Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

PPE

  • Are Safety Glasses being worn?

  • Are Safety Vests and/or High Vis Clothing being worn?

  • Is Hearing Protection required?

  • Are steel toed boots being used?

  • Are Hard Hats being used?

  • Are Gloves being used?

  • Are respirators required?

  • Are Face Shields Required?

Equipment

  • Is a Tripod required for the project?

  • Has the Tripod been inspected for the project?

  • Have all Retractable lifelines been inspected?

  • What is the Condition of the Retractable?

  • Have all Winches been inspected?

  • What is the condition of the winch?

  • Have all Body Harnesses been inspected?

  • What is the condition of the Harnesses?

  • Are Air Monitors available for the project?

  • Are all Air Monitors Calibrated?

  • Have all Air Monitors been Bump Tested?

  • Is Manhole barrier readily available?

  • Has Manhole barrier been mounted and secured?

  • Is Radio communication being used for this project?

  • Are all radios charged and properly functioning?

  • Have all electrical cables and Cords been inspected?

Documentation

  • Are MSDS on hand and available?

  • Have chemicals been approved by P.M. and Site Coodinators?

  • Is correct P.P.E. being worn when handling Chemicals?

  • Is eye wash and first aid kits readily available?

  • Are fire extinguishers available and accessible?

  • Is spill kit readily available; Specified for grout spill?

  • Are all Equipment operators properly trained?

  • Has checklist for grout packer been completed?

  • Is Confined Space entry required?

  • Are all confined space entrants properly trained?

  • Is Confined Space entry Permitted or Non-Permitted?

  • Is all Confined Space entry forms completed, signed, and Submitted?

Procedures

  • Is man hole blocked and barricaded from any unauthorized entrants?

  • Is lock-out/Tag-out required for this project?

  • Does everyone know the LOTO procedure?

  • Is a rescue team on hand or has been notified of the project?

  • Is there an emergency contact number?

  • What is the emergency contact number?

  • Does the project require traffic control?

  • Are the proper personnel trained for traffic control?

  • Is the proper signage readily available for traffic control?

  • Is proper housekeeping being conducted? (ex. No Slip, Trip, or Fall Hazards)

  • Has pipe been Jetted and Televised?

  • Has Jetter Truck been inspected?

  • Has Grout rig been inspected?

  • Is Containment installed under all required vehicles?

  • Have all cables and cords been inspected for frays/damage?

  • Have all tools been inspected and in proper working use?

  • Has Grout packer been assembled and safe to operate?

  • Has an initial reading (Top, Middle, Bottom) of the pipe been conducted with Air monitor?

  • What time was the grouting started?

  • What time was the grouting finished?

  • Was the attendant taking constant readings?

  • Were there any injuries (Cuts and Abrasions) during the task?

  • Was the site properly cleaned after completion of project?

  • Have all documents including permit been signed off and delivered to customer?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.