Information
-
Document No.
-
Closing Checklist
-
Ark Manchester
-
Conducted on
-
Prepared by
-
Location
-
Personnel
BAR
-
Fridges re-stocked
-
Spirits married and empty spaces filled
-
Opened juices day-dotted
-
Left-over fruit covered, day-dotted and returned to fridge
-
Front bar cleaned with hot, soapy water and polished
-
Fridge doors cleaned and polished
-
Back bar wiped down
-
Tills wiped down
-
Speed-rails cleaned inside and out
-
Ice-wells emptied, drained and cleaned thoroughly
-
Re-stock bar caddies
-
Refill/replace cordials
-
Coffee machine cleaned and broken down
-
Bar floor swept and mopped
GLASS WASH
-
All glasses washed and replaced on bar
-
Drip trays and bar mats cleaned and returned to bar in the correct place
-
Glass wash drained, broken down and all parts cleaned thoroughly
-
Glass-wash surfaces and walls wiped down
-
Floor swept and mopped, including underneath all appliances
OUTSIDE AREAS
-
Ash-trays cleaned and left with outside furniture in Arch 2
-
Bins emptied and washed out
-
Outside furniture and A-boards brought into Arch 2
-
Barriers and Umbrellas brought inside
SERVERY
-
All tables wiped with hot water and sanitiser and polished
-
Menus wiped down
-
Tables relayed with condiment boxes, menus and flyers
-
Food area left clean and tidy
BACK OF HOUSE
-
Cellar clean and tidy; all empty boxes flattened and thrown away
-
Excess stock taken off bars and returned to cellar
-
Room 101 tidy