Information
-
Barclays
-
Conducted on
-
Prepared by:
-
Location
Pre-visit
-
As Fixed Drawings Downloaded?<br><br>If no, explain why not
-
Is the existing asbestos survey adequate for strip out?<br><br>Is it R&D?
External of Branch
-
Branded Signage removal: Is tower or podium required?<br>
-
Dimension at highest point of signage
-
Add media
-
Letterbox to be sealed?
-
Photos of internal and external
-
Add media
-
External ATM removal:<br><br>Capture each ATM and internal photos<br>
-
Confirm making good required - Brick up, Glass (by Wincor) or Metal Plate
-
Dims:
-
Photos of internal and external
Access/Egress
-
Is there suitable parking for Site Set Up delivery?
-
Add media
-
Waste removal:
-
Note: If Skip is selected, please ensure there is a dedicated space, away from the High St/Main Road so a permit is not required
Banking Hall & Secure Area
-
Capture the type/types of Entrance Doors: (Both external and internal)
-
Clear opening dimensions
-
Photos of internal and external
-
What type of counter line is present?<br><br>(Capture photo)
-
Add media
-
Capture ceiling height Dims in Banking Hall:
-
Capture ceiling height Dims in Cash Office:
-
Blinds in place to cover all windows?<br><br>If not, un-branded plain black Corex to be installed to internal windows.
-
Add media
-
Is there a lift/hoist present?
-
Is the lift/hoist operational?
-
-
Add media
-
Is there an Internal ATM?
-
Add media
-
Is there an Internal Kiosk / OLBP?
-
Add media
-
Is there an Internal Drop Box?
-
Add media
-
Is there an Internal QPP?
-
Add media
Gunnebo Safes & Strong Rooms
-
Is there a Night Safe?
-
Please note O/A Dimensions
-
To Be Removed
-
Add media
-
Does removal of the night safe involve breaking out to the surrounding floor
-
Are Water, Gas, Electric and Data services clear of the floor Area to be broke out
-
Mark service locations on As built DWGS and include to MEP section
-
Add media
-
Do Branch Have Key / Access?
-
Is a Force Open Required (Pre Closure)
-
Is there a Double Safe?
-
Add location
-
Please note O/A Dimensions
-
To Be Removed
-
Provide Photos Including KABA Locks
-
Do Branch Have Key / Access?
-
Is a Force Open Required (Pre Closure)
-
Is there a Single Safe?
-
Please note O/A Dimensions
-
To Be Removed
-
Provide Photos Including KABA Locks
-
Do Branch Have Key / Access?
-
Is a Force Open Required (Pre Closure)
-
Is there a Strong Room?
-
Provide Photos Including KABA Locks
-
Do Branch Have Key / Access?
-
Is a Force Open Required (Pre Closure)
-
Is there a Book Room?
-
Add media
-
Do Branch Have Key / Access?
-
Is a Force Open Required (Pre Closure)
Alarm Systems
-
Is there perimeter alarm in use at branch?
-
Do all exits have contacts? <br><br>Add Photos
-
Add media
Basement
-
Is there a basement within the building?<br><br>If so, capture any relevant items below:
-
Add media
MEP
-
Is there air conditioning within the building? (Please ensure locations marked on drawings)
-
Please record the Number of internal units & Number of external condenser units.
-
Add media
-
Is there safe access to external condenser units
-
Please record more details of possible means of access.
-
Provide Relevant photos
-
Capture details of Fire Alarm
-
Please record any relevant details (is a 3rd party demise linked to System?)
-
Provide photos of fire panel and zoning chart.
-
Is there a gas meter? (Ensure location marked on drawings)
-
Provide photos of gas meter
-
Can water meter be located?
-
Please record any relevant details including location (is a 3rd party demise linked to System)
-
Provide photos of water meter
-
Capture Electric meter details
-
Please record any relevant details including location (is a 3rd party demise linked to System)
-
Provide photos of electric meter
-
Capture Main electric feed and DB and to include all sub DBs
-
Please record any relevant details including location (is a 3rd party demise linked to System)
-
Provide photos of mains feed and all DBs open and any label charts.
-
Is there an existing boiler?
-
Please record any relevant details including location & if operational (mark location on drawing)
-
Provide photos of boiler
-
Is there a Radon System?
-
Please record any relevant details including location (mark location on drawing)
-
Provide photos of Radon System
-
Do any of the above need relocating if walls are being removed?
-
Please record any relevant details.
-
Provide photos of items to be removed
-
Ensure service locations are marked on DWGS and considered if intrusive works are proposed particularly if breaking out the night safe is required
Retail Team details
-
Branch Opening Hours:
-
Branch closing at:
-
Nearest Branch:
-
Any additional requests to transfer furniture or other items? Details:
Notes:
-
Note the size of branch:
-
Capture any other notes applicable to Project: Listed building? Shared services / tenants ? Night works required?
-
Are there residential properties above or to either side?
-
Any other items
-
-