Inspector completes observations of the physical condition listed. For each physical condition that is inadequate or requires a corrective action a note should be made.
Required Postings
-
OSHA Poster - Posted and visible
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
State specific WC poster - Posted and visible
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
PepsiCo Occ. Health and Safety Policy - Posted, visible, and signed by senior management
-
-
Corrective Action
-
Responsible
-
Planned completion date
Fire Suppression System
-
Fire Extinguisher NOT blocked - 36 inch clearance
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Fire Extinguisher tagged and inspected monthly
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Fire equipment marked with signage/red paint
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Fire rinsers unobstructed
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Plastic and wood pallets stored properly
-
-
Corrective Action
-
Responsible
-
Planned completion date
Emergency Preparedness
-
Emergency maps posted
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All shut off valves are clearly marked on equipment
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Windsock - Present, visible, and in good condition
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Exit doors marked and NOT block - 36" pathway
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Emergency lighting operational and positioned to eliminate walkway to exit
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Aisles/pathways marked and NOT blocked
-
-
Corrective Action
-
Responsible
-
Planned completion date
Hazard Communication
-
All chemicals (Original and secondary containers) are labeled including: Name, hazard warning, name and address of manufacturer
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
3E poster (MSDS Vendor) posted, phone stickers in place
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Spill containment in place and adequate
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All labels removed from EMPTY concentrate drums
-
-
Corrective Action
-
Responsible
-
Planned completion date
Compressed Gas
-
Incompatible materials separated by 20' (Caustics from acids, flammables from oxidizers, Acetylene from Oxygen tanks)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All tanks are secured from falling by chains or strap
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All tanks are free from dents and corrosion
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All tanks are stored in designated areas
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All protective caps are in place
-
-
Corrective Action
-
Responsible
-
Planned completion date
Hot Works
-
Proper equipment available for hot works (i.e.: curtains, fire extinguishers and PPE)
-
-
Corrective Action
-
Responsible
-
Planned completion date
Flammable Cabinets
-
All flammables are stored in fire rated cabinets
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Cabinet is grounded and doors close automatically
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Vents are closed it cabinet is not vented outside facility
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
No paper, cardboard, or combustible items are located within or on top of cabinet
-
-
Corrective Action
-
Responsible
-
Planned completion date
Eyewash/Shower Stations
-
Present near chemical sites (i.e.: Battery recharging, fleet, chemical storage)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Must be plumbed (No temporary construction stations)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Located within 10 seconds of unimpeded travel distance from the hazard (Approximately 55 feet)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
NOT blocked - 30 inch clearance
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Condition checked monthly and inspection tag signed (Water flow, cleanliness, caps in place, etc.)
-
-
Corrective Action
-
Responsible
-
Planned completion date
Confined Space
-
Confined spaces are identified and labeled properly
-
-
Corrective Action
-
Responsible
-
Planned completion date
Lockout/Tagout
-
Lockout procedures exist for all equipment observed
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All equipment currently being worked on is locked out and all authorized employees have their own red locks
-
-
Corrective Action
-
Responsible
-
Planned completion date
Electrical and Arc Flash
-
Electrical panels and main shutoffs are labeled (Panel name, sticker and voltage)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
NOT blocked - 36 inch clearance around all panels
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
No exposed, empty, uncovered or broken panels (Knockouts and breakers)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All cords are free from slices or frays – no exposed wires
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Cords not pulling away from plug end, including power tools
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All grounding prongs are present
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Extension cords/surge protectors not linked together (Daisy-chained)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Arc flash stickers are present (Electrical panels, motor control centers and equipment control panels)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Proper PPE exist for performing Arc flash work
-
-
Corrective Action
-
Responsible
-
Planned completion date
Ladder Safety
-
Ladders are in good repair, feet in place, all TYPE 1 (No wood, weight capacity must be listed)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Ladders are not used as permanent stairs
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Ladders are secured when used
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Ladders are stored safely when not in use (Ladder rack or chain system)
-
-
Corrective Action
-
Responsible
-
Planned completion date
Aerial Lifts (Scissor Lift and Boom Lift)
-
Pre-use/shift inspections are performed on lifts
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Pre-use inspections are performed on fall protection equipment
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Personal fall arrest system (Full harness and SRL/lanyard) is worn when working on aerial lift equipment
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Lanyard is attached to approved anchorage point within lift
-
-
Corrective Action
-
Responsible
-
Planned completion date
Sugar Tanker (Carbis) Platform
-
Carbis platform is present (Contact HQ safety if platform is needed)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Platform is used when sugar is delivered
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Platform is maintained in good condition, free of debris
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Gaps are not present between cage and tanker or platform bridge and platform
-
-
Corrective Action
-
Responsible
-
Planned completion date
Rack Safety
-
Racks are not dented, twisted or damaged, no deflection or sagging in the beam
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Racks are bolted to the floor and to other racks/walls to provide support with at least one bolt per leg or to manufacturers specifications
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All pallets on upper racks are stretch wrapped
-
-
Corrective Action
-
Responsible
-
Planned completion date
Mezzanine
-
Mezzanines have posted load limit signs (Load rating without an engineering review is 100 pounds per square foot)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Mezzanines on top of 2 x 4 joist are not used for storage or pedestrian traffic
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
4 inch toeboards are present
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Mid rails and top rails are present for mezzanines above 4 feet
-
-
Corrective Action
-
Responsible
-
Planned completion date
PPE
-
Proper PPE available where needed (Gloves, safety glasses, goggles, hearing protection)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Are employees using proper PPE
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
PPE is maintained in good/clean condition
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Signage posted where PPE is required
-
-
Corrective Action
-
Responsible
-
Planned completion date
Machine Guarding
-
Fixed guards are secured in position and well maintained
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Pinch and nip points, shafts and pulleys are guard
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Pinch points on conveyor belts are guarded to prevent access
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Emergency stop buttons clearly labeled and situated close to operators
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Mechanical power transmission is guarded
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Interlock guards are in place and operating properly
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Shafts must be smooth and do not protrude more than 1/2 their diameter unless guarded capped
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Unguarded shafts do not have keyways, bolts, screws or fasteners protruding on them
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Shaft openings are guarded so chains/belts are not exposed
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Internal rotating shafts are guarded to prevent snagging items
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All accordion lift tables have skirts around the scissor
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Underside of conveyors are covered where in reach of persons
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Proper signage is present for low clearance
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Caution tape is not used as a means of guarding
-
-
Corrective Action
-
Responsible
-
Planned completion date
Machine Guarding - Portable Tools
-
Air nozzles are limited to 30 PSI or below
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All fan guards are fastened with no gaps
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All grinders are adjusted properly with guards in place (tool rest 1/8" from wheel, tongue guard adjusted to 1/4")
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All grinders are securely mounted to table
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Proper PPE is available for grinders (i.e: face shield or safety goggles)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All drill presses are clean and guards and shields present
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Proper PPE is available for lathes and Mills (i.e.: Face shields or safety goggles)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All lathes and mills are guarded and in good condition
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Pedestal equipment like grinders, bandsaws, lathes and mills bolted to the floor
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Tablesaws are guarded and in good condition
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Blades are properly secured
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
All machine labels are in place
-
-
Corrective Action
-
Responsible
-
Planned completion date
Hoists, Cranes, and Slings
-
Maximum load limits are posted on all hoists
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Hoist, cranes and slings are inspected annually (Inspection form located in the safety library under regulatory)
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Equipment is in good condition (All chains, steel cables, straps, etc. are free of cracks, kinks or breaks and all clasps and springs must be intact and fully functioning)
-
-
Corrective Action
-
Responsible
-
Planned completion date
Dock Safety
-
Dock locks are present for all docks and are in good condition (Functioning, lights working) with procedures posted
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Wheel chocks are present and in good repair in the absence of dock locks with procedures posted
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Overhead doors are shut or openings are chained off when trailer is out
-
-
Corrective Action
-
Responsible
-
Planned completion date
Powered Industrial Truck Safety
-
Forklifts and pallet jacks are operated by qualified employees who have their license on their person
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Preshift inspections are being performed
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Static straps/chains are in place and locator pins are in place on propane forklift
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Drivers do not operate the forklift while walking next to them
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Drivers are traveling at or below a brisk walk
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Drivers are sounding the horn when pedestrians are present
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Drivers slow down and sound horns at intersections and when changing direction
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Drivers look in direction of travel and travel in reverse with an obstructing load
-
-
Corrective Action
-
Responsible
-
Planned completion date
-
Auditor Signature