Information

  • Site conducted

  • Document No. (EG - BAL2021-1000)

  • Property Address including Lot & DP

  • Location
  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

SWMS

SITE INSPECTION RISK ASSESSMENT

  • SWMS

  • SWMS

SITE INSPECTION RISK ASSESSMENT CHECKLIST

  • Are you familiar with the relevant SWMS and confident all aspects of your inspection are safe ?

  • Complete the checklist below and identify and concerns

  • Add photos of any risks

  • Comments / Issues

  • Travelling to site - vehicle

  • Entering/exiting vehicle

  • Working outdoors, solar/UV radiation, heat stress, snake or insect bite

  • Asbestos

People and Animal related risks

  • Are there any People or Animal related risks?

  • Unrestrained dogs on site

  • Aggressive or abusive people

  • Attack by livestock

  • Contractors working overhead

Land related risks

  • Are there any land related risks?

  • Remote area

  • Uneven or slippery ground

  • Electric fencing

  • Inspections at levels above ground floor level

  • Excavated holes or trenches on site

  • Contact with irritant causing vegetation

  • Flowing watercourse or waterbody

  • Dusty conditions

Other risks

  • Are there any other risks?

  • Moving vehicles or machinery on site

  • Equipment malfunction/misuse

  • Puncture wounds or cuts - sharp objects

  • Confined spaces

  • Excessive noise

  • Manual Handling

  • Flying objects or materials

  • Something else

  • Detail the risk

  • CONTROL MEASURES - If any Red (At Risk) boxes are selected, the relevant SWMS must be selected and followed. http://sccintranet/PoliciesProceduresSWIsSWMS/GroupSWMS.aspx

  • Find SWMS here
    http://sccintranet/PoliciesProceduresSWIsSWMS/GroupSWMS.aspx

BAL CERTIFICATE ASSESSMENT

DEVELOPMENT PROPOSAL

  • Date and Time of Inspection

  • Development is on Bush Fire Prone Land

  • Type of Developement

  • Location of Development

  • PBP 2019 Assessment Type

DIRECTION FROM DEVELOPMENT - NORTH EAST QUADRANT

  • Vegetation formation (within 140 metres) (Appendix 1 pages 80 - 94 of PBP 2019)

  • Is vegetation remnant? (p88)

  • Effective Slope under the hazard (over 100m) (Appendix 1 pages 80 - 94 of PBP 2019)

DISTANCE TO VEGETATION FORMATION

  • Actual (metres)

  • APZ within Lot or non/reduced-vegetated area (p71)

CONSTRUCTION STANDARDS DETERMINATION (APPENDIX 1)

  • AS3959- 2018 Level of Construction (PBP - Table A1.12.5 page 91)

  • Allowable reduction (Appendix 1 of PBP 2019 p86)

DIRECTION FROM DEVELOPMENT - NORTH WEST QUADRANT

  • Vegetation formation (within 140 metres) (Appendix 1 pages 80 - 94 of PBP 2019)

  • Is vegetation remnant? (p88)

  • Effective Slope under the hazard (over 100m) (Appendix 1 pages 80 - 94 of PBP 2019)

DISTANCE TO VEGETATION FORMATION

  • Actual (metres)

  • APZ within Lot or non/reduced-vegetated area (p71)

CONSTRUCTION STANDARDS DETERMINATION (APPENDIX 1)

  • AS3959- 2018 Level of Construction (PBP - Table A1.12.5 page 91)

  • Allowable reduction (Appendix 1 of PBP 2019 p86)

DIRECTION FROM DEVELOPMENT - SOUTH WEST QUADRANT

  • Vegetation formation (within 140 metres) (Appendix 1 pages 80 - 94 of PBP 2019)

  • Is vegetation remnant? (p88)

  • Effective Slope under the hazard (over 100m) (Appendix 1 pages 80 - 94 of PBP 2019)

DISTANCE TO VEGETATION FORMATION

  • Actual (metres)

  • APZ within Lot or non/reduced-vegetated area (p71)

CONSTRUCTION STANDARDS DETERMINATION (APPENDIX 1)

  • AS3959-2018 Level of Construction (PBP - Table A1.12.5 page 91)

  • Allowable reduction (Appendix 1 of PBP 2019 p86)

DIRECTION FROM DEVELOPMENT - SOUTH EAST QUADRANT

  • Vegetation formation (within 140 metres) (Appendix 1 pages 80 - 94 of PBP 2019)

  • Is vegetation remnant? (p88)

  • Effective Slope under the hazard (over 100m) (Appendix 1 pages 80 - 94 of PBP 2019)

DISTANCE TO VEGETATION FORMATION

  • Actual (metres)

  • APZ within Lot or non/reduced-vegetated area (p71)

CONSTRUCTION STANDARDS DETERMINATION (APPENDIX 1)

  • AS3959 Level of Construction (PBP - Table A1.12.5 page 91)

  • Allowable reduction (Appendix 1 of PBP 2019 p86)

BAL - LEVEL DETERMINATION

  • Determination

  • Comments/Other Issues

  • Provide comments on matters nominated above, any other relevant matters, departures and non-compliances and note required conditions of consent.

OTHER CONSIDERATIONS - WATER - ACCESS

  • Is a Hydrant located within 60m of the building subject to the BAL Application?

  • Does the Access comply with PBP?

EXERCISE OF DELEGATION

  • Is the determination of this application within your delegations specified within the Development and Environmental Services Group Guidelines for the use of Delegated Authority document

  • Officers Name and Accreditation Number

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.