Title Page

  • Site Eng# and Name

  • Location
  • Conducted on

  • Prepared by

AC & Generator

AC Power

  • AC Service Capacity? (If information is readily available) *Picture Required*

  • Are there any Unused CB Positions in AC Panel? *Quantity and Picture Required*

ATS Space Available

  • Is there space available for ATS and possible subpanel around electrical panels? * Photos of Space Required*

  • If answer to above was NO, is there space to mount NEMA box outside? *Pictures of available space*

Generator

  • Is there an existing generator? *Pictures if one exists*

  • Compound has space for a 20kW LPG or 10kW Delta generator with three propane tanks. * Photos required from different perspectives showing space*

  • Does the compound space allow for 3m clearance between generator and tanks, generator and shelter intake/exhaust, and propane and source of ignition?

  • Does the compound have space for a 40kW diesel generator? (Refer to Tony K's diesel generator install guidelines and compound drawing)

  • If a rooftop site, is there natural gas available on the rooftop? *Pictures if applicable*

  • If requested, create a sketch of the site compound including measurements and potential placement location(s) for a generator. Remember that 3m clearance is required between the generator and propane cylinders/tank. Propane cylinders/tank must also be 3m away from any source of ignition. Generator exhaust system must be 3m away from any intake/exhaust system on any shelter walls. Take a picture of the sketch to be included in the Site Audit. Please also insert the photo of the sketch into a Word document and upload to the Site's WTTP Project Documents folder.

Spigot

  • Does the shelter have a spigot? *Take pictures of the spigot and type of prongs*

Shelter & DC

Shelter

  • What is the shelter size? * Pictures Required*

Cooling

  • What type of cooling system does the site have? (Comment on Make, Model and capacity)

Rack

  • Is there space available on the 19" Radio rack to accommodate 2-rack-units of space for 2x EPU's (1RU each) or an E2 (2RU)? *Pictures Required*

  • If answer above was NO, is there space on a 23" PP or Battery rack for an E2? *Pictures Required*

  • Is there space in the 19" Radio rack for a 2RU BBU? *Pictured Required*

  • Is there space in the 19" Radio rack for a 1RU FPPA? Is there space on an existing FPPA? *Pictures Required*

DC Power

  • DC Current Draw:

  • DC Power Plant Type? * Take a picture of the power plant showing the rectifiers*

  • Number of Rectifiers:

  • Number of Rectifier Shelves:

  • Are there unused breaker positions on LVD1/LVD2? (Record number of unused CB positions) *Picture Required*

  • Does the shelter have DC lights?

  • Does the shelter have a DC fan?

Demark

  • Take clear photos of the demark box/wall.

  • Take clear photos of the conduit/waveguide window going into the shelter. Take one from inside the shelter as well.

Additional Info

  • Are there any spare capped conduits at the shelter/demark? *Pictures if applicable*

  • Any know special issues at the site? *Provide details in comments* (Ex: leaking roof, aging batteries, rodents, etc.)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.