Title Page
-
Document No.
-
Job Number
-
Conducted on
-
Prepared by
-
Location
-
Site safety signage Board present
undefined
-
Site operatives supplied with correct PPE
-
Tool Box Talk Carried Out
-
Subject & reference of Talk
-
Names of attendees-
-
Welfare facilities on site?
-
undefined
-
Access and Egress clear
-
Action Taken to manage risk
-
undefined
-
Action taken to manage risk
-
New level of managed risk
-
Add media
-
Biological Hazards
-
Action Taken to manage risk
-
New level of managed risk
-
Buried Services
-
Action taken to manage risk
-
New level of managed risk
-
Add media
-
Confined Spaces
-
Action taken to reduce risk
-
New level of managed risk
-
Add media
-
Dust.
-
Action taken to reduce risk
-
New level of managed risk
-
Add media
-
Fire hazards.
-
Action taken to reduce risk
-
New level of managed risk
-
Add media
-
Working at height
-
Action taken to manage risk
-
New level of managed risk
-
Add media
-
Manual & Electrical Hand tools inspected prior to use
-
Action take to reduce risk
-
New level of managed risk
-
Add media
-
Public protection.
-
Action taken to reduce risk
-
New level of managed risk
-
Add media
-
Slips & Trips
-
Action taken to reduce risk
-
New level of managed risk
-
Add media
-
Waste disposed in line with regulations.
-
Action taken to reduce risk
-
New level of Managed risk
-
Add media
Asbestos
-
Any possible Asbestos Identified
-
Action taken
-
Level of managed Risk
Any other Hazards identified
-
Any other Hazards identified
-
Hazard
-
Level of Risk
-
Action taken
-
New level of managed Risk
Control measures
-
All works to be carried out in a controlled manor ensuring works do not exceed individuals capabilities.
-
All equipment will be appropriately inspected and maintained
-
Any ACMs noted then work to be ceased and reported immediately.
-
All health and safety procedures to be adhered to.
-
Emergency procedures to be understood.
Sequence of works
-
Ensure all operatives have signed in to site
-
Ensure all site operatives have been inducted
-
Ensure property has been stripped out as requested/ agreed
-
Ensure correct power supply is present
-
Work areas to be isolated / screened off.
-
Pre check all equipment and tools to be used.
-
Identify location/ placement of equipment.
-
Ensure all trailing cables are taped down, secured safely.
-
If holes / cuts to be made ensure areas are checked for buried services.
-
Ensure areas are clean/ dust levels are minimal prior to switching on blowers.
-
RCDs to be installed on all equipment used
-
install equipment in correct positions
-
Equipment to be switched on
-
intervals of monitoring visits to be established, weekly etc..
-
Ensure site is left in a safe, clean and tidy condition
-
Ensure site is secure on departure
Site Visitors
-
Reason for visit/ Company
-
Signature of visitor
-
Time visitor in
-
Time visitor out
In case of Emergency
-
Location of Nearest hospital
Accident Register
-
Name of Injured party
-
Description of incident/Injury
-
Action taken
Any item requiring immediate Action
-
undefined
Assessment completed by
-
Add signature