Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
SHE Policy
-
Statement of Intent
-
Organisation
-
Arrangements
-
Date / reviewed in the last 12 months
-
Copy obtained / on TiVa
-
Does the organisation employ competent SHE person or support.
HSG 65 compliance
-
Does the SC have evidence to prove they are HSG 65 compliant
Safety sector scheme relevant
-
What safety sector schemes are relevant to the SC for BBLP works
-
Certificate of sector scheme approval and date
-
Training matrix and competences
-
Test 10% of competences, were these correct and adequate
Accreditations
-
What accreditations does the SC have
-
Copies of in date certificates
-
Do they have plans to gain other accreditation
Additional SHE Training delivered
-
Inductions
-
Tool box talks
-
Asbestos awareness
-
Manual handling
-
Working at Height
-
PPE training
Monitoring process
-
What is the routine internal monitoring system
-
Have any external / internal audits been conducted in the last 12 months.
BBLP Inductions
-
How are these currently conducted?
-
Induction BBLP register - check to contract
Incident and accident profile
-
How are these reported internally.
-
How is WHMC informed and updated
-
Environmental Incidents
-
Does the SC use the BBLP incident hotline 0800 121 4444
AFR -AIR
-
AFR calculated
-
Was this correct and has it been updated on TiVa if relevant.o
-
AIR calculated
-
Was this correct and has TiVa been updated if relevant.
Health surveillance
-
What, if any regular screening is conducted by the SC on its employees
-
HAVS
-
Drink and drugs policy and testing
HSE details
-
Improvement notices
-
Prohibition notices
PPE
-
Is the SC aware of the BBLP policy on PPE and do they meet the standards.
-
Full Hi Vis
-
Flame retardant
HAVS Records
-
Is HAVS training conducted.
-
Does the SC use a HAVS planning tool.
-
How does the SC ensure that operatives know their respective trigger times.
Equipment maintenance
-
How does the SC manage the daily checks of vehicles, plant and equipment.
-
PAT completed 3 monthly 110v
-
PAT on other electrical equipment?
Insurance
-
Does the SC have suitable and in date insurance
-
Copy of certificate available for inspection and records
Summary
-
Overview of Audit and SC compliance in Respect to SHE matters observed during this assessment