Title Page

  • Type of system

  • Client

  • Prepared by

  • Conducted on

  • Customer address:
  • Customer contact details:
  • How many occupants live at the address

  • Age of the property

  • Type of property

  • Detached

  • Semi detached

  • How many bedrooms , bathrooms including ensuite's ?

  • Property construction exterior

  • Brick

  • Solid brick

  • Stone

  • Solid stone

  • Block

  • System built

  • Cavities

  • Insulated

  • No insulation

  • As built

  • Property construction interior

  • Studded

  • Block

  • Solid

  • Insulated

  • No insulation

  • Roof type

  • Loft insulation

  • None

  • 100mm

  • 150mm

  • 200mm

  • 300mm

  • 400mm

  • Loft space

  • Fully boarded out

  • Part boarded out

  • Not boarded out

  • Does the loft space have lighting

  • Loft hatch size , if required

  • Ground floor

  • Insulated

  • No insulation

  • First floor / ceiling

  • Insulation

  • No insulation

  • Glazing and doors

  • How old is the glazing

  • Upvc

  • Timber

  • Argon filled

  • Do you have WiFi

  • Does the property have mains water

  • Does the property have a water meter

  • Does the property have a gas cooker / hob

  • Does the property have a gas fire

  • Does the property have solar PV

  • Does the property have solar tubes or magic box

  • Is the property exposed

  • Existing fuel supply

  • Type of installation?

  • Details of old boiler , cylinder , pipe run etc

  • Please take pictures of existing boiler cylinder and pipe run

  • One pipe system

  • Two pipe system

  • Pipe work size to radiators .

  • 8mm

  • 10mm

  • 12mm

  • 15mm

  • Type of pipework

  • Plastic

  • Copper

  • Does the property have a shower ?

  • Electrical

  • How many

  • Mixer off the system

  • How many

  • Existing size and type of the hot water cylinder

  • Circulation pumps

  • 3 way diverter valves

  • Cylinder stats

  • Airing cupboard size if required

  • Details of the consumer unit

  • Please take pictures of the fuse board

  • Single phase

  • 3 phase

  • Location of ASHP

  • In which direction will the unit face

  • Is a buffer tank required

  • Picture of the ASHP location

  • Q = 2

  • Q = 4

  • Q = 8

  • Wall bracket

  • Ground

  • Siting of ASHP , does it comply with minimum clearances , has customer been advised of location , pipe run etc

  • Is the ASHP clear of the existing flue

  • Where will the waste water go to

  • Add media

  • 22mm / 32mm plastic pipe for drainage required 3m lengths

  • 22mm / 32mm elbows required

  • 22mm / 32mm tee required

  • 22/32mm 45’s required

  • Round guttering connector required

  • Square guttering connector required

  • Waste stack saddle required

  • Soakaway required

  • How many lengths of insulation / trunking required in 2m lengths ?

  • Select from range

  • No of external bends

  • No of internal bends

  • No off 90 degree bends

  • Colour of insulation / trunking

  • 22mm copper pipe required for heating run Total meters ?

  • 22mm pipe clips required?

  • 15mm copper pipe required total meters ?

  • 15mm pipe clips required?

  • Is scaffolding required?

  • Please list sizes of any radiators that need to be replaced and which rooms they are situated in?

  • Add any additional information you find necessary ,

  • Sound calculations

  • Nearest neighbours habitable room with a window

  • Position of the unit

  • Porch radiator

  • Hall radiator

  • Passage radiator

  • Living room radiator

  • Lounge radiator

  • Dining room radiator

  • Kitchen radiator

  • Utility room

  • Study radiator

  • Office radiator

  • Wc radiator

  • Conservatory

  • Summer room radiator

  • Store room radiator

  • Garage radiator

  • Stairs radiator

  • Bedroom 1 radiator

  • Ensuite radiator

  • Bedroom 2 radiator

  • Ensuite radiator

  • Bedroom 3 radiator

  • Ensuite radiator

  • Bedroom 4 radiator

  • Ensuite radiator

  • Bedroom 5 radiator

  • Ensuite radiator

  • Bathroom radiator

  • Shower room radiator

  • Front elevation

  • Side 1 elevation

  • Side 2 elevation

  • Rear elevation

  • Floor plan and / or rad schedule

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.