Information
-
Tech Expert details
-
Tech Lead/Prepared by
-
Conducted on
-
Job No
-
Location
TECH LEAD RISK ASSESSMENT
Tech Lead risk assessment
-
Are there any hazards?
-
Are hazards controllable?
-
Details
-
Visit type
- RTW
- Post check
- Damage Claim
- Coaching
- 121
- ROD
RTW
-
Last day of absence
-
Absence reason
- Alcohol/ Drug addition
- Allergy
- Asthma (excl work related)
- Blood disorder
- Breast problems
- Cancer/ Tumors
- Chest/ Respiratory problems
- Cold/ Cough/ Flu/ Influenza
- Dental
- Diabetes/ Thyroid/ Endocrine
- Disease of nervous system
- Ear/ Nose/ Throat condition
- Epilepsy or Neurological
- Eye problem
- Gastrointestinal problems
- Gynae including period pains
- Headache/ Migraine
- Heart/ BP/ Cirulatory
- Infectious disease
- Kidney/ Bladder problem
- Non work Injury/ Burn/ Fracture/ RTA
- Non work Musculoskeletal problem
- Non work Back/ Disc problem
- Occupational Asthma
- Occupational Dermatitis
- Pregnancy related
- Scheduall Sickness code
- Stess/ Anxiety/ Depression (non work)
- Stess/ Anxiety/ Depression (work related)
- Swine flu
- Unknown cause
- Vertigo/ Dizziness/ Insomnia
- Virus
- Work Injury/ Burn/ Fracture/ RTA
- Work related Musculoskeletal problem
- Work related Back/ Disc problem
-
Is the absence work related?
-
Was this a linked absence?
-
Did Tech Expert visit a GP during their absence?
-
Number of absences in rolling 12 months?
- 0 (first absence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10+
-
How many?
-
Occupational Heath referral required?
-
Add any pictures of 'Fit To Work' certificates
-
Additional information
Reopen Visit Type and include 'ROD' if required
Post check
-
Date of Tech Expert visit
-
Did Tech Expert arrive within eta window?
-
How did the customer receive there eta?
-
Did Tech Expert introduce themselves to the customer?
-
Did the Tech Expert explain all work before, during and after visit
-
Was the survey promoted on this visit?
-
Is there anything else the Tech Expert could have done for the customer?
-
Additional comments
-
As a business is there anything else we could have done for the customer?
-
Additional comments
-
Tech Lead
DAMAGE CLAIM
-
Date of Tech Expert visit visit
-
Explanation of damage
-
Is further action required?
-
Add pictures to support findings
-
Tech Lead
Reopen Visit Type and include 'ROD' if required
COACHING
-
Reason for coaching
- NPS
- Technical
- Customer Service
- Completions
- Revisits
- Other
- Sky Q
-
Pre visit comments
-
Coach on site observations/ comments
-
Tech Expert comments
-
Follow up details (if required)
-
Tech Expert
-
Tech Lead
121
-
Reason for 121
- Praise/ Reward
- NPS
- Revisits
- Customer Service
- Technical
- Business Update
- DriveSafe
- Personal Matter
- Other
-
Current NPS YTD
- Below 65
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
-
Current revisit KPI % YTD
- Over 5
- 4.1 - 5
- 3.1 - 4
- 2.1 - 3
- 1.1 - 2
- 0.1 - 1
- 0
-
Details
-
Add pictures to support 121
-
Tech lead
Reopen Visit Type and include 'ROD' if required
ROD
-
Reason for ROD
-
Time and date
-
Tech Lead
-
Tech Expert
-
Tech lead
-
Tech expert
-
Tech Lead
-
Tech Expert
-
Tech Lead
-
Tech Expert