Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

GENERAL SITE ISSUES

  • Has suitable provisions been made for toilet, washing and general facilities?

  • Are proper arrangements in place for collecting and disposing of waste materials?

  • Is suitable first aid in place?

  • Are all operatives aware of the emergency procedures for the site in case of fire or evacuation?

  • Is access to the roof/cladding works adequate and safe?

  • Is edge protection in place?

  • Are fragile roof areas such as cement sheets and roof lights protected?

  • Is the area below roof and cladding works safe from other workers?

  • Are all fire escapes clear?

Site Safety

  • Are there ladders / steps in use?

  • What are there condition?

  • Is there scaffold/Towers in use?

  • What is the condition?

  • Is there lifting equipment in use?

  • What is its condition?

  • Are the relevant fire extinguishers available?

  • Are they in date and in working order?

PPE

  • Is all site specific PPE being worn?

  • Are harness being worn and clipped on?

  • Is replacement PPE available?

Documentation

  • Any new operatives must be fully inducted BEFORE they commence work

  • Have all operatives been inducted?

  • Have all toolbox talks been done?

  • What was the subject of the tool box talk?

  • Please add photo of tool box talk

  • Add signature

  • Add signature

  • Add signature

  • Add signature

  • Are all Risk and Method statements up to date?

Progress

Work area progress

  • Roof/work area name

  • Description of work?

  • Approximate square meterage?

  • Percentage complete?

  • Photo of work area

  • Information in regards to jobs progress.

  • Is the area ready to be handed over?

  • Any defects or outstanding works at time of handover?

  • Date of hand over?

  • Clients Signature

  • Managers Signature

  • Is there any other areas?

  • Roof/work area name

  • Description of work?

  • Approximate square meterage?

  • Percentage complete?

  • Photo of area.

  • Information in regards to jobs progress.

  • Is the area ready to be handed over?

  • Any defects or outstanding works at time of handover?

  • Date of hand over?

  • Clients Signature

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.