress meetings being conducted and or attended

  • Internal kick off meeting conducted prior to work starting

  • Go No Go meeting conducted or attended

  • Daily supervisor meeting (foreman)

  • Storm water plan developed

TRAINING

KEY SUPERVISOR

  • 10 hour OSHA trained

  • First aid CPR

  • Pick director

  • Confined spaces

  • Fall protection

  • Pressure testing and flushing

  • Excavation competent person

  • Rigging and signal

  • Respiratory protection

CRAFT AND CREW

  • Aerial lift

  • Forklift

  • Fall protection

  • Excavation competent person

  • Respiratory protection

  • Rigging and Signal

  • Ladder use

  • Pressure testing and flushing

  • Pipe installation

  • Trained on specific tool

INSPECTIONS

Inspection Process

  • Daily inspection of job site conducted

  • Fall protection equipment inspected and documented

  • Rigging equipment inspected

  • Daily equipment inspection

  • Weekly documented with crew member

  • Correct tool for the job

  • Daily excavation inspected and documented

  • Quarterly assured grounding completed

  • Monthly equipment inspection completed and documented

  • Initial equipment inspection completed and documented

  • Quarterly assessment by project manager

CULTURE

Culture

  • Project management or superintendent lead stretch and flex

  • First aid cases reported and investigated

  • Near misses recorded and investigated

  • Supervisory attending leadership meeting

  • Project management discussing safety at weekly meeting

  • Project management discussing safety with crew

  • Foremen conducting Pre-Task plans

  • Foreman conducting weekly safety meeting

  • Employee concerns documented and corrected

SIGNATURE BLOCK

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.