Information
-
Report Reference Number:
-
Site Inspected:
-
Site Supervisor:
-
Project Manager:
-
Conducted on
-
Advisor:
Information
-
Ashford Brickwork is a subcontractor working under the Principal Contractor. Therefore, any issues identified during the inspection that fall under the control of the Principal Contractor should be duly noted and communicated alongside this inspection report.
-
Scoring.
N/A = This item was not applicable at the time of the inspection, or it was not one of the items inspected.
S = Satisfactory. This category was being managed / controlled in accordance with minimum requirements or better.
A = Advisory. Recommended measures necessary to achieve industry best practice.
IAR = Immediate action required to reduce the risk of harm and/or enforcement action.
General Site Description & Activities Observed
-
undefined
Accidents, Dangerous Occurrences or Near Misses since last visit.
-
Provide details.
0 Previous Inspections.
-
Have matters identified during previous inspection been satisfactorily addressed.
-
Recommended Actions.
1 Access/egress.
-
Adequate - maintained in good order etc.
-
Recommended Action.
2 Emergency Systems
-
Fire Points
-
Recommended Action.
-
Fire plan - alarms - signage - extinguishers - exit routes - muster point - flammables etc.
First Aid Kits
Eye wash stations
Information & Signage
3 Personal Protective Equipment.
-
Fit for purpose - face fit tested etc.
-
Recommended Action.
4 Working at Height
-
Designed - handed over - erected in accordance with recognised standards - statutory inspections carried out etc.
-
Recommended Action.
Scaffolding
-
Edge protection in place
-
Ladder Secure
-
Scaffold clean and no trip hazards
5 Plant & Equipment
-
Fit for purpose etc.
-
Recommended Action.
6 Environmental.
-
Waste management - noise - dust - mud etc.
-
Recommended Action.
7 Manual Handling
-
Adequate - maintained etc.
-
Recommended Action.
8 Site Good Order
-
Housekeeping - slips/trips/falls - lighting etc.
-
Recommended Action.
9 Welfare
-
Sufficient facilities - adequately equipped - suitably maintained.
-
Recommended Action.
-
Provision for Food / Water
-
Hot/Cold water
-
Means of heating food
-
Chairs with backs
-
Drying room
10 Competency
-
Site inductions - tool box talks - training etc.
-
Recommended Action.
11 Safe Systems of Work
-
Method Statements - COSHH - Risk Assessments - Permits etc.
-
Recommended Action.
12 Site supervisor
-
Arrangements, evidence.
-
Recommended Action.
-
Overall Comments:
-
Site Manager Action / Comments:
-
Advisor
-
Company Representative
-
Actions taken to address shortfalls.
-
Closed Out by and date