Title Page

  • Conducted on

  • Finished Unloading

  • Prepared by

  • Location
  • Container ID

  • Material list

  • Please describe why is material list missing.

  • Material list number.

  • Amount of workers for unloading.

  • Please describe reason for additional workforce.

  • Amount of work hours

Material receivables

  • Picture of opened doors and material arrival status.

  • Is container safe to unload?

  • Reason for safety violation. Contact PM and STOW representative.

  • Unloading method.

  • Is SIMPLY available/operational? If NO, proceed with manual/forklift unloading.

  • Reason.

  • Was the material stored indoor?

  • Was the material covered? (no galvanized steel can be stored outdoors)

  • Reason and solution ETA.

  • Is the load stacked, packed correctly and unloaded without any problems?

  • Is the load easly removable not too heavy for sliding out? Provide notes if experiencing difficulty with removal.

  • Any damages to material?

  • Create a separate report of damaged material after complete inventory and notify PM and STOW.

  • Is there adequate space for the materials delivered?

  • Has all material been taken inside? None forgoten or left behind?

  • Complete inventory match with material list?

  • Reason. (if missing material, complete a separate report)

  • Montaze Broz representative signature

  • STOW representative signature

  • Reason for missing signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.