Title Page

  • Document No.

  • Audit Process- Steel Fabrication (AISC Management Review)

  • Company / Plant

  • Conducted on

  • Prepared by

  • Location
  • Personnel

5.0 Management Responsibility

5.1 Commitment (Policy)

  • Is there a commitment to quality that includes a commitment to meet contract requirements?.

  • Are there Quality Management System objectives that provide a framework for establishing and reviewing quality goals of the Fabricator's organization?.

  • Is there at a minimum of one specific measurable quality goal related to Structural Steel Fabrication?

  • Are specific measurements related to goals being recorded?.

  • Are current goal achievement levels known relative to a previous measurement or baseline?.

5.2 Direction and Leadership

  • Are opportunities for improvement of product quality reviewed by Executive Management?.

  • Are internal, external, and AISC audits reviewed by Executive Management?.

  • Are Quality Management System changes reviewed by Executive Management?.

  • Is Customer feedback, for example; surveys, letters of recognition, personal interviews, requests for Corrective Action and complaints reviewed by Executive Management?.

5.3 Management Representative

5.4 Resources

5.5 Internal Communication

5.6 Documentation Requirements

6.0 Contract & Project Spec. Review and Comm.

  • Does the organization have a Documented Contract & Project Spec. Review and Comm. Procedure?

  • Are Records generated? (Eg Contract Review form)<br>

7.0 Detailing

  • Does the organization have a Documented Detailing Procedure?

  • Does the organization have and maintain a Request For Information Methodology?

7.1 Detailing Procedures

7.2 Detailing Function Resources

8.0 Document and Data Control

  • Does the organization have a Documented Document and Data Control Procedure?

8.1 Review and Approval

8.2 Customer Requirements

8.3 Revision Control

  • List current Drawing Revisions on the Shop Floor

  • Laying around in office

8.4 Access

8.5 Obsolescence and Transmiittal

9.0 Control of Quality Records

  • Does the organization have a Documented Control of Quality Records Procedure?

  • All quality records are stored on-site in each respective department in a way that prevents damage, deterioration or loss?

10.0 Purchasing

  • Does the organization have a Documented Purchasing Procedure?

10.1 Purchasing Data

  • Is Material purchased per ASTM A6?

  • List Materials

  • Heat, Grade, Size, Shape

10.2 Selection of Subcontractors

  • Does the organization have Suppliers?

  • Approved Vendor List
  • Does the organization have a Method of evaluating their Suppliers?

10.3 Verification of Purchased Product, Materials and Services

10.4 Control of Supplied Material

11.0 Material Identification

  • Does the organization have a Documented Material Identification Procedure?

  • Is stock material traceable?

  • Angle Iron

  • Material is traceable to Purchase Order?

  • Material is traceable to Certified Mill Test Report (CMTR)?

  • Material is Identified with Grade?

  • WFlange Beam
  • Material is traceable to Purchase Order?

  • Material is traceable to Certified Mill Test Report (CMTR)?

  • Material is Identified with Grade?

  • Channel
  • Material is traceable to Purchase Order?

  • Material is traceable to Certified Mill Test Report (CMTR)?

  • Material is Identified with Grade?

  • Tube Steel
  • Material is traceable to Purchase Order?

  • Material is traceable to Certified Mill Test Report (CMTR)?

  • Material is Identified with Grade?

  • HSS
  • Material is traceable to Purchase Order?

  • Material is traceable to Certified Mill Test Report (CMTR)?

  • Material is Identified with Grade?

12.0 Erection Process Control

12.1 Welding

  • Does the organization have a Documented Welding Procedure?

  • Are welding consumables traceable?

  • SMAW

  • Consumables are traceable to Purchase Order?

  • Consumables are traceable to a Certified Mill Test Report (CMTR)?.

  • Consumables are Identified on Welding Procedure Specification (WPS)?

  • Welding Machines are Maintained on a regular bases?.

  • How are weld consumables stored?.

  • FCAW

  • Material is traceable to Purchase Order?

  • Material is traceable to a LOT No.?

  • Material is traceable to a Certified Mill Test Report (CMTR)?.

  • Material is Identified on Welding Procedure Specification (WPS)?

  • Welding Machines are Calibrated?

  • Special Welding Consumables
  • Material is traceable to Purchase Order?

  • Material is traceable to a LOT No.?

  • Material is traceable to a Certified Mill Test Report (CMTR)?.

  • Material is Identified on Welding Procedure Specification (WPS)?

  • Welding Machines are Calibrated?

  • Do Welders have Welding Gauges?

12.2 Bolt Installation

  • Does the organization have a Documented Bolt Installation Procedure?

  • Is stock material traceable?

  • ASTM A325

  • Material is traceable to Purchase Order?

  • Material is traceable to Certificate of Conformance (CoC)?.

  • Material is Identified with Grade?

  • ASTM A490
  • Material is traceable to Purchase Order?

  • Material is traceable to Certificate of Conformance (CoC)?

  • Material is Identified with Grade?

  • ASTM F1852 Type1
  • Material is traceable to Purchase Order?

  • Material is traceable to Certificate of Conformance(CoC)?

  • Material is Identified with Grade?

  • Bolts Tested prior to Installation
  • Are Bolts Tested and Documented as being Acceptable prior to Installation per RCSC Requirements?

12.3 Material Preparation for Application of Coatings

  • Does the organization have a Documented Preparation for Application Procedure?

  • Are environmental conditions monitored?.

  • Is surface temperature monitored?.

  • How are paint consumables stored?.

13.0 Inspection

  • Does the organization have a Documented Inspection and Testing Procedure?

  • Are weld inspectors qualified?.

  • Does the organization utilize a sampling plan?.

  • Do the welding inspectors perform 100% VT?.

  • Do the welding inspectors have their eye tests of file?

13.1 Assignment of QC inspections and Monitoring

13.2 Inspection Procedure

14.0 Calibration of Inspection, Measuring and Test Equipment

  • Does the organization have a Documented Calibration Procedure?

  • Are Inspection Tools traceable to NIST Standard?

  • Master Tape Rule

  • Is measuring tape calibrated?

  • Is Certificate of Conformance (CoC) on file?

  • Is Certificate of Conformance (CoC) current and traceable to an NIST Standard?

  • Volt/ AMP Meter

  • Is Volt/ AMP Meter calibrated?

  • Is Certificate of Conformance (CoC) on file?

  • Is Certificate of Conformance (CoC) current and traceable to an NIST Standard?

  • Skidmore

  • Is Skidmore calibrated?

  • Is Certificate of Conformance (CoC) on file?

  • Is Certificate of Conformance (CoC) current and traceable to an NIST Standard?

15.0 Control of Nonconformance's

  • Does the organization have a Documented Nonconformance Procedure?

16.0 Corrective Action

  • Does the organization have a Documented Corrective Action Procedure?

17.0 Handling, Storage & Delivery of Product and Materials

  • Does the organization have a Material Handling Procedure?

18.0 Training

  • Does the organization have a Training Methodology?

19.0 Internal Audits

  • Does the organization have a Documented Internal Audit Procedure?

20.0 Safety Management System

20.1. Documentation Requirements

20.1.1. Safety Manual

  • Does the Organization have periodical Safety and Health inspections of their crews?

  • Does the Organization have a Incident investigation Methodology?

  • Does the Organization have a Hazard prevention and control plan?

  • Does the Organization have institutionalized Safety and health training?

  • Does the Organization issue Personal Protective Equipment (PPE) and are items maintained?

  • Does the Organization communicate potential Onsite Hazards to the Field Crew?

  • Does the Organization have Lockout/tag out procedure?

  • Does the Organization have a Respiratory protection procedure?

20.1.2. Erection Plan

  • Does the Organization have a written procedure that defines the method by which an Erection Plan (PSEP) is created and maintained?

20.1.3. Safety Plan

  • Does the Organization have a written procedure that defines the routine by which a Safety Plan (PSSP) is created and maintained?

20.1.4. Other Project-Specific Requirements

  • Does the Organization define their project specific Erecting and Safety Methods?

20.2. Safety Training

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.