Title Page

  • Conducted on

  • Prepared by

  • Location
  • Area (Include Drawing Reference)

  • Site conducted

Untitled Page

  • Pre start - Any items of note during the strip of existing cladding?

Siniat Board Installation

  • Siniat Board installed as per drawings

EPDM Application

  • EPDM applied as per specifiaction

Top Hat Installation

  • Top Hats installed as per drawings

Bracket and Rail Matrix System Installation

  • Bracket and rail system installed as per drawings

Fire Barrier Installation

  • Vertical Fire Barrier installed as per manufacturer guidelines

  • Horizontal Fire Barrier installed as per manufacturers guidelines

Insulation Installation

  • Insulation installed as per drawings

Swisspearl Installation

  • Swisspearl panels installed as per drawings and manufacturers guidelines followed

Window Flashing and Head Cill Installation

  • All flashings installed as per drawings

Sign Off Confirmations

  • SCF Site Manager

  • Client - Aspect 3 Apartments Ltd

  • Building Clerk of Works - Hickton Quality Control

  • Fire Engineer - Fire Prevent Ltd

  • Checking Architect - BEFS Ltd

  • Building Control - Sheffield City Council

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.