Title Page
-
Add location
-
Conducted on
-
Prepared by
Kitchen Upgrade Post Inspection
-
Add location
-
Has the plumbing been installed to meet required standard?
-
-
Is the flooring laid smooth with upstands and capping sealed correctly to the walls.
-
Are the units and worktops level, free from scratches & chips
-
Is the sink top free from scratches, washing machine trap fitted, pipework satisfactory and the stop cock in a accessible position
-
Are the walls smooth, is the paint work clean and tidy and the cutting in satisfactory
-
Are there enough sockets, an LED light fitting installed and an extractor Fan installed to the correct specification
-
Is the tiling straight, flush, and grouted satisfactory
-
Customers signature to confirm kitchen is satisfactory
-
Surveyors signature to confirm works are satisfactory