Title Page
-
Document No.
-
Date/Time
-
BANLAW JOB INFORMATION
-
Prepared by
-
Document Number, Job Number and Description
-
CLIENT/SITE INFORMATION
- Rio Tinto Kennecott
- NGM Cortez
- NGM Goldstrike
- Kinross Round Mountain
- Kinross Black Gold
- Kinross Manh Choh
- Kinross Bald Mountain
- Oceana Gold Haile Gold
- Kiewit North Rasmussen
- Hermosa South 32
- Barrick PVDC
- Barrick Golden Sunlight
- SA Recycling
-
Direct Site Contact for Appointment and Attendees
- Cortez - Kevin Stills
- Cortez - Kim Melton
- RTK - Russell Bogle
- RTK - Matt Stanley
- RTK - Matt Laird
- RTK - Eric Eatherton
- Goldstrike - Lorraine Jury
- Goldstrike - Adam Murray
- Haile Gold - Juan Lizarraga
- Haile Gold - Burton Jaillette
- Haile Gold Marty Geddings
- PVDC -
- KRM - Danny Buelna
- KRM - Bon Davidson
- Kiewit - Tyler Sather
-
Location
- Cortez - #1 Mine Ops - Diesel Island Pipeline (South Gap)
- Cortez - #2 Mine Ops - Diesel Island, Pipeline Shop Area
- Cortez #3 - Mine Ops - Diesel Fuel Facility, Hills - CHOP CNTRL
- Cortez #4 - Diesel Dyed Fuel, Facility 2, Mill 1
- Cortez #5 - Diesel Fuel Facility, Pipeline (Shop Area) Operations
- Cortez #6 - Clear Diesel Fuel Facility, Mill 1
- Cortez #7 - Diesel Dyed Fuel System, GHUG Fuel Facility
- Cortez #8 - Diesel Fuel System, Corridor Fuel Facility
- Cortez #9 - Diesel Dyed Fuel System, CHUG 3910 Fuel Bay
- Cortez #10 - Gas Fuel System, CHUG Fuel Facility
- Cortez #11 - Gas Island, Pipeline Area
- Cortez #12 - Gas Island, Cortez Hills Area
- RTK - Smelter
- RTK - Smelter Anode
- RTK - Smelter Kress Hauler
- RTK - Smelter Unleaded
- RTK - Refinery
- RTK - Tailings North West
- RTK - Tailings North West Unleaded
- RTK - Tailings South East Fuel Bay
- RTK - KOS
- RTK - Rail
- RTK - Gate 66
- RTK - SAW (South Area Water)
- RTK - Concentrator
- RTK - Code 80 Clear Diesel
- RTK - Code 80 Tank Farm
- RTK - Code 80 South Wall
- RTK - Code 80 North Wall
- RTK - Code 80 Fuel Island
- RTK - Markham Unleaded
- RTK - Underground Fuel Bay
- RTK - 6880 East Wall
- RTK - 6880 West Wall
- RTK - 6880 Fuel Bay
- RTK - Lark Unleaded
- RTK - Lark Diesel
- Goldstrike - Meikle
- Goldstrike - Rodeo
- Goldstrike - SWE (South West Energy)
- Goldstrike - Crusher Bay #1
- Goldstrike - Crusher Bay #2
- Goldstrike - Crusher Bay #3
- Goldstrike - Crusher Bay #4
- Goldstrike - Crusher Delivery
- Goldstrike - Unleaded Fuel Bay #1
- Goldstrike - Unleaded Fuel Bay #2
- Goldstrike - Unleaded Fuel Bay Delivery
- Haile Gold - 601 Fuel Bay
- Haile Gold - FT01
- Haile Gold - FT02
- Haile Gold - FU01
- Haile Gold - DS01
- Haile Gold - DS02
- Haile Gold - LV Bay
- Haile Gold - TS1 Fuel Truck
- Haile Gold - TS2 Fuel Truck
- Haile Gold - TS4 Fuel Truck
- Haile Gold - 68 Fuel Truck
- KRM - Small Fuel Bay (Light Vehicle)
- KRM - Shop Lube room
- KRM - Large Fuel Bay #1
- KRM - Large Fuel Bay #2
- KRM - Mobile Fuel Skid #1
- KRM - Mobile fuel Skid #2
- KRM - Mobile Fuel Skid #3
- KRM - Mobile Fuel Skid #4
- KRM - Gold Hill
- KRM - 920 Fuel Truck
- KRM - 921 Fuel Truck
- KRM - 922 Fuel Truck
- KRM - 923 Fuel Truck
- KRM - 764 Fuel Truck
- PVDC - 1701 Fuel Truck
- PVDC - 733 Fuel Truck
- PVDC - 499 Fuel Truck
- PVDC - 1700 Fuel Truck
- PVDC - Cumba
- PVDC - Refinery
- PVDC - TSF
- PVDC - Mine Diesel
- PVDC - KILN
- PVDC - Process Plant Light Vehicle
- PVDC - HFO
- Kiewit - Fuel Truck
-
Billing Types
- ESTMN
- ESTCTZLABOR
- ESTTRAV
- ESTTRAVCTZ
- General Sales Work
- Meetings - Internal | 3000
- Meetings - Clients | 3500
- Holiday
- Sick
- Annual Leave
- Office Proposals | 6000
- Monthly PM Inspection
- Monthly Facilities Maintenance Inspection
- Training | 9000
- Warranty | CT2023 Nozzle Spring Change Out
- Delay Weather | 81000
- Office CRM | 2500
- Leave without Pay
-
Special Conditions
- PM
- Facility Maint
- Service
- Project
- Non-Utilized time
- Utilized Time
- Warranty Product
- Warranty - Project
- Warranty CT Nozzles
- Annual SLA
- Inspection
Scope of Work
-
Enter a new Job Task for each entry in Scope of Works
Task
-
undefined
Pre-work Checklist
-
Site Access and Training all up to date to perform the Job Tasks
-
Speak with site rep when entering property
-
Proper PPE for job, site and conditions
-
Tools in good condition to include computer
-
Parts Required
-
Part Requisition Form
-
Parts Requisition completed and Submitted
Conducting Work
-
Date of Work
-
Vehicle Inspection Complete
-
Complete Job Safety Paperwork(attach before work progresses)
-
Attach Safety Paperwork
-
Enter a new Line of information for each Job task in the Scope of Work
Line
-
Task Line
-
Description of work performed
-
Attach Pictures (Optional)
Defects / Action Items
-
For Each Defect/Action enter a new Action Item
Action
-
Replace Filters - 8 each - OFS-840X-3B - 5-Micron Beta>1000 filter element, 2 each - 12-000016 - O-Ring
-
Attach picture(Optional)
-
1. Identify filter media replace filters (4) Oil Filtration filter elements, particulate removal (OFS-840X) 2. Identify and replace O-ring (1) O-Ring (12-000016) <br>3. Operations shall be locked out and tagged out prior to commencing work. (No<br>receiving or dispensing) try out by closing and isolating valves.<br>4. Remove cover from top and remove filter elements. 5. Install new filter elements . 6. Install covers, remove locks and test. 7. Write on filter or tag the filter change date. 8. Dispose of old filters.
-
comments
-
Attach picture(Optional)
-
Keyboard and Backlights operational (Xpress)
-
comments
-
Attach picture(Optional)
-
Panel seals, screws, and locks
-
comments
-
Attach pictures (Optional)
-
Display (Xpress)/Touchscreen (Advanced)
-
comments
-
Attach pictures (optional)
-
Keyboard and Backlights operational (Xpress)
-
comments
-
Attach pictures (Optional)
-
Digital inputs/Overfill protection/CPA/Level Switch
-
comments
-
attach picture (Optional)
-
Key fob reader
-
comments
-
Attach picture (Optional)
-
Communications to ResTrack server
-
comments
-
Attach picture (Optional)
-
Communications to TLM
-
comments
-
Attach picture (Optional)
-
Swipe Card Reader
-
comments
-
Attach picture (Optional)
-
FMS overrides
-
comments
-
Attach picture (Optional)
-
System UPS battery operational
-
comments
-
Attach picture (Optional)
-
Panel heater(s) operational
-
comments
-
Attach picture (Optional)
-
Secure-Fill dry-break swivel functionality and Auto-Id wire
-
comments
-
Attach picture (Optional)
-
Auxiliary Panel Indicators
-
comments
-
Attach picture (Optional)
-
SecureFill dry-break functionality and wiring condition
-
comments
-
Attach picture (Optional)
-
Secure-Fill splash fill functionality
-
comments
-
Attach picture (Optional)
-
Nozzle Holster(s)
-
comments
-
Attach pictures (Optional)
-
Loading arm/hose arrangement
-
comments
-
Attach pictures (Optional)
-
Breakaway valve / breakout point. *Specifically Only use Banlaw engineered studs in breakaway valves
-
comments
-
Attach pictures (Optional)
-
Unloading flow meter, Unloading RTD temperature probe and wiring, Unloading Flow computer for temperature compensation
-
comments
-
Attach pictures (Optional)
-
Dispensing flow meter, Dispensing RTD temperature probe and wiring, Dispensing Flow computer for temperature compensation
-
comments
-
Attach pictures (Optional)
-
Control Actuated ball valve(s)/solenoid valve(s) and pump control, Pressure relief on control valves and one-way valves back to tank
-
comments
-
Attach pictures (Optional)
-
Panel internal terminations are tight, Electrical conduits tight and sealed, Sensor cables, Panel earthing tight, Field terminations and junction boxes sealed tight
-
comments
-
Attach pictures (Optional)
-
Accurate Electrical Drawing(s)
-
comments
-
Attach pictures (Optional)
-
Remote fixed screen enclosure VGA, USB, Power Cable(do not unplug with the power turned on), Communication Device looks functional (ethernet lights on ports/Maestro/Moxa)
-
comments
-
Attach pictures (Optional)
-
Tank level sensor(s), Tank level temperature transmitter
-
comments
-
Attach pictures (Optional)
-
Des-Case Breathers - Do they need replaced?(Bulb indicator what color is it? Record the change out Date)
-
comments
-
Attach pictures (Optional)
-
All Lights functioning properly?
-
comments
-
Attach pictures (Optional)
-
Check for spills / leaks at fuel facility
-
comments
-
Attach pictures (Optional)
-
Check Containment Area for leaks, standing water, fuel
-
comments
-
Attach pictures (Optional)
-
Check Piping route for leaks, missing insulation, other issues?
-
comments
-
Attach pictures (Optional)
-
Check with Area Technician for any other issues at the facility
-
comments
-
Attach pictures (Optional)
Job Completion
-
Job Number
-
Total Hours (This Sheet)
-
Are there any action/defect items still required to complete job?
-
BANLAW Representative
-
CLIENT Authorized Representative