Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

QA Fire/Acoustic Sealing (QCC 004)

  • Select date

  • Check partition specification for acoustic & fire ratings

  • Confirm materials for acoustic / fire stopping eg fire batt or just acoustic sealant

  • Check and confirm if fire stopped from one side or both

  • Confirm that mastic has been applied correctly to all penetrations

  • Confirm that stopping around cable trays has been formed correctly so that others can install intumescent fire bags

  • Confirm that all penetrations have been completed at time of inspection

  • Comments

  • Add signature

  • Photographs of relevant areas

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.