Title Page

  • Project Name

  • Sales Order Number

  • Builder

  • End User

  • Conducted on

  • Walk through conducted by:

  • Site Foreman

  • Project Manager

  • Location

General Inspection For Field Equipment

  • Does all Audio Visual equipment in the room receiver power?

  • Is all equipment installed per the scope of works?

  • Is all visible cabling neatly secured with velcro and socked?

  • Are all cables labelled as per the approved Audio Visual schematics (ensure most recent drawings are being used).

General Inspection for the Rack

  • Is there a rack present in the room?

  • Is the rack able to be pulled out to a reasonable distance that provides serviceability to the back and sides?

  • Is all the equipment that are mounted on shelves fastened using appropriate methods? (Cable Ties are not allowed)

  • Are all cables labelled as per the approved Audio Visual schematics (ensure most recent drawings are being used).

  • Is there any copper exposed in any of the terminations?

  • Have all cables been installed with an adequate bend radius as recommended by the manufacturer?

  • Is there a centralised rack for all equipment in this room?

  • Is the rack able to be pulled out to a reasonable distance that provides serviceability to the back and sides?

  • Is all the equipment that are mounted on shelves fastened using appropriate methods? (Cable Ties are not allowed)

  • Are all cables labelled as per the approved Audio Visual schematics (ensure most recent drawings are being used).

  • Is there any copper exposed in any of the terminations?

  • Have all cables been installed with an adequate bend radius as recommended by the manufacturer?

Display Testing

  • What displays were tested?

  • Was LCD.01 able to turn on & off?

  • Were the sources for LCD.01 able to be changed?

  • Has overscan been turned off?

  • Was LCD.01 able to turn on & off?

  • Were the sources for LCD.01 able to be changed?

  • Has overscan been turned off?

  • Was LCD.02 able to turn on & off?

  • Were the sources for LCD.02 able to be changed?

  • Has overscan been turned off?

  • Was LCD.03 able to turn on & off?

  • Were the sources for LCD.03 able to be changed?

  • Has overscan been turned off?

  • Was LCD.04 able to turn on & off?

  • Were the sources for LCD.04 able to be changed?

  • Has overscan been turned off?

  • Was LCD.05 able to turn on & off?

  • Were the sources for LCD.05 able to be changed?

  • Has overscan been turned off?

  • Was LCD.06 able to turn on & off?

  • Were the sources for LCD.06 able to be changed?

  • Has overscan been turned off?

  • Was LCD.07 able to turn on & off?

  • Were the sources for LCD.07 able to be changed?

  • Has overscan been turned off?

  • Was LCD.08 able to turn on & off?

  • Were the sources for LCD.08 able to be changed?

  • Has overscan been turned off?

  • Was LCD.09 able to turn on & off?

  • Were the sources for LCD.09 able to be changed?

  • Has overscan been turned off?

  • Was LCD.10 able to turn on & off?

  • Were the sources for LCD.10 able to be changed?

  • Has overscan been turned off?

  • Did the Projector turn on/off?

  • Was PROJ.01 able to change sources?

  • Did PROJ.01 turn on/off?

  • Was PROJ.01 projecting in the correct format to the screen/board?

  • Was there a projection screen?

  • Did PROJ.01 fill the screen?

  • Was the screen able to be lowered and raised without issues?

  • Was the screen able to be lowered and raised without issues?

  • Did PROJ.02 turn on/off?

  • Was PROJ.02 able to change sources?

  • Was PROJ.02 projecting in the correct format to the screen/board?

  • Was there a projection screen?

  • Did PROJ.02 fill the screen?

  • Was the screen able to be lowered and raised without issues?

  • Did PROJ.03 turn on/off?

  • Was PROJ.03 able to change sources?

  • Was PROJ.03 projecting in the correct format to the screen/board?

  • Was there a projection screen?

  • Did PROJ.03 fill the screen?

  • Was the screen able to be lowered and raised without issues?

  • Did PROJ.04 turn on/off?

  • Was PROJ.04 able to change sources?

  • Was PROJ.04 projecting in the correct format to the screen/board?

  • Was PROJ.04 able to change sources?

  • Was there a projection screen?

  • Did PROJ.04 fill the screen?

  • Was the screen able to be lowered and raised without issues?

  • Did PROJ.05 turn on/off?

  • Was PROJ.05 able to change sources?

  • Was PROJ.05 projecting in the correct format to the screen/board?

  • Was there a projection screen?

  • Did PROJ.05 fill the screen?

  • Was the screen able to be lowered and raised without issues?

  • Did PROJ.06 turn on/off?

  • Was PROJ.06 able to change sources?

  • Was PROJ.06 projecting in the correct format to the screen/board?

  • Was there a projection screen?

  • Did PROJ.06 fill the screen?

  • Was the screen able to be lowered and raised without issues?

Source Selection

  • What sources are currently able to be displayed?

Audio Testing

  • Is there audio in the room?

  • How is the audio being distributed?

  • Are all speakers producing audio?

  • Is the audio level adequate for the size of the room?

  • Is the audio being sent through a Digital Signal Processor?

  • Has all DSP programming been installed and are all signals are being passed as intended?

Control Testing

  • What is the Control System?

  • Is the Control System connected to the network?

  • Does the GUI conform to the clients requirements?

  • As per the AV Scope, is all the necessary equipment able to be selected and controlled?

Video Conferencing

  • Does the room have Video Conferencing capabilities?

  • Has a test conference call been made?

  • What microphone/s have been installed?

  • Do the Ceiling Array Microphones pick up the users normal talking voice?

  • Are there any echoes experienced during the Video Conferencing call?

  • Has a Camera been installed?

  • Is the Camera installed in a position that views the entire audience?

  • Does the camera have Zoom/Tilt capabilities?

  • Can the camera be controlled via a remote or touch panel? (e.g. zoom & tilt functionality).

Sign Off

  • Pacific confirm that the Audio Visual System installed meets the requirements described in the Audio Visual Specification.

  • Pacific's representatives signature.

  • I acknowledge that the AV system has been tested and meets the requirements as stated in the Audio Visual Specification.

  • Client's signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.