Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Has the engineer signed in?
-
Has Carillion Sub-contractor signed in?
-
Is there an emergency escalation procedure in place?
-
Have handover notes be filled in? (Main water, Gas and Electrical services needs to be listed)
-
Is there lease plans in the folders? (if yes please provide detail on the year of issue)
-
Are there site specific RAMS in the folder? (if no or N/A please confirm if their is a requirement for some)
-
Has the lock off tag off register been used? (if N/A state why)
-
Has the RCD test log sheet been filled in correctly?
-
Are there up to date PAT records in the folder? (please take picture)
-
Are the 5 yearly test certificates available in the folder?
-
Is the P7 PPM paperwork in the folder for 2016 (and 2017 if applicable)
-
Is there an up to date emergency lighting certificate in the folder?
-
Is the emergency lighting log book in place?
-
Has the emergency lighting log book been filled in correctly?
-
Have all the emergency lights been labelled and referenced correctly?
-
Have all the faults been recorded correctly and repaired by following visit?
-
Is there an up to date fire extinguisher list in the folder?
-
Has the fire extinguisher event register been filled out correctly?
-
Is there a fire extinguisher location map in the folder?
-
Is the last fire extinguisher PPM report in the folder and is it up to date?
-
Is the combustion log book in the folder and up to date
-
Are the PPM worksheets and annual gas certs in the folder and up to date?
-
Is the engineer storing ladders or access equipment onsite, if yes are they recorded in the site folder ladder register?
-
Has the AC paperwork be filled out correctly? (please take pictures)
-
Are the AC service records up to date? (remember the service visits should be carried out every three months)
-
Is the water treatment attendance sheet filled in correctly? (take picture)
-
Are the records being recorded correctly? (take pictures)
-
If the engineer using the fault log when required? (take pictures)
-
Is the engineer identifying faults and carrying out remedial works by the next scheduled PPM visit? (if no please comment why)
-
Is the register for the auto doors, barriers and gates filled incorrectly and up to date? (if no take this as an action)
-
Is PPM report for Shutters in the folder?
-
Is drainage report in the folder and up to date?
-
Is vegetation PPM report in the folder and up to date?
-
Is the site specific asset list in place in the folder and up to date?
-
Are there drawings in the folder for the drainage systems for the station?
-
Are there drawing for the electrical DB's locations in the folder?
-
Is there an up to date asbestos register in the folder?