Title Page

  • Conducted on

  • Prepared by

  • Location

Heat Pump Wiring

  • Is the correct size breaker used for heat pump?

  • Is an isolation switch installed for the heat pump and mounted on a fixed structure out beside the heat pump?

  • Is the correct size power supply cable used for heat pump?

  • Is the correct communication cable installed and wired unto correct terminals?

Cylinder Wiring

  • Is the correct sized breaker used for controller on cylinder?

  • Is an isolation switch installed for controller and mounted on a fixed structure beside controller?

  • Is the correct size power supply cable used for controller on cylinder?

  • Is the correct communication cable installed and wired into correct terminals?

  • Is the flow switch switch wired back into correct terminal on control panel?

Heating Controls / Stats Wiring

  • Are all heating controls powered from controller on cylinder?

  • Are all heating controls wired & working?

Heat Pump Mounting

  • Is the unit installed the correct distance from nearest boundaries?

  • Is the unit secured correctly to antivibration mounts via rubber mounts?

  • Is the unit mounted plumb level?

  • drain caps fitted

  • Is a condensate drain kit fitted and terminating correctly

  • If the unit is mounted on wall brackets; is a drip tray installed?

Heat Pump Plumbing (Outdoor)

  • Is the correct size pipework used?

  • Are flexible antivibration hoses fitted and washers used?

  • Are heat pump isolation valves fitted out at the heat pump?

  • Is the flow and return pipework connected correctly?

  • Is the primary flow pipework insulated?

  • Are all safety valves and tundish drained through a metal pipe to an appropriate drain point?

Cylinder Plumbing (Indoor)

  • Is flow and return pipework connected the right way around?

  • is time/date set correctly

  • Is the heating expansion vessel correctly sized, secured and charged to to the correct pressure?

  • Are all pump valves and isolation valves fully open?

  • has an anti vac valve been fitted

  • Has system been completely flushed of air and charged to the correct operating pressure

Radiator / UFH Plumbing

  • Has all air been removed from emitters?

  • Have all emitters been balanced correctly?

Additional ASHP Checklist

  • Anti-freeze valves fitted or glycol installed in the system?

  • All pipework in cylinder cupboard insulated?

  • Isolation valve fitted on cold inlet?

  • Inlet control group valve fitted in incoming cold within 3m of cylinder?

  • D1 size (max 600mm away from temperature relief valve)?

  • D2 pipework minimum 300mm before the 1st bend and correct size

  • Potable expansion vessel fitted on cold feed between inlet valve and cylinder?

  • Expansion vessel on heating

  • Hot water outlet starts in 22mm pipe - can be reduced?

  • installer details filled in on cylinder

Installation Photographs / Commissioning Documentation

  • Add media

Sign Off

  • Add signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.