Information
-
Company
-
Date
-
Prepared by
-
Location
-
Personnel
1.0 Work Environment
-
1.1. Adequate wash areas for workers?
-
1.2. Adequate number of toilets (1:20 for males)?
-
1.3. Adequate amount of lunch rooms provided for number of workers on site?
-
1.4 Toilets and lunch rooms are clean?
-
1.5 lighting adequate?
-
1.6 Inadequate housekeeping? (site has clear pathways and rubbish managed).
-
1.7 Bins provided for food scraps and regularly cleaned?
-
1.8 Other
2.0 Plant and Equipment
-
2.1 Plant/equipment is safe / undamaged? (i.e. missing or damaged guards)
-
2.2. Plant /equipment correct for job? (e.g. grinding discs for cutting)
-
2.4. High Risk Work Licences for relevant workers?
-
2.5. Pre-operational inspection performed by operator.
-
2.7 Other
3.0 Working at Heights
-
3.1 Work at heights (including voids, pits, and trenches) are fenced or secured with scaffold or handrail protection?
-
3.2 Safe access is maintained to different levels?
-
3.3 Penetrations are covered, secured (bolted) and labelled (penetration below)
-
3.4 Edge protection is secured adequately with top and mid rail?
-
3.5 Other?
4.0 Lifting Equipment (cranes & hoists)
-
4.1. Crane or hoist is safe for use?
-
4.2. Loads lifted are safe (i.e. not over persons, or in close proximity to obstacles incl. overhead power lines)?
-
4.3. Maintenance, testing and inspection is undertaken?
-
4.4. SWL information displayed?
-
4.5. Lifting equipment, including ropes, slings, chains, hooks is safe for use?
-
4.6. Lifting equipment labelled, meet Australian Standards, has SWL displayed?
-
4.7 Other
5.0 Excavations
-
5.1. Service drawing attached and readable (DBYD)
-
5.2. Barricade & signage erected at least 1m from edge of excavation. Correct type selected and maintained.
-
5.3. Excavation/s correctly benched/battered/shored where excavation is 1.5m or more in depth
-
5.4. Adequate access/egress provided. Ladders secured where applicable
-
5.5. Spoil kept from edge of excavation (zone of influence depending on depth)
-
5.6. Plant & equipment kept safe distance from excavation edge (consider zone of influence)
-
5.7 Other
6.0 Ladders
-
6.1. Ladders are undamaged?
-
6.2. Positioning of step ladder safe and stable?
-
6.3. Ladder properly secured?
-
6.4 Ladder complies with AS (has sticker on ladder)
-
6.5 Ladder unsuitable for job? (e.g. metal ladder used for electrical work) and being use properly (3 points of contact).
-
6.6 Other?
7.0 Hazardous Manual Tasks
-
7.1. Hazardous manual tasks are risk assessed?
-
7.2 Adequate risk controls? (examples: no job rotation, lighter loads, trolleys, lifting equipment, etc)
-
7.3 Other details
8.0 Hazardous Chemical (including fuel and oil)
-
8.1. Fuels and chemicals are stored to prevent risk of spillage.
-
8.2. Incompatible chemicals not stored near each other?
-
8.3. Adequate spill containment equipment?
-
8.4. Safety Data Sheets accessible on site?
-
8.5 Emergency procedures for injury/spills/fire etc?
-
8.6 Correct PPE being used?
-
8.7 Other?
9.0 Emergency Response
-
9.1. Emergency plans prepared for site?
-
9.2. Emergency procedures displayed at site?
-
9.3. Evacuation drills conducted yearly?
-
9.4 Adequate first aid equipment on site?
-
9.5 First Aiders are available and trained for all shifts?
-
9.6. Fire extinguishers are provided and maintained (i.e. adequate numbers, correct type, tested, tagged & unobstructed)?
-
9.7 Other?
10.0 Traffic Management
-
10.1 Traffic Management Plan (TMP) are in place?
-
10.2. Traffic controllers trained?
-
10.3 Adequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)
-
10.4 Other?
11.0 Personal Protective Equipment (PPE)
-
11.1. Mandatory Site PPE being worn (safety helmet, steel cap footwear and hi-vis)?
-
11.2 Task specific PPE being worn (glasses, gloves, face shields, hearing protection)?
12.0 Electrical Hazards
-
12.1 Electrical leads and equipment safe for use? (damaged, out of test date or untested)
-
12.2 RCD protection provided?
-
12.3 Temporary supply is adequate ( i.e. SWB on each level, leads not required to run 30m, number of SWB and GPO is suitable for contractors numbers)?
-
12.4 Work near overhead electrical lines maintains safe distances or is isolated?
-
12.5 Switchboards are installed correctly ( i.e. separate isolations switch, locked cover over RCD, no gaps & space for leads at base).
-
12.6 Leads are protected against mechanical damage (i.e. off the ground or on insulated hooks or stands)?
-
12.7 Electrical equipment are not in damp operating conditions.
-
12.8 Temp. power boards (SWB) unobstructed and secured upright.
-
12.9 Other?
13.0 Scaffolding
-
13.1. Licensed persons erecting scaffold above 4m?
-
13.2. Scaffold components are in good condition?
-
13.3. Scaffolders Hand over certificate provided.
-
13.4. Scaffold complies with AS1576 i.e. not overloaded, hand rails, stairs/ladder access, fully decked, gaps less than 230mm from working edges
-
13.5. Scaffold over 4m high is inspected very 30 days
-
13.6 Other?
14.0 Environmental Hazards
-
14.1 Systems to prevent contaminants entering stormwater drains are implemented ?
-
14.2. Adequate dust suppression systems (water)
-
14.3. Silt control fencing adequately installed
-
14.4 Other
15.0 Administrative Procedures
-
15.1. Site specific Site Safety Plan on site?
-
15.2. Permits (Council, EPA, Cranes, Hot Works, Confined Space) are on site?
-
15.3. Induction for workers, contractors, visitors undertaken?
-
15.4. Supervisory arrangements suitable for project?
-
15.5 Safe Work Method Statements (SWSM) for high- risk work are on site?
-
15.6 Review SWMS undertaken to to start work.
-
15.7 Routine safety inspections, monitoring, audits undertaken on site by project staff?
16.0 Other Issues
-
16.1 Other Issues
-
16.2 Other Issues
-
16.3 Other Issues
-
16.4 Other Issues
-
16.5 Other Issues
Sign Off
-
On site representative
-
Auditor's signature