Title Page
-
Document No.
-
Audit site
-
Conducted on
-
Prepared by
-
Company
-
Personnel
Visual Inspections
-
Is the energy ICT meter powered and functioning (AC meter)
-
Is the AC distribution board labelled, in good condition and free from damage
-
Is there any array labelling and schematic diagram
-
Are all modules in good condition and free from damage
-
Are all module mounting systems including feet in good condition and free from damage
-
Is all cable management in good condition and free from damage
-
Is the cabling in good condition and free from damage
-
Are junction boxes and isolators in good condition and free from damage
-
Are the MC4 or Solar Lok (DC) connectors tightened and in good condition
-
Is the Lightning Protection System in good condition and free from damage
-
PV module type
-
Has the membrane been treated with algae cleaner
Inverter Readings
Inverter readings
-
Are the inverters operating correctly
Inverters
-
Production before cleaning
-
Production after cleaning
-
Inverter cooling fans cleaned
-
Comments
Array pictures
-
Before cleaning
-
After cleaning
Other pictures and issues
-
Description
-
Add media