Title Page
-
Conducted on
-
Prepared by
-
Location
-
Area (Include Drawing Reference)
-
Site conducted
Untitled Page
-
Pre start - Any items of note during the strip of existing cladding?
Siniat Board Installation
-
Siniat Board installed as per drawings
EPDM Application
-
EPDM applied as per specifiaction
Top Hat Installation
-
Top Hats installed as per drawings
Bracket and Rail Matrix System Installation
-
Bracket and rail system installed as per drawings
Fire Barrier Installation
-
Vertical Fire Barrier installed as per manufacturer guidelines
-
Horizontal Fire Barrier installed as per manufacturers guidelines
Insulation Installation
-
Insulation installed as per drawings
Swisspearl Installation
-
Swisspearl panels installed as per drawings and manufacturers guidelines followed
Window Flashing and Head Cill Installation
-
All flashings installed as per drawings
Sign Off Confirmations
-
SCF Site Manager
-
Client - Aspect 3 Apartments Ltd
-
Building Clerk of Works - Hickton Quality Control
-
Fire Engineer - Fire Prevent Ltd
-
Checking Architect - BEFS Ltd
-
Building Control - Sheffield City Council