Information
Asset Information
-
Client / Site
-
Asset No:
-
Asset Location:
-
Engineer:
-
Conducted on
Asset Information
Asset Information
-
Make
- Besam
- KABA
- Dorma
- GEZE
- JMD
- Stanley
- Tormax
- FAAC
- Came
- Ditec
- sesamo
- Other
-
Model
-
Door Style
- Swing
- Bi-Part Slide
- Single Slide
- Bi-Fold
- Single Telescopic
- Double Telescopic
- Other
-
If OTHER then detail
-
Conforming Standard
PMI Door Checks
General Condition
-
Check the installation, location and siting of all equipment against the conforming standard
-
Check for sound physical fixings of all equipment including loosening or corrosion of supports and fixings
-
Check door set for correct operation and function
-
Check mains and stand-by power supplies including correct charging voltages
-
Check service identification and spur labels installed correctly
Entry Devices
-
Check the satisfactory operation of all detection and activation devices
Exit Devices
-
Check the satisfactory operation of all detection and activation devices
Safety
-
Check draw In and finger trap protection
-
Check safety signage
-
Check the satisfactory operation of all safety devices devices
-
Check fire alarm integration?
End User
-
Check Door Operation is relevant to client current needs
-
Review system site handbook and update log (where available)
-
Check user is familiar with operation and emergency override
Summary PMI Outcome
PMI Outcome
-
Based on the above assessment we consider this door system to have:
-
Congratulations your system has PASSED its basic visual PMI checks, and is considered at his time to be safe to operate.
Please ensure though you carry our regular visual checks and ensure any actions needed are reported immediately to us. -
Your system is considered to have passed the basics visual checks, however we have identified additional further actions that are required to make the doors function fully or to meet the BS7036 standard to which they should have been installed. Additional remedial works will be provided to you in a separate report along with associated costs.
-
Your system is considered to have FAILED it's visual PMI checks on a number of serious items and in our opinion is unlikely to comply with BS7036 until these remedial actions are taken to ensure the door system is safe for use. The remedial actions will be provided to you in a separate report along with associated costs.
In the meantime you may wish to consider placing the door "out of action"until these remedial works are completed! -
Your system has been CONDEMNED which indicates that we have found significant failures in either the door structure which could lead to injury, or failures in system operation that render the door unsafe for continued use.
We strongly advise the door be placed "out of action" until such time as remedial or replacement works can be carried out.
-
Engineer signature