Title Page

  • Conducted on

  • Prepared by

  • Location

Academy Trainer Opening/Mid/Closing Procedures

  • Report to the opening Manager for morning brief.

  • Complete and record the morning pool test. Confirm completion with the opening manager.

  • Take out iPads, computer and radios from the safe.

  • Is radio synced to the right channel 5 and volume up? (must be worn at all times on shift).

  • Turn on front desk TV.

  • Plug in computer and open up Ez-Runner, iAuditor and TRP.

  • Check Ez-Runner and shift patterning for the day.

  • Turn on all bikes.

  • Turn on all treadmills and lower the incline to 0.

  • Turn music on to peak levels for all 3 floors.

  • Turn on boxing ring timer.

  • Make sure windows in stretch area are closed.

  • Thorough final sweep of the gym floor and studios etc. before signing off with the duty manager.

  • any additional notes

  • Morning AT handover to mid-shift AT. Any tasks at hand? Any issues?

  • Add signature

8:00am Floor Sweep

  • Turn music to off peak levels at 8:00am

  • 8:00am pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • any additional notes

10:00am Floor Sweep

  • 10:00am pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • Sherwood studio - All equipment to be tidied and put away as per SOP (bars, weights, steppers etc.)

  • Brewer studio - ensure all windows are closed, mats set up as per SOP, heating off.

  • Dojo - All equipment to be tidied and put away, large mats to be moved inside Dojo.

  • any additional notes

12:00pm Floor Sweep

  • Turn music to peak levels at 12:00pm.

  • 12:00pm pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • any additional notes

2:00pm Floor Sweep

  • Turn music to off peak level at 2:00pm

  • 2:00pm pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • Mid-shift AT handover to closing AT. Any tasks at hand? Any issues?

  • any additional notes

  • Add signature

4:00pm Floor Sweep

  • 4:00pm pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • Sherwood studio - All equipment to be tidied and put away as per SOP (bars, weights, steppers etc.)

  • Brewer studio - ensure all windows are closed, mats set up as per SOP, heating off.

  • Dojo - All equipment to be tidied and put away, large mats to be moved inside Dojo.

  • any additional notes

6:00pm Floor Sweep

  • Turn music to peak levels at 6:00pm.

  • 6:00pm pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • any additional notes

8:00pm Floor Sweep

  • Turn music to off peak levels at 8:00pm.

  • 8:00pm pool test completed? Confirm with duty manager.

  • Is the gym floor clean, tidy and a safe environment to train in?

  • Is the stretch area clean, tidy and equipment packed away?

  • Is all equipment in the correct place and front facing according to brand standards?

  • Sherwood studio - All equipment to be tidied and put away as per SOP (bars, weights, steppers etc.)

  • Brewer studio - ensure all windows are closed, mats set up as per SOP, heating off.

  • Dojo - All equipment to be tidied and put away, large mats to be moved inside Dojo.

  • any additional notes

Closing Procedures 10:00pm - 11:00pm

  • Report to closing manager for brief.

  • Complete and document final pool test. Confirm completion with closing manager.

  • Ensure Group X headsets are on charge. Confirm with closing manager.

  • Put iPads and computer in safe.

  • Turn off the radio and put it on charge.

  • All equipment to be put away and front facing, adhering to brand standards.

  • Ensure the gym floor is clean, tidy and left in a safe training environment.

  • Take all swimming equipments from the pool and place back to the cupboard

  • Turn off all bikes.

  • Put all treadmills on incline 15 and turn off.

  • Ensure all high risk member interaction has been documented on TRP.

  • Turn music off on all 3 floors.

  • Turn off boxing ring timer.

  • Log and report any damaged or missing equipment.

  • Make sure stretch area windows are closed.

  • Thorough final sweep of the gym floor and studios etc. before signing off with the duty manager.

  • Email this report to the assistant fitness manager, fitness manager, operations manager and general manager:<br>michael.gennaris@thirdspace.london<br>fiona.jenkinson@thirdspace.london<br>soho.operations@thirdspace.london

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.