Title Page
-
Date:
-
Project/Job Name:
-
Client:
-
Site Location:
-
Personnel Onsite (initials):
-
Emergency Evacuation Point:
-
Do all personnel have current First Aid & CPR certificates?
-
Have all personnel completed a General Construction Induction (White Card)?
-
Have all personnel completed Manual Handling training?
-
Is the weather likely to affect works today?
-
Discuss a plan to avoid exposure to hazardous weather...
-
Does anyone have any injuries or illness that may impact their work?
Tasks, Hazards & Controls
What tasks we are doing today?
-
Describe the task:
-
Describe the task:
-
Describe the task:
-
Describe the task:
Identify Hazards & Controls
-
Identify a Hazard:
-
How will the Hazard be controlled?
-
Identify a Hazard:
-
How will the Hazard be controlled?
-
Identify a Hazard:
-
How will the Hazard be controlled?
-
Identify a Hazard:
-
How will the Hazard be controlled?
PPE
-
Does the site have specific PPE requirements?
- Hard Hat
- Hearing Protection
- Gloves
- Steel cap boots
- Hi--Vis vest
- Safety Glasses
- Respiratory aid
- Full Length shirts/pants
-
Additional PPE required for specific tasks?
-
Is the required PPE available and in good condition?
Permits and Equipment
Have any required Permits been completed?
-
Confined Space Entry
-
Electrical Isolation
-
Hot Works
-
Environmental / Land Access
-
Utility Providers or Council
-
Other:
General Equipment & Fire Isolation
-
Are ladders in good condition?
-
Are the available ladders appropriate for the tasks?
-
Does electrical equipment have valid test tags?
-
Do the tasks being completed require isolation of the fire alarm system?
-
Who is repsponsible for isolating the fire alarm system?
High Risk Works & Competencies
Select tasks requiring HRW tickets or other competencies
-
Cabling Works under AS/CA S009
-
Do personnel have valid Open Cabling Registration with the required endorsements?
-
If unfamiliar, consult the SWMS for this task:
-
TCA1 Form can be downloaded here:
-
Working at Heights
Describe the task:
-
Briefly describe the work at heights task:
-
Briefly describe the associated fall hazard:
Hierarchy of controls for access / fall prevention:
-
Can the task be completed using an EWP?
-
-
Can the task be completed using Scaffold (fixed or portable)?
-
-
Can temporary guard rails be installed to remove the fall hazard?
-
-
Can permanent fall prevention anchors and fall restraint be installed?
-
-
Can this task be completed using qualified rope access personnel?
-
Can this task be completed using a temporary fall arrest system?
-
-
Forklift Use
-
Do personnel have the required HRWL?
-
If unfamiliar, consult the SWMS for this task:
-
Working with Vulnerable People
-
Have personnel completed a Working with Vulnerable people check?
Discussion
-
Are there any incidents, positive events/news, etc. that require discussing?
-
Any other notes here:
Pre-Start Acknowledgement
Pre-start Sign on
-
I, the undersigned, hereby certify that I have been inducted to this job site by (X) or Site Supervisor, and that I have actively participated in the identification of hazards, assessment and control of risks associated with working at this location by way of this pre-start briefing. I agree to implement the control measures identified, including the use of the appropriate PPE:
Add person:
-
Name and Signature: