Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Project name/Job number
-
Balcony type/QA number
-
Date Built
Physical inspection
-
Overall structural dimensions check’s completed within 2mm of structural drawings-Width/Length/Squareness
-
Have the correct fixings been used
-
Have the mitre gaskets been installed
-
Have you torqued to the correct Nm as per the drawing 150-170Nm
-
Has the torque data been downloaded and grouped to the Milwaukee App( Arm connections)
-
Have the soffits and skirt been cleaned/de-greased
Inspected by Signature/Print
-
Print name and sign