Title Page
-
Is it safe for you to undertake this audit
-
Build Town
-
PDP Number
-
Prepared by
-
Conducted on
-
Location
Audits
- Audit
-
Node ID
-
Audit Type
-
Chamber Type
-
Has the DPU been fitted to a Mobra Bracket or Support Kit 1a
-
Has any Support Kit 1a been Installed and fitted Correctly
-
Have duct mouths been kept clear with the addition of our equipment
-
Has our equipment been routed without being entangled with existing cables
-
Are all cables within their bend radius limit
-
Have all CF cables been restrained correctly
-
Have PIA labels been installed on all cables where fixed to the Support Kit 1a
-
Do labels contain the correct information
-
Has all rope been tied off
-
Are all cable ties cut flush
-
Have all attempts been made to leave the chamber tidy
-
Has the area around the chamber been left clear of any rubbish or sharps
-
Pole Type
-
Pole ID
-
Pole Classification
-
Has the capping been fitted correctly?
-
Has the cable been dressed down the pole with an aluminium strap every 450mm
-
Have CF cables been installed without crossing any existing copper cables
-
Is an ELM fitted?
-
Has a ladder loop been left between the first and second step
-
Has the ASN and its bracket been properly mounted to the pole
-
Has the ASN been properly labelled including labels in and out
-
Have DILOR regulations been complied with
-
Has the area around the pole been left clear of any rubbish or sharps
-
Pole ID
-
Has the ASN and its bracket been properly mounted to the pole
-
Has the ASN been properly labelled including labels in and out
-
Have DILOR regulations been complied with
-
Has the area around the pole been left clear of any rubbish or sharps