Information

  • Document No.

  • Audit Title

  • Add media

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Peril

  • Site Personnel
  • Name

  • Grade

  • Employment

  • Others On-Site
  • Name

  • Reason at Site

CDM

CDM Project

  • Do proposed works fall under CDM definitions of "Construction Work"

Principal Designer

  • Are BELFOR the Principal Designer

  • Is the Pre-Construction Information (PCI) collated

  • Has the PCI Been Issued to Principal Contractor

  • Has the Health & Safety File Been Produced

  • Is the project reportable to the HSE and if so has this been completed and the F10 displayed

Principal Contractor

  • Are BELFOR the Principal Contractor

  • Has the PCI Been Received

  • Has the Construction Phase Plan been produced for all elements of work

  • Has the CPP been issued to all contractors and have they have they signed their agreement to it

  • Have Other Contractors Been Vetted and Approved

  • Have other Contractors RA/MS been approved

  • Have other Contractors been inducted

  • Has the H&S file been populated with all suitable documentation

General Safety Elements

Staff Induction

  • BKH F138 Combined Site Induction & PPE Register

  • CSCS Cards

  • Competence Cards

Risk Assessment

  • Completed by:

  • BKH F053 Task Specific Risk Assessment Register

  • Completed Fully

Method Statement

  • Completed by:

  • Covers All Works

PPE

  • Uniform

  • Safety Boots / Wellingtons

  • Suitable Gloves

  • Suitable Protective Clothing

  • Hard Hat

  • Hi-Vis Vest / Coat

  • Safety Glasses / Goggles

  • Suitable RPE

  • Suitable Hearing Protection

  • Safety Harness & Restraint Harness

Fire (Mandatory if PC)

  • Fire Extinguishers Suitable, Sufficient and Certificated

  • Fire Marshals Trained and Suitably Available

  • Escape Routes Identified, Signage in Place and Assembly Point(s) Identified

  • Fire Alarm System Suitable, Sufficient and Tested

  • Emergency Lighting in Place and Tested (If Necessary)

  • Suitable Storage For Flammable Chemicals / Gasses

First Aid (Mandatory if PC)

  • First Aider Present (Supervisor Must Have FAW)

  • Suitable, Sufficient and Stocked First Aid Kit

  • Suitable, Sufficient and Stocked Eye Wash

  • First aid provisions signed and First Aider list displayed

Welfare & Housekeeping

Welfare (Mandatory to provide if PC)

  • Wash Basins

  • Toilets

  • Rest / Eating Area

  • Cleanliness

  • Drinking Water

  • Cold Running Water

  • Hot Water or Ability to Provide

  • Heating

  • Lighting

House Keeping

  • Clear Access & Egress

  • Waste Materials Disposed

  • Site Safety Signage

General Hazards

  • Head Hazards

  • Condition Of Flooring

  • Slip/Trip/Fall

Manual Handling

  • Personnel Trained

  • Mechanical Aids Available / Being Used

Asbestos

  • ACM Survey Completed

  • Asbestos Register Present / Interpreted

  • ACM Risk

Chemicals

  • Chemical Folder Available

  • Correct PPE Worn

  • Chemicals Being Stored Correctly

  • Chemicals Being Disposed Correctly

Isolation

Electrical Isolation

  • Completed by:

  • Supervisors LO/TO system in place

  • Competent person proved dead

  • BKH F003 Permit To Work - Powered Plant in use

  • BKH F003 Permit To Work - Powered Plant completed correctly

  • Technician LO/TO system in place

  • BKH F003 Permit To Work - Powered Plant within agreed time periods

Tooling

Hand Tools

  • Visual Inspection Carried Out

  • Being Used Correctly

  • Suitable For The Task

  • Being Used By Trained Operatives

Electric Tools

  • Visual Inspection Carried Out

  • PAT Valid

  • Supporting Documentation Received / Operators Manual

  • Being Used Correctly

  • Suitable For The Task

  • Are risk assessments being complied with, especially vibration, noise and dust

  • Being Used By Trained Operatives

Other Tools

  • Visual Inspection Carried Out

  • Supporting Documentation Received / Operators Manual

  • Being Used Correctly

  • Suitable For The Task

  • Being Used By Trained Operatives

Access Equipment

Ladders

  • BKH F049 Ladder Check

  • Being Used Correctly

  • Suitable For The Task

  • Being Used By Trained Operatives

Mobile Aluminium Towers

  • PASMA Qualified

  • Erected Correctly

  • BKH F023 Mobile Aluminium Tower Inspection

  • Being Used Correctly

  • Suitable For The Task

MEWP

  • Supporting Documentation Received / Operators Manual

  • Within 6 Month Maintenance Schedule

  • BKH F050 MEWP Daily Check Report

  • IPAF Qualified

  • Being Used Correctly

  • Suitable For The Task

Rope Access

    Site Personel
  • Name

  • Grade

Staff Induction

  • Site Induction

  • First Aider Present (Supervisor Must Have FAW)

  • Competence Cards

Risk Assessment

  • Completed by:

  • Covers All Works

  • Communicated at Induction

Method Statement

  • Completed by:

  • Covers All Works

  • Communicated at Induction

PPE & Equipment

  • BKH F035 On-Site PPE Issue Register

  • Uniform

  • Safety Boots

  • Suitable Gloves

  • Suitable Protective Clothing

  • Suitable Helmet

  • Hi-Vis Vest / Coat

  • Safety Glasses / Goggles

  • Suitable RPE

  • Suitable Hearing Protection

  • Harness, Rope Ascenders/Clamps/Descenders & Lanyards

Tooling

  • Equipment Inventory Provided

  • Certificate of Conformity Available

  • 6 Month Thorough Inspection Available

  • Personal Access Kit Audit Available (Harness, Chest Harness, Descender, Back-Up Device)

Scaffolding

    Site Personel - BELFOR arranged only
  • Name

  • Grade

Risk Assessment - BELFOR arranged only

  • Completed by:

  • Covers All Works

  • Communicated at Induction

Method Statement - BELFOR arranged only

  • Covers All Works

  • Communicated at Induction

PPE & Equipment

  • Equipment Log of All PPE Bought To Site - BELFOR arranged only

  • Uniform

  • Hard Hat

  • Safety Glasses /Goggles

  • Suitable Gloves

  • Hi-Vis Vest/Coat

  • Safety Boots

  • Harness with Duel Lanyard

  • Certificate of Conformity for All Scaffolders Harnesses & Lanyards - BELFOR arranged only

  • 6 Monthly Inspection Records for All Scaffolders Harnesses & Lanyards - BELFOR arranged only

Construction Documentation

  • TG20:13 Compliance Sheet / Design & Calculations

  • Class 2 / 1.5kN/m2

  • Within 7 Day Inspection

  • Scaffold Inspector
  • Name

  • Grade

  • PPE Inspector - BELFOR arranged only
  • Name

  • PPE Inspectors Certificate

  • Handover Certificate Recieved

  • Competent BELFOR Scaffold Inspector Authorised Access

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.