Title Page
-
Client / Site
-
Conducted on
-
Prepared By:
-
Location
-
Personell
On Site Quality Assurance Check List
-
DATE OF INSPECTION
-
DATE OF POUR
-
Add location
-
Has the sign in/out book been completed?
-
Screenshot weather for pour date & attach here
-
Has the vibration been completed correctly:
-
Add photo if required
-
Please advise any discrepency's in the vibration of the concrete overall:
-
Please supply pictures of the area of concern:
-
What remediation is required to correct this issue?
-
Add any notes
-
Are the heights +\~ 5mm?
-
Please advise any discrepency's in the floor levels overall:
-
Please supply pictures of the area of concern:
-
What remediation is required to correct this issue?
-
Add any notes
-
Add media
-
Are all edges / rebates tidy?
-
Please advise any discrepency's in the rebates overall:
-
Please supply pictures of the area of concern:
-
What remediation is required to correct this issue?
-
Add any notes
-
Add media
-
Trowelling around pipes and columns OK
-
Add any notes
-
Add media
-
Has any pump waste been left on site?
-
Are there tools left on site:
-
Notes
Site Tidy Checklist
-
Walls
-
Floors
-
Boxing
-
Kerbs
-
Rubbish free
-
Site swept
-
Please sign off the above information