Title Page

  • Contract Number

  • Customer Surname

  • Location
  • Please take a photo of the front of the house

  • Conducted on

  • Prepared by

  • Does the proposed works include construction of a roof?

  • Is the proposed roof a carport?

  • Is the proposed carport new or existing?

  • Is the proposed carport located in a heritage conservation area or a draft heritage conservation area?

  • Is the proposed carport located in the rear yard of the property?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (m) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located in the rear yard.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (m) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located in the rear yard.

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located in a heritage conservation or draft heritage conservation area among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located within a heritage conservation area or draft heritage conservation area, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Will the carport have 2 or more sides open?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (f) have 2 or more sides open and not less than one-third of it's perimeter open.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the carport have at least one third of its perimeter open?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (f) have 2 or more sides open and not less than one-third of it's perimeter open.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the proposed carport be located at least 1.0 meter behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (d) be located at least 1m behind the building line of any road frontage.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the overall height of the proposed carport above existing ground level.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (c) be no higher than 3m above ground level (existing) or, if attached to an existing single storey dwelling, be no higher than the roof gutter line.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed carport attached to an existing dwelling?

  • Does the roof of the proposed carport extend above the gutter line of the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (c) be no higher than 3m above ground level (existing) or, if attached to an existing single storey dwelling, be no higher than the roof gutter line.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed carport being constructed on bushfire-prone land?

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located on bush fire prone land among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located on bush fire prone land, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Is the proposed carport closer than 5.0m to the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (l) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non combustible material.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (l) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.
    Please note that a BAL assessment will be required to determine the material requirements for construction of your carport unless all materials are non-combustible.
    The cost of the BAL assessment is not included in your contract price and is to be organised and paid directly by you to the relevant professional or company.
    Your project will not be able to proceed past the design stage without this information.

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located on bush fire prone land among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located on bush fire prone land, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Please nominate the size of the lot the proposed carport is being constructed.

  • Please nominate the overall size of the proposed carport.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (b) not have a floor area more than:
    (i) for a lot larger than 300sqm in a rural zone or Zone R5 – 50sqm
    (ii) for a lot larger than 300sqm in a zone other than a rural zone or Zone R5 – 25sqm
    (iii) for a lot 300sqm or less in any zone – 20sqm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the zoning of the land the proposed carport is to be constructed.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed carport is being constructed.

  • Please nominate the distance from the proposed carport structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the roof of the proposed carport to the nearest boundary.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the distance from the proposed carport structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the zoning of the land the proposed carport is to be constructed.

  • Please nominate the overall size of the proposed carport.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (b) not have a floor area more than:
    (i) for a lot larger than 300sqm in a rural zone or Zone R5 – 50sqm
    (ii) for a lot larger than 300sqm in a zone other than a rural zone or Zone R5 – 25sqm
    (iii) for a lot 300sqm or less in any zone – 20sqm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed carport structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the overall size of the proposed carport.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (b) not have a floor area more than:
    (i) for a lot larger than 300sqm in a rural zone or Zone R5 – 50sqm
    (ii) for a lot larger than 300sqm in a zone other than a rural zone or Zone R5 – 25sqm
    (iii) for a lot 300sqm or less in any zone – 20sqm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed carport structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the roof of the proposed carport to the nearest boundary.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed carport is being constructed.

  • Is the existing carport being replaced or added onto?

  • Will the carport be changed in design, change in size or be re positioned?

  • Please assess as a newly constructed carport.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Is the proposed addition to the carport located in a heritage conservation area or a draft heritage conservation area?

  • Is the proposed addition to the carport located in the rear yard?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (m) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located in the rear yard.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (m) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located in the rear yard.

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located in a heritage conservation or draft heritage conservation area among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located within a heritage conservation area or draft heritage conservation area, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Considering the area as a whole, will carport have 2 or more sides open?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (f) have 2 or more sides open and not less than one-third of it's perimeter open.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Considering the area as a whole, will carport have at least one third of its perimeter open?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (f) have 2 or more sides open and not less than one-third of it's perimeter open.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the addition to the proposed carport be located at least 1.0 meter behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (d) be located at least 1m behind the building line of any road frontage.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the overall height of the proposed addition to the carport above existing ground level.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (c) be no higher than 3m above ground level (existing) or, if attached to an existing single storey dwelling, be no higher than the roof gutter line.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the existing carport attached to an existing dwelling or will the addition cause any part of the carport to be attached to an existing dwelling?

  • Will the proposed addition extend above the gutter line of the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (c) be no higher than 3m above ground level (existing) or, if attached to an existing single storey dwelling, be no higher than the roof gutter line.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed carport being constructed on bushfire-prone land?

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located on bush fire prone land among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located on bush fire prone land, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Will the addition to the carport be closer than 5.0m to the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (l) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non combustible material.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (l) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.
    Please note that a BAL assessment will be required to determine the material requirements for construction of your carport unless all materials are non-combustible.
    The cost of the BAL assessment is not included in your contract price and is to be organised and paid directly by you to the relevant professional or company.
    Your project will not be able to proceed past the design stage without this information.

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located on bush fire prone land among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located on bush fire prone land, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Please nominate the size of the lot on which the proposed addition to the carport is being constructed.

  • Considering the area as a whole, please nominate the total area of the carport including the proposed addition.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (b) not have a floor area more than:
    (i) for a lot larger than 300sqm in a rural zone or Zone R5 – 50sqm
    (ii) for a lot larger than 300sqm in a zone other than a rural zone or Zone R5 – 25sqm
    (iii) for a lot 300sqm or less in any zone – 20sqm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the zoning of the land the proposed addition to the carport is to be constructed.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed carport is being constructed.

  • Please nominate the distance from the structural posts and beams of the addition to the carport to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the roof of the addition to the nearest boundary.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the distance from the structural posts and beams of the addition to the carport to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the zoning of the land the proposed addition to the carport is to be constructed.

  • Considering the area as a whole, please nominate the total area of the carport including the proposed addition.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (b) not have a floor area more than:
    (i) for a lot larger than 300sqm in a rural zone or Zone R5 – 50sqm
    (ii) for a lot larger than 300sqm in a zone other than a rural zone or Zone R5 – 25sqm
    (iii) for a lot 300sqm or less in any zone – 20sqm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the structural posts and beams of the addition to the carport to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Considering the area as a whole, please nominate the total area of the carport including the proposed addition.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (b) not have a floor area more than:
    (i) for a lot larger than 300sqm in a rural zone or Zone R5 – 50sqm
    (ii) for a lot larger than 300sqm in a zone other than a rural zone or Zone R5 – 25sqm
    (iii) for a lot 300sqm or less in any zone – 20sqm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the structural posts and beams of the addition to the carport to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (e) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 – 5m
    (ii) for development carried out in any other zone – 900mm

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the roof of the addition to the nearest boundary.

  • Unfortunately your carport does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to what is noted above in the original assessment may affect the ability to construct as exempt development and may require another form of approval.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Is the roofed area new or existing?

  • Is the proposed roof located in a heritage conservation area or a draft heritage conservation area?

  • Is the proposed roof located behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (o) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located behind the building line of any road frontage

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (o) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located behind the building line of any road frontage

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located in a heritage conservation or draft heritage conservation area.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located within a heritage conservation area or draft heritage conservation area, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract.
    Should your project require certification as a result, all costs associated with obtaining reports and certification costs are not included in your contract price.

  • Will the proposed roof have a floor height underneath of over 1m above existing ground level?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (i) have a floor height not more than 1m above ground level (existing)

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the roofed area have an enclosing wall or screen higher than 1.4m?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (d) not have an enclosing wall higher than 1.4m

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the proposed roof be located behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (e) be located behind the building line of any road frontage

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the overall height of the proposed roof above existing ground level.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (j1) be no higher than 3m at its highest point above ground level (existing).

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed roof attached to an existing dwelling?

  • Does the roof of the proposed roof extend above the gutter line of the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (j) if it is a roofed structure attached to a dwelling - not extend above the roof gutter line of the dwelling.

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed roof being constructed on bushfire-prone land?

  • Is the proposed roof closer than 5.0m to the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (n) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (n) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.

    A BAL assessment will be required to determine the material requirements for construction of your carport unless all materials are non-combustible.
    The cost of the BAL assessment is not included in your contract price and is to be organised and paid directly by you to the relevant professional or company.
    Your project will not be able to proceed past the design stage without this information.

  • Please nominate the size of the lot the proposed roof is being constructed.

  • Please nominate the overall size of the proposed roof.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (c) not cause the total floor area of all such structures on the lot to be more than:
    (i) for a lot larger than 300sqm - 15% of the ground floor area of the dwelling on the lot; or
    (ii) for a lot 300sqm or less - 25sqm

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the zoning of the land the proposed roof is to be constructed.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed carport is being constructed.

  • Please nominate the distance from the proposed roof structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (f) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 - 5m; or
    (ii) for development carried out in any other zone - 900mm

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the distance from the proposed roof structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (f) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 - 5m; or
    (ii) for development carried out in any other zone - 900mm

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed roof to the nearest boundary.

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for any other level of certification and any design changes to what is noted in this assessment may affect this. I have read and agree with the above.

  • Please nominate the size of the floor area of the existing dwelling.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (c) not cause the total floor area of all such structures on the lot to be more than:
    (i) for a lot larger than 300sqm - 15% of the ground floor area of the dwelling on the lot; or
    (ii) for a lot 300sqm or less - 25sqm

  • Please enter the total floor area of the existing dwelling.

  • The total area of the proposed roof cannot exceed 15% of ground floor area of the dwelling on the lot

  • Please enter the total area of the proposed roof

  • I confirm that the information provided in relation to the size of the existing dwelling is true and accurate. I fully understand that the proposed roof cannot exceed 15% of the ground floor area of the dwelling on the lot to be constructed as Exempt Development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) and if so will require another form of approval with all associated costs for reports and certification not included in the contract price. Overall sizes will be confirmed once the information is received in the office.

  • Please nominate the zoning of the land the proposed roof is to be constructed.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed carport is being constructed.

  • Please nominate the distance from the proposed roof structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (f) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 - 5m; or
    (ii) for development carried out in any other zone - 900mm

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed roof structural posts and beams to the nearest boundary.

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed roof to the nearest boundary.

  • Unfortunately your roofed area does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the existing roof being replaced or added onto?

  • Will the new proposed roof be changed in design, increase in size or be re positioned from the existing roof??

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please assess the proposed new roof as a new design.

  • Is the proposed roof located in a heritage conservation area or a draft heritage conservation area?

  • Is the proposed addition to the roof located behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (o) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located behind the building line of any road frontage

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (o) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located behind the building line of any road frontage

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located in a heritage conservation or draft heritage conservation area.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located within a heritage conservation area or draft heritage conservation area, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract.
    Should your project require certification as a result, all costs associated with obtaining reports and certification costs are not included in your contract price.

  • Will the proposed roof addition have a floor height underneath of over 1m above existing ground level?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (i) have a floor height not more than 1m above ground level (existing)

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the addition to the existing roofed area have an enclosing wall or screen higher than 1.4m?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (d) not have an enclosing wall higher than 1.4m

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed addition to the roof located behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (e) be located behind the building line of any road frontage

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the overall height of the proposed addition to the existing roof above existing ground level.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (j1) be no higher than 3m at its highest point above ground level (existing).

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the proposed addition cause any part of the entire structure to be attached to a dwelling?

  • Will the proposed roof addition cause the roof to extend above the gutter line of the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (j) if it is a roofed structure attached to a dwelling - not extend above the roof gutter line of the dwelling.

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed roof addition being constructed on bushfire-prone land?

  • Will the proposed roof addition cause the entire area to be closer than 5.0m to the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (n) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (n) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.

    A BAL assessment will be required to determine the material requirements for construction of your carport unless all materials are non-combustible.
    The cost of the BAL assessment is not included in your contract price and is to be organised and paid directly by you to the relevant professional or company.
    Your project will not be able to proceed past the design stage without this information.

  • Please nominate the size of the lot the proposed roof addition is being constructed.

  • Please nominate the overall size of the proposed roof addition including the existing area.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (c) not cause the total floor area of all such structures on the lot to be more than:
    (i) for a lot larger than 300sqm - 15% of the ground floor area of the dwelling on the lot; or
    (ii) for a lot 300sqm or less - 25sqm

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the zoning of the land the proposed roof addition is to be constructed.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed carport is being constructed.

  • Please nominate the distance from the proposed roof additions structural posts and beams to the nearest boundary.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (f) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 - 5m; or
    (ii) for development carried out in any other zone - 900mm

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed roof addition to the nearest boundary.

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the proposed roof additions structural posts and beams to the nearest boundary.

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the size of the floor area of the existing dwelling.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (c) not cause the total floor area of all such structures on the lot to be more than:
    (i) for a lot larger than 300sqm - 15% of the ground floor area of the dwelling on the lot; or
    (ii) for a lot 300sqm or less - 25sqm

  • Please enter the total floor area of the existing dwelling.

  • The total area of the proposed roof cannot exceed 15% of ground floor area of the dwelling on the lot.

  • Please enter the total area of the proposed roof

  • I confirm that the information provided in relation to the size of the existing dwelling is true and accurate. I fully understand that the proposed roof cannot exceed 15% of the ground floor area of the dwelling on the lot to be constructed as Exempt Development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) and if so will require another form of approval with all associated costs for reports and certification not included in the contract price. Overall sizes will be confirmed once the information is received in the office.

  • Please nominate the zoning of the land the proposed roof addition is to be constructed.

  • Does the proposed works include construction of a deck?

  • Is the decking new or existing?

  • Is the proposed deck located in a heritage conservation area or a draft heritage conservation area?

  • Is the proposed deck located behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 10 Carports
    2.19 Specified Development
    The construction or installation of a carport is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.20 Development Standards
    (1) The standards specified for that development are that the development must:
    (m) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located in the rear yard.

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (o) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area - be located behind the building line of any road frontage

  • Upon acceptance of this order and receipt in office, a 10.7 certificate will be ordered from your local council.
    The 10.7 is a standard planning certificate specific for your property which contains information such as whether your lot is located in a heritage conservation or draft heritage conservation area among other things.
    The cost of the 10.7 planning certificate is included in your contract price.
    If your property is deemed to be located within a heritage conservation area or draft heritage conservation area, design requirements may need to be changed to construct as exempt development under the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW).
    Any design alterations required will be done by way of variation to contract after the information becomes available.
    Any required reports or associated costs for the approval if required is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • Will the proposed deck have a floor height of over 1m above existing ground level?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (i) have a floor height not more than 1m above ground level (existing)

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the proposed deck have an enclosing wall or screen higher than 1.4m?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (d) not have an enclosing wall higher than 1.4m

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Will the proposed deck be located behind the building line of any road frontage?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (e) be located behind the building line of any road frontage

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Is the proposed deck being constructed on bushfire-prone land?

  • Will the proposed deck be closer than 5.0m to the existing dwelling?

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (n) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or verandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (n) if it is located on bush fire prone land and is less than 5m from a dwelling - be constructed of non-combustible material.

    A BAL assessment will be required to determine the material requirements for construction of your carport unless all materials are non-combustible.
    The cost of the BAL assessment is not included in your contract price and is to be organised and paid directly by you to the relevant professional or company.
    Your project will not be able to proceed past the design stage without this information.

  • Please nominate the size of the lot the proposed deck is being constructed.

  • Please nominate the overall size of the proposed deck.

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (c) not cause the total floor area of all such structures on the lot to be more than:
    (i) for a lot larger than 300sqm - 15% of the ground floor area of the dwelling on the lot; or
    (ii) for a lot 300sqm or less - 25sqm

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the zoning of the land the proposed deck is to be constructed.

  • Please go to https://www.planningportal.nsw.gov.au/ and enter the address to obtain the zoning of the land the proposed deck is being constructed.

  • Please nominate the distance from the deck to nearest boundary

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (f) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 - 5m; or
    (ii) for development carried out in any other zone - 900mm

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Please nominate the distance from the deck to nearest boundary

  • State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW)
    Subdivision 6 Balconies, decks, patios, pergolas, terraces and verandahs
    2.11 Specified Development
    The construction or installation of a balcony, deck, patio, pergola, terrace or varandah (whether free standing or attached to the ground floor level of a building, or roofed or unroofed) is development specified for this code if it is not constructed or installed on or in a heritage item or a draft heritage item or on land in a foreshore area.
    2.12 Development Standards
    The standards specified for that development are that the development must:
    (f) be located at a distance from each lot boundary of at least:
    (i) for development carried out in Zone RU1, RU2, RU3, RU4, RU6 or R5 - 5m; or
    (ii) for development carried out in any other zone - 900mm

  • Unfortunately your project does not comply with the requirements in the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) as being able to be constructed as Exempt development.
    Another form of approval will be required, and will be determined by Greenfield Certifiers at a cost of $220.00 payable directly by you after your design has been confirmed and drafted. Upon assessment, any further reports required will be advised as they become known and the full extent of approval will be determined.
    Any required reports or associated costs for the approval is not included in your contract price and is payable directly by you to the relevant companies, experts or authorities.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

  • Congratulations!
    From the information provided, your project has been designed to comply with the State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 (NSW) to be constructed as exempt development.
    Any design changes or alterations to this may effect the ability to construct as exempt development and may require approval.

  • All the information determined in this assessment is provided by myself and deemed to be true and accurate at the time of acceptance. I am aware that there will be additional costs outside of the contract price for certification and agree with the above.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.