Title Page
-
Conducted on
-
Prepared by
-
Location
Academy Trainer Opening/Mid/Closing Procedures
-
Report to the opening Manager for morning brief.
-
Complete and record the morning pool test. Confirm completion with the opening manager.
-
Take out iPads, computer and radios from the safe.
-
Is radio synced to the right channel 5 and volume up? (must be worn at all times on shift).
-
Turn on front desk TV.
-
Plug in computer and open up Ez-Runner, iAuditor and TRP.
-
Check Ez-Runner and shift patterning for the day.
-
Turn on all bikes.
-
Turn on all treadmills and lower the incline to 0.
-
Turn music on to peak levels for all 3 floors.
-
Turn on boxing ring timer.
-
Make sure windows in stretch area are closed.
-
Thorough final sweep of the gym floor and studios etc. before signing off with the duty manager.
-
any additional notes
-
Morning AT handover to mid-shift AT. Any tasks at hand? Any issues?
-
Add signature
8:00am Floor Sweep
-
Turn music to off peak levels at 8:00am
-
8:00am pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
any additional notes
10:00am Floor Sweep
-
10:00am pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
Sherwood studio - All equipment to be tidied and put away as per SOP (bars, weights, steppers etc.)
-
Brewer studio - ensure all windows are closed, mats set up as per SOP, heating off.
-
Dojo - All equipment to be tidied and put away, large mats to be moved inside Dojo.
-
any additional notes
12:00pm Floor Sweep
-
Turn music to peak levels at 12:00pm.
-
12:00pm pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
any additional notes
2:00pm Floor Sweep
-
Turn music to off peak level at 2:00pm
-
2:00pm pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
Mid-shift AT handover to closing AT. Any tasks at hand? Any issues?
-
any additional notes
-
Add signature
4:00pm Floor Sweep
-
4:00pm pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
Sherwood studio - All equipment to be tidied and put away as per SOP (bars, weights, steppers etc.)
-
Brewer studio - ensure all windows are closed, mats set up as per SOP, heating off.
-
Dojo - All equipment to be tidied and put away, large mats to be moved inside Dojo.
-
any additional notes
6:00pm Floor Sweep
-
Turn music to peak levels at 6:00pm.
-
6:00pm pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
any additional notes
8:00pm Floor Sweep
-
Turn music to off peak levels at 8:00pm.
-
8:00pm pool test completed? Confirm with duty manager.
-
Is the gym floor clean, tidy and a safe environment to train in?
-
Is the stretch area clean, tidy and equipment packed away?
-
Is all equipment in the correct place and front facing according to brand standards?
-
Sherwood studio - All equipment to be tidied and put away as per SOP (bars, weights, steppers etc.)
-
Brewer studio - ensure all windows are closed, mats set up as per SOP, heating off.
-
Dojo - All equipment to be tidied and put away, large mats to be moved inside Dojo.
-
any additional notes
Closing Procedures 10:00pm - 11:00pm
-
Report to closing manager for brief.
-
Complete and document final pool test. Confirm completion with closing manager.
-
Ensure Group X headsets are on charge. Confirm with closing manager.
-
Put iPads and computer in safe.
-
Turn off the radio and put it on charge.
-
All equipment to be put away and front facing, adhering to brand standards.
-
Ensure the gym floor is clean, tidy and left in a safe training environment.
-
Take all swimming equipments from the pool and place back to the cupboard
-
Turn off all bikes.
-
Put all treadmills on incline 15 and turn off.
-
Ensure all high risk member interaction has been documented on TRP.
-
Turn music off on all 3 floors.
-
Turn off boxing ring timer.
-
Log and report any damaged or missing equipment.
-
Make sure stretch area windows are closed.
-
Thorough final sweep of the gym floor and studios etc. before signing off with the duty manager.
-
Email this report to the assistant fitness manager, fitness manager, operations manager and general manager:<br>michael.gennaris@thirdspace.london<br>fiona.jenkinson@thirdspace.london<br>soho.operations@thirdspace.london
-