Title Page
-
Site Location
-
Plot Number
undefined
-
PPE being worn by Operatives
-
Harness Inspections upto date
General Details
-
Inspection Completed By
-
Name
-
Client
-
undefined
-
Site Name
-
Date Of Inspection
-
Site Manager
Scaffold Inspection
-
Inspection Type
- First Use
- Following 7 days of use
- Following adverse weather conditions
- Following any alterations
-
Scaffold Erected By
-
Location Of Inspected Scaffold
- Full
- Front
- Rear
- Gable
- Gable Lift
- Left Side
- Right Side
- Front Roof Access
- Rear Roof Access
- Ground Level Lift
- Other
-
Scaffolder Name
-
Are The Footings Suitable ? Firm and Stoned ?
-
Notes
-
Image
-
Are The Standards Upright ?
-
Notes
-
Image
-
Are The Ledgers Suitable ?
-
Notes
-
Image
-
Why are the ledgers unsuitable ?
-
Is The Bracing Suitable ?
-
Notes
-
Image
-
Are The Transoms Suitable ?
-
Notes
-
Image
-
Are The Rakers Suitable and Attached at Node Points?
-
Notes
-
Image
-
Are The Ties Suitable ?
-
Notes
-
Image
-
Are The Boards/Planks Suitable ? Clipped where needed ? No Damage ?
-
Notes
-
Image
Summary Of Inspection
-
General Notes And Summary Of Findings
-
Are There Any Recommendations Identified ?
-
Recommendations
-
Image
-
Is The Scaff Tag Present and Signed ?
-
Notes
-
Image
Inspection Sign Off
-
Add signature