Information

  • Barclays

  • Conducted on

  • Prepared by:

  • Location

Pre-visit

  • As Fixed Drawings Downloaded?<br><br>If no, explain why not

  • Is the existing asbestos survey adequate for strip out?<br><br>Is it R&D?

External of Branch

  • Branded Signage removal: Is tower or podium required?<br>

  • Dimension at highest point of signage

  • Add media

  • Letterbox to be sealed?

  • Photos of internal and external

  • Add media

  • External ATM removal:<br><br>Capture each ATM and internal photos<br>

  • Confirm making good required - Brick up, Glass (by Wincor) or Metal Plate

  • Dims:

  • Photos of internal and external

Access/Egress

  • Is there suitable parking for Site Set Up delivery?

  • Add media

  • Waste removal:

  • Note: If Skip is selected, please ensure there is a dedicated space, away from the High St/Main Road so a permit is not required

Banking Hall & Secure Area

  • Capture the type/types of Entrance Doors: (Both external and internal)

  • Clear opening dimensions

  • Photos of internal and external

  • What type of counter line is present?<br><br>(Capture photo)

  • Add media

  • Capture ceiling height Dims in Banking Hall:

  • Capture ceiling height Dims in Cash Office:

  • Blinds in place to cover all windows?<br><br>If not, un-branded plain black Corex to be installed to internal windows.

  • Add media

  • Is there a lift/hoist present?

  • Is the lift/hoist operational?

  • Add media

  • Is there an Internal ATM?

  • Add media

  • Is there an Internal Kiosk / OLBP?

  • Add media

  • Is there an Internal Drop Box?

  • Add media

  • Is there an Internal QPP?

  • Add media

Gunnebo Safes & Strong Rooms

  • Is there a Night Safe?

  • Please note O/A Dimensions

  • To Be Removed

  • Add media

  • Does removal of the night safe involve breaking out to the surrounding floor

  • Are Water, Gas, Electric and Data services clear of the floor Area to be broke out

  • Mark service locations on As built DWGS and include to MEP section

  • Add media

  • Do Branch Have Key / Access?

  • Is a Force Open Required (Pre Closure)

  • Is there a Double Safe?

  • Add location
  • Please note O/A Dimensions

  • To Be Removed

  • Provide Photos Including KABA Locks

  • Do Branch Have Key / Access?

  • Is a Force Open Required (Pre Closure)

  • Is there a Single Safe?

  • Please note O/A Dimensions

  • To Be Removed

  • Provide Photos Including KABA Locks

  • Do Branch Have Key / Access?

  • Is a Force Open Required (Pre Closure)

  • Is there a Strong Room?

  • Provide Photos Including KABA Locks

  • Do Branch Have Key / Access?

  • Is a Force Open Required (Pre Closure)

  • Is there a Book Room?

  • Add media

  • Do Branch Have Key / Access?

  • Is a Force Open Required (Pre Closure)

Alarm Systems

  • Is there perimeter alarm in use at branch?

  • Do all exits have contacts? <br><br>Add Photos

  • Add media

Basement

  • Is there a basement within the building?<br><br>If so, capture any relevant items below:

  • Add media

MEP

  • Is there air conditioning within the building? (Please ensure locations marked on drawings)

  • Please record the Number of internal units & Number of external condenser units.

  • Add media

  • Is there safe access to external condenser units

  • Please record more details of possible means of access.

  • Provide Relevant photos

  • Capture details of Fire Alarm

  • Please record any relevant details (is a 3rd party demise linked to System?)

  • Provide photos of fire panel and zoning chart.

  • Is there a gas meter? (Ensure location marked on drawings)

  • Provide photos of gas meter

  • Can water meter be located?

  • Please record any relevant details including location (is a 3rd party demise linked to System)

  • Provide photos of water meter

  • Capture Electric meter details

  • Please record any relevant details including location (is a 3rd party demise linked to System)

  • Provide photos of electric meter

  • Capture Main electric feed and DB and to include all sub DBs

  • Please record any relevant details including location (is a 3rd party demise linked to System)

  • Provide photos of mains feed and all DBs open and any label charts.

  • Is there an existing boiler?

  • Please record any relevant details including location & if operational (mark location on drawing)

  • Provide photos of boiler

  • Is there a Radon System?

  • Please record any relevant details including location (mark location on drawing)

  • Provide photos of Radon System

  • Do any of the above need relocating if walls are being removed?

  • Please record any relevant details.

  • Provide photos of items to be removed

  • Ensure service locations are marked on DWGS and considered if intrusive works are proposed particularly if breaking out the night safe is required

Retail Team details

  • Branch Opening Hours:

  • Branch closing at:

  • Nearest Branch:

  • Any additional requests to transfer furniture or other items? Details:

Notes:

  • Note the size of branch:

  • Capture any other notes applicable to Project: Listed building? Shared services / tenants ? Night works required?

  • Are there residential properties above or to either side?

  • Any other items

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.