Title Page
-
Document No.
-
University of Surrey - 5GIC Infrastructure Construction Project
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Health and Safety
Signing and Guarding of Works
-
Has the work area, includkng the storage of plant materials been signed and guarded adequately
-
If No, add information
-
Picture before corrective measures
-
Picture after corrective measures
Working at Height
-
Are all works conducted at below 2 metres above ground and don not require access to roof tops?
-
If No, add Information
-
Picture
Asbestos Risk and other Hazardous Chemicals
-
Is there any indication that either asbestos or other hazardous chemical or material are present in the proximity of the work area?
-
If Yes, add information
-
Picture
PPE Requirements
-
Have all operatives complied with th site rules and using PPE required for the works undertaken?
-
If No, add information
-
Picture
Site Access, Egress and Lone Working
-
Are the works located in the areas where access is restricted due to client requirements or within areas where "confined spaces" procedures need to be applied?
-
Describe process undertaken
-
Are operatives working alone?
-
Describe process undertaken
Manual Handling
-
Does the work necessitate the lifting or moving of heavy objects or use of vibrating plant?
-
If Yes, describe measures being taken
Construction Phase
Pulling Fibre, Termination
-
Are all fibre installation works completed to the required specificstion and tested?
-
If No, why?
-
Picture
-
What is the estimated completion date for the fibre installation works?
Hand Over of Completed Site
-
Have all of the works related to the picocell in question been completed to the satisfaction of the contract administrator and a handover inspection/meeting been conducted?
-
Picture
-
Information
Electronic Signature of Auditor
-
Signature