Facility Description
Site Inspection
-
Does the facility separate waste on site?
-
Describe current waste separation in progress.
-
Summary of the rationale for waste audit.
-
What are the categories of waste separated?
- Food
- Mixed paper
- Confidential
- Cardboard
- Plastics
- Glass
- Medical biodegradable
- Medical non biodegradable
- Green (fine)
- Green (coarse)
- Oil
- Metal
- Electrical
- Batteries
- Paint
- Chemotherapy waste
-
Other waste categories not mentioned above.
-
Is there a kitchen on site?
-
How many staff on site each day?
-
What is the total footprint of the facility in m2?
-
Where is the proposed or potential site for placement of a digestor?
-
Photo of the proposed or potential site?
-
Where is the power in relation to the proposed site?
-
Does the facility use any compostable products?
-
Does the facility have gardens, garden beds or lawns to maintain?
-
What is the size in total of all gardens, garden beds and lawns in m2?
-
Does the facility have a FOGO waste management plan or policy?
-
Site Photos.
Current FOGO waste costs
-
Who is the current waste contractor?
-
What bin sizes are currently being used for FOGO?
- 120 L
- 240 L
- 660 L
- 1100 L
- 1.5 m3
- 3.0 m3
- 4.5 m3
-
How many bin lifts per week?
- 1
- 2
- 3
- 4
- 5
- >5
-
What is the weekly bin lift price?
-
Photos of FOGO on site.
-
Do they have a green waste contractor taking away additional organic waste?
-
How much green waste is transported offsite each week in kilograms?
-
Photos of green waste on site.
-
How far is the facility from the landfill station?
-
Are additional waste levy fees incurred?
Electrical
-
Who is the energy provider?
-
What is the price/kwh?
-
What is the power supply at the facility?
- single phase
- 3 phase
- both single and 3 phase available
-
Current wiring sizing and lengths.
-
Are the electrical diagrams and plans available?
-
Photos of existing plant specification plates.
-
Photos of existing plant system diagrams.
Addition Carbon Footprint Considerations
-
Where is the proposed location of a bio digestor? (Take a photo).
-
Is an additional shed or site preparation required?
-
Is there a clear and unobstructed pathway to the site by vehicle?
-
Details of additional space:
-
What additional trades will be required?
- Electrical
- Plumbing
- Concretor
- Builder
- Roofing specialist
- Other
-
Is the area airconditioned or require cooling for the PLC?
Additional Notes
-
Additional notes: