Information

  • IES/CI - Project Safety Inspection Checklist

  • Project Details

  • Project Name:

  • Project Description and nature of work:

  • Number of IES employees at site:

  • Number of temporary workers/laborers at site:

  • Conducted on

  • Prepared by

  • Location
  • Division Safety Manager:

  • Division General Manager:

  • General Requirements and Postings - CFR 1926 Subpart C & D

  • First Aid kit on site, accessible and stocked?

  • Is a bloodborne pathogens kit available?

  • Emergency phone numbers and emergency action plan available?

  • Safety Meeting Logs current?

  • Truck Kits present in all vehicles?

  • Vehicle and Equipment inspections current?

  • Do all employees have an IES Safety Training Card on their person?

  • Are Subs complying with the IESR safety policies and procedures?

  • Comments:

  • T-Pole Electrical - IES Safety Program Section 5; CFR 1926 Subpart K

  • T-Pole is in good condition?

  • All holes in T-Pole enclosure have been properly plugged?

  • All breakers missing have blank filler?

  • Is there a legible panel directory in each T-Pole panel or are the breakers marked legibly?

  • 120 volt, 15 and 20 amp GFCI is provided?

  • Each GFCI is tested and checklist on T-Pole is current?

  • Every energized device on T-Pole has a cover?

  • Comments:

  • Fall Protection - IES Safety Program Section 7; CFR 1926 Subpart M

  • Is Fall Protection being used if needed or required?

  • Guardrails and stair rails are in place?

  • Holes or openings 2" or larger have covers?

  • Comments:

  • Ladders - IES Safety Program Section 6; CFR 1926 Subpart X

  • Are the spreaders on step ladders locked?

  • Are step ladders inspected before use? Verify with employees.

  • All step ladders have legible manufacturer labels?

  • Employees maintain body positioning inside the area of the ladder legs?

  • Are ladders turned in the proper position so that the employee faces the ladder while working on it?

  • Are employees maintaining the 3-point rule while ascending and descending ladders?

  • Are employees using properly rated ladders?

  • Have employees received ladder training? (Check training cards.)

  • Are extension ladders 3 feet above landing, secured, and 4:1 angle?

  • Are General Contractor job-made ladders built and installed properly?

  • Comments:

  • Tools - IES Safety Program Section 8; CFR 1926 Subpart I

  • Are all power tools in good condition and in proper working order?

  • Are electrical cords and plugs in good condition and proper working order?

  • Do all drill motors used for boring wood have a handle for the second hand?

  • Are drill motors used for boring wood being operated using 2 hands?

  • Power tools either grounded or double insulated?

  • Comments:

  • Housekeeping and Material Handling - CFR 1926 Subpart C

  • Is the housekeeping adequate?

  • Are nails removed or bent over?

  • Are potential slips/trips/falls hazards present?

  • Comments:

  • Personal Protective Equipment - CFR 1926 Subpart E

  • Are all IES employees wearing hardhats?

  • Are all IES employees wearing above-the-ankle, lace-up, safety boots with steel or composite toe?

  • Are all employees wearing necessary safety glasses?

  • Are all employees wearing gloves?

  • Comments:

  • Signature of IES DSM:

  • Signature of BMBRisk auditor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.