Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Replacement Detail

  • When does the bathroom require replacement? Aim to group replacement kitchens by Scheme, therefore if one or two need replacement but others do not decision is to keep all in or to delay all to future years.

  • If tenant requests that the bathroom is Not replaced have you gained a signed disclaimer from tenant at your survey?

  • Disclaimer to be signed by tenant if they do not want bathroom replaced.

Condition Status

  • What is the condition of the Bathroom

Design & Layout

  • Bathroom design to be like for like

  • Vinyl floor area?

Bathroom components in existing bathroom

  • 1700 bath

  • 1600 bath

  • Shower unit only

  • Level access shower area only

  • Sink & pedestal

  • Close couple toilet

  • Normal low level toilet

  • Electric shower

  • Properly fitted Shower on switch over taps on bath

  • Built in shower tap unit only for shower

  • Bath panel required with end panel

  • normal long side bath panel only no ends

  • Measurement of floor area

  • Any boxing in required

Electrics

  • Do we need to move or alter light

  • Shaver socket in bathroom

  • Is there an extract fan?

  • Can we install extract fan

Photo

  • Take one or two photos to capture existing layout and view of floor covering and suite.

Notes

  • Write any additional information here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.