Title Page
-
Conducted on
-
Prepared by
-
Location
-
Captains Wheel House Check
- Good
- Fair
- Poor
- N/A
-
Decking Inpsection Front
Decking Inspection Back
-
See that Issues are Identified and How long to Repair
Main Engine Room
-
Inspect Issues In Engine Rooms
Welding Areas Needed
-
Identified Where the Welding works is taking places. How Long will it be Completed
RAMP Fixing To Check
-
Check Identified RAM Issues
Safety First Check
-
What are The Safety First Needed Here thats Lacking
Kitchen Room Check
FIRE Hydrant and Fire Extinguiser Check Qtys
-
Confirm where are the FH and Qtys
Passenger Lounge Area Check
-
Confirm All Neccessary Repair works Done and When is it going to be Completed
• Weld all Anodes onto the vessel
-
Check quanitities
• Weld new plate from areas cut out.
-
Confirm How many New Plates how long it will Take
• Cut out new hole found on hull and weld.
-
Double Inspect and Confirm Other Holes
• Fix all stitch welds on waterline which are clearly marked
-
Check On All these. How many Weldings
• Weld bolts to deck for timber
-
Confirm how many Bolts to Weld
• Laydown all timber
-
Confirm how Long will it Cober for a Day. M2
• Remove all seating and pack into container
-
To confirm of this again If New Seating will.be Done
• Monitior blasting of all tanks ( we are providing primer and international tank paint.
-
Confirm of this tasks to Ops
• Paint anchors after blasting – Primer and Abcon Black
• Antifoul complete ship after wipe down
Confirm on Shippemnts
• Keep a log of all progress from Rabweld
-
Confirm Log Books
Works Needed to be Done• Weld all Anodes onto the vessel <br><br>• Weld new plate from areas cut out. <br><br>• Cut out new hole found on hull and weld. <br><br>• Monitior blasting of all tanks ( we are providing primer and international tank paint. <br><br>• Fix all stitch welds on waterline which are clearly marked <br><br>• Keep a log of all progress from Rabweld <br><br>• Paint Deck with new International deck paint <br><br>• Weld bolts to deck for timber <br><br>• Laydown all timber <br><br>• Remove all seating and pack into container <br><br>• Paint anchors after blasting – Primer and Abcon Black <br><br>• Paint door – Abcon Black, primer already completed <br><br>• Paint boulber – Primer, intermediate and antifoul <br><br>• Antifoul complete ship after wipe down
Captains Decking Need Renewed