Title Page

  • Document No.

  • Job Number

  • Conducted on

  • Prepared by

  • Location
  • Site safety signage Board present

undefined

  • Site operatives supplied with correct PPE

  • Tool Box Talk Carried Out

  • Subject & reference of Talk

  • Names of attendees-

  • Welfare facilities on site?

  • undefined

  • Access and Egress clear

  • Action Taken to manage risk

  • undefined

  • Action taken to manage risk

  • New level of managed risk

  • Add media

  • Biological Hazards

  • Action Taken to manage risk

  • New level of managed risk

  • Buried Services

  • Action taken to manage risk

  • New level of managed risk

  • Add media

  • Confined Spaces

  • Action taken to reduce risk

  • New level of managed risk

  • Add media

  • Dust.

  • Action taken to reduce risk

  • New level of managed risk

  • Add media

  • Fire hazards.

  • Action taken to reduce risk

  • New level of managed risk

  • Add media

  • Working at height

  • Action taken to manage risk

  • New level of managed risk

  • Add media

  • Manual & Electrical Hand tools inspected prior to use

  • Action take to reduce risk

  • New level of managed risk

  • Add media

  • Public protection.

  • Action taken to reduce risk

  • New level of managed risk

  • Add media

  • Slips & Trips

  • Action taken to reduce risk

  • New level of managed risk

  • Add media

  • Waste disposed in line with regulations.

  • Action taken to reduce risk

  • New level of Managed risk

  • Add media

Asbestos

  • Any possible Asbestos Identified

  • Action taken

  • Level of managed Risk

  • Any other Hazards identified
  • Any other Hazards identified

  • Hazard

  • Level of Risk

  • Action taken

  • New level of managed Risk

Control measures

  • All works to be carried out in a controlled manor ensuring works do not exceed individuals capabilities.

  • All equipment will be appropriately inspected and maintained

  • Any ACMs noted then work to be ceased and reported immediately.

  • All health and safety procedures to be adhered to.

  • Emergency procedures to be understood.

Sequence of works

  • Ensure all operatives have signed in to site

  • Ensure all site operatives have been inducted

  • Ensure property has been stripped out as requested/ agreed

  • Ensure correct power supply is present

  • Work areas to be isolated / screened off.

  • Pre check all equipment and tools to be used.

  • Identify location/ placement of equipment.

  • Ensure all trailing cables are taped down, secured safely.

  • If holes / cuts to be made ensure areas are checked for buried services.

  • Ensure areas are clean/ dust levels are minimal prior to switching on blowers.

  • RCDs to be installed on all equipment used

  • install equipment in correct positions

  • Equipment to be switched on

  • intervals of monitoring visits to be established, weekly etc..

  • Ensure site is left in a safe, clean and tidy condition

  • Ensure site is secure on departure

  • Site Visitors
  • Reason for visit/ Company

  • Signature of visitor

  • Time visitor in

  • Time visitor out

In case of Emergency

  • Location of Nearest hospital

  • Accident Register
  • Name of Injured party

  • Description of incident/Injury

  • Action taken

Any item requiring immediate Action

  • undefined

Assessment completed by

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.