Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Carpentry to be completed during Pre reoccupancy Inspection - 2hs allocated
-
Check deck, hand rails & steps
-
Check ramps
-
Check all doors
-
Check all door locks
-
Check Door Closers
-
Check security/flyscreen doors
-
Perform key check
-
Check for RF3 weather seal
-
Provide 25mm clearance to all doors from the floor
-
Check all door hinges are fixed securely and in good working order
-
Check door bumper/tamcos throughout
-
Check all windows, rollers, tracks and clips
-
check all window flyscreens
-
Check window architraves/sills
-
Check window furnishings
-
Check louvers
-
Check all sliding doors and tracks
-
Check all timber flooring, rescrew loose boards and replace rotten boards
-
Check all ceilings
-
Check all ceiling joints
-
Check all walls internal
-
Check all wall sheeting and cover strips throughout
-
Check wardrobes
-
Check hanging rails
-
Check cutlery divider
-
Check all cupboard doors, latches and shelving
-
Check dishwasher spaces F/C to floor + 55mm holes in side of cpboard
-
Replace metal screws in splashbacks, bath/shower sheeting with xmas tree plugs
-
Check shower screen
-
Check vanity
-
Check mirror
-
Check silicon to wet areas and shower screens/grout
-
Check towel rail x 2
-
Check shaving cabinet
-
Check soap solder
-
Check for lift off hinges to toilet door
-
Check toilet roll holder
-
Check splashback over tubs and washing machine area, vanities and kitchen
-
Remove box aircon frame and reinstate wall
-
Check letterbox and number
-
Check all walls external
-
Check fences
-
Check pad bolts
-
Cut battens 50mm to 75mm above ground
-
Check awning at carport
-
Check concrete
-
Check soffits
-
Check clothesline
-
Remove hooks, nails, screws, curtin brackets, clips, etc externally & Internally
-
Check garden shed - remove any old locks
-
Check for termite activity
-
Check door bell
-
Check Fire Blanket
-
Check concrete plinth at a/c outdoor unit
-
TA/Labourer Hours
-
Total Trademan Hours/Costs
-
Total TA/Labourer's Hours/Costs
Electrical to be completed during Pre reoccupancy Inspection - 4hrs allocated
-
Check whether switch board / mains upgrade is required
-
Check Earthin System
-
Replace all GPOs with clipsal's 2000's [Doubles] with the exception of Dishwasher & A/C points which are to remain single clipsal 2000's if required
-
Check fans & fan controls
-
Check smoke detectors
-
Check exhaust fan
-
Check light fittings and switches
-
Check hot water system
-
Check rangehood
-
Check stove
-
Check TV antennae and reception
-
Check Mechenical protection of cables to bearers on highset
-
Check shed
-
Removal of illegal wiring
-
Complete Certificate of Compliance - Section 159/15 Safety Regulation 2002
-
Complete "Comestic household electrical safety check report" (AWX document)
-
Appretice hours
-
Total Apprentice Hours/Costs
-
Total Trademan Hours/Costs
Plumbing to be completed during Pre reoccupancy Inspection - 2hrs allocaed
-
Check all taps and tap washers are working correctly - Internal and external
-
Check hot water system/solahart
-
Check HWS pressure relief valve
-
Where an electric HWS is fitted, fit duo valve if no return or valve is missing
-
Check all guttering and report back to superisor
-
Checkfloor waste otlet
-
Check tempering valve
-
Check all toilet bowls
-
Check all toilets seats
-
Check all cisterns for dual flush
-
Check all bath, kitchen and laundry spouts, traps and shower roses
-
Check and secure all down pipes
-
Check all roof is screwed at joints, centre of roof sheet and along bottom batten
-
Check shoes on all downpipes
-
Check reticulation in yard
-
Check for water hammer
-
Check water preasure
-
Pressure test waterpipes
-
Clean out gutters
-
Apprentice hours
-
Hot Cold Taps
-
Laundry Taps washing Machine
-
Fit new bolted trap screw
-
Visual inspection and check flexible hoses
-
Total Trademan Hours/Costs
-
Total Apprentice Hours/Costs
Air Conditioning to be completed during Pre reoccupancy Inspection - 2hrs allocated
-
Coil & fan clear on Split Systems
-
Service RACs
-
Service Ducted Split
-
Apprentice hours
-
Total Trademan Hours/Costs
Yard Work to be completed during Pre reoccupancy Inspection - 2hrs allocated
-
Weed Garden Beds
-
Prune Trees/Shrubs away from gutters
-
Mow Lawn and tidy yard
-
Wash down house
-
Remove all rubbish and leave surrounds clean
-
Clean out garden shed
-
Total Trademan Hours/Costs
Painting to be completed during Pre reoccupancy Inspection - 2hrs allocated
-
Internal Walls
-
Internal Ceilings
-
Internal Skirting Gloss work
-
Internal Patching & Preperation
-
Other internal Painting
-
External Preperation
-
External Walls
-
External Facia / Guttering
-
Eaves / Soffits
-
Dogboards
-
Other External Painting ( Pergola / Shed's etc)
-
Total Trademan Hours/Costs
Cleaning to be completed during Pre reoccupancy Inspection - 2hrs allocated
-
Full internal Clean
-
Shampoo Carpets
-
Seal and polish vinyl
-
Total Trademan Hours/Costs
-
signature
-
Inspection date