Working Supervisors File

  • Are contents up to date and complete?

  • Are COSHH Assessments on site, correct and understood?

  • Is the risk assessments on site, correct and understood?

Traffic Management

  • Chapter 8 signs correct

  • Barriers in place and in good condition

  • Site tidy, materials stored correctly, safely

  • Cones correctly placed and reflective sleeves in good condition

  • Safety zones maintained

  • Pedestrian routes clear, signed and adequate

Vehicles, plant and equipment

  • Good condition and trained operatives

  • Chapter 8 marked vehicles fitted with beacons and reversing alarms

  • Security of vehicles, equipment when not working

  • Dust suppression systems in use

  • Maintenance registers correct for all plant ( weekly inspection book for jcb)

  • Lifting equipment checked in last 6 months, correct colour code

  • Towed plant and trailers lighting boards

  • Second form of braking on towed plant I.e brake chain

  • Ladders identified, checked, register, policy and permit to use or PAS 250

Training

  • Staff trained to minimum standard, CSCS, SSSTS, ETS, CPCS

  • All inducted, including sub contractors and agency

POWRA

  • Completed for site

  • Suitable and sufficient for task

PPE

  • Hard hats

  • Long sleeve, not rolled up, hi vis top and trousers

  • Flame retardant

  • Gloves

  • Hearing protection

  • Eye protection

Welfare

  • Water container, drinking water

  • Toilet available

  • Washing facilities, hot water for washing hands

  • Cabin provided, clean and adequate

  • Smoking area

First aid, fire fighting and emergency planning

  • First aider on site

  • Contact details of nearest hospital

  • First aid kit

  • Fire fighting equipment on site

  • Accident, incident, near miss procedure understood on site

Site layout and housekeeping

  • Safe, tidy and professional

Services

  • Stat plans on site

  • CAT scan completed and trial holes dug

  • Locations marked

  • 212 completed and on site

  • OHC specific RAs and measures in place ( goal posts, height limiters)

  • Insulated tools, flame retardant clothing

Working at height

  • Correct access equipment selected for task

  • Fall arrest equipment worn

  • Emergency plan understood

  • TM and public protected from falling objects

Hand arm vibration

  • Activity suitably planned

  • Staff awareness of HAVS

  • Dates of last HAVS screening ( max 12 months)

Manual handling

  • Staff trained in manual handling techniques

  • Mechanical use to reduce risk, but appropriate

  • Lifting tackle correctly colour coded and inspected

Excavation management

  • Staff trained in excavations upto 1.2 m

  • 1.2 to 2 m authorised person planned and approved

  • 2m + approval via ground specialists

  • Specific RA available 223 completed daily

Environmental issues

  • How is waste being disposed

  • WTN completed correctly

  • Are spill kits available

  • Is fuel stored correctly

  • Controls in place for noise, dust, water pollution

  • Pre work assessment completed

  • Specific RA if working over water, approved by SHEQ Dept

Other comments or observations

  • Notes and media others

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.