Title Page
-
Prepared by
-
Area
- Line 01
- Line 02
- Line 03
- Line 07
- Line 08
- Line 11
- Upstream
-
Asset
- CIP plant
- Preparation Area
- Product Pans & Equipment
- Sugar
- Water Treatment
- Preform Manufacturing
-
Asset
- Blender
- Blower
- Filler
- Capper
- Conveyors
- Labeller
- Shrinkpacker
- Handle Applicator
- Pack labellers
- C30 Palletiser
- Robot Palletiser
- Stretchwrapper
- Pallet Bander
- Pallet Labeller
-
Asset
- Blower
- Airveyors
- Labeller
- Filler
- Capper
- Conveyors
- Shrinkpacker
- Pack Labellers
- ACMI Palletiser
- Stretchwrapper
- Palletiser Labeller
-
Asset
- ECC
- CSW
- Blender
- Filler
- Seamer
- Conveyors
- Shrinkpacker
- Combiner
- Pack Labellers
- TSP
- Divider
- Pack Conveyors
- ACMI Palletiser
- Stretchwrapper
- Palletiser Labeller
-
Asset
- Blender
- Filler
- Capper
- Blower
- Conveyors
- Labeller
- Shrinkpacker
- Pack Labellers
- Handle applicator
- Sleever
- ACMI Palletiser
- Stretchwrapper
- Robot Palletiser
- Robot Wrapper
- Pallet Labeller
-
Asset
- ECC
- CSW
- Filler
- Seamer
- Conveyors
- Multipackers
- Kisters
- Pack Labellers
- H&K Palletiser
- ACMI Palletiser
- Stretchwrapper
- Pallet Labeller
-
Asset
- ECC
- CSW
- Blender
- Filler
- Seamer
- Conveyors
- Riverwood
- Kister
- Pack Labellers
- H&K Palletiser
- Strechwrapper
- ACMI palletiser
- Pallet Labeller
-
CIL Reference
-
Audit Live / Post
-
Work Order
Knowledge & Implementation
-
Is the CIL document being followed?
-
Has the operator been trained or shown the task before?
-
By whom
-
When
-
Does the tech or tech op have all the materials, tools or PPE documented in the CIL?
-
Does the tech or tech op require any other materials or tools to complete the CIL?
-
Notification to be raised.
-
Does the tech or tech op find any discrepancies while completing the task.
-
Notification to be raised
Planning & Housekeeping
-
Is the task completed in the time stated on the CIL?
-
Is the frequency of the task correct?
-
Notification to be raised.
Administration
-
Have any defects found been documented, escalated, notification raised?
-
Do any notifications raised have sufficient detail?
-
If the task requires parts, has the technician reserved & consumed the parts for the task?
-
Does the technician know how many defects are outstanding in his area, do they know where the parts are stored to correct the defect if parts are needed?